Arched French doors sit at an awkward point in most project schedules. They are visible enough to define a room, expensive enough to affect the joinery budget, and early enough in the programme that a wrong specification is difficult to unwind once openings are framed out. The Santerson Arched French Doors listing is deliberately open-ended: made-to-measure sizing, material and finish options, and a layout set per project. That flexibility is the reason to buy it and the reason to specify it carefully. The checklist below covers what buyers and specifiers should settle before a door order is confirmed.
Start With the Opening, Not the Door
A made-to-measure product only performs as well as the dimensions behind it. Arched units are less forgiving than rectangular ones, because the curve fixes two variables at once: the clear opening width and the radius or height of the arch head. Before you compare finishes, confirm these items from site drawings rather than from a sample sheet:
- Clear opening width and the height to the springing point, where the straight jamb stops and the curve begins.
- Total height of the arch head, and whether the arch is meant to match an existing curve or a ceiling line.
- Floor finish build-up. A door ordered against structural slab height will not clear a screed, adhesive and stone or timber topping.
- Wall make-up at the reveal, including plasterboard, lining, architrave or concealed frame detail, which decides how the frame is seated.
- Whether the opening carries other trades: lighting switches, curtain tracks or air-conditioning grilles near the arch.
For villa and hospitality work, this is where a supplier who also handles windows and doors, wall panelling and cabinetry earns their place. The same drawing set can govern the door frame, the adjoining panel and the nearest built-in unit, so inconsistencies get resolved once instead of on site.
Decide the Role the Door Plays in the Room
Arched French doors are specified for two different jobs, and the specification should differ accordingly. The first is a pair of doors between interior rooms, such as a study to a living room or a corridor to a principal suite, where the arch carries the visual language of the scheme. The second is a door to an exterior or semi-exterior space, where light, sightlines and threshold detail matter more than decoration.
If the goal is light without losing privacy, glazing choice becomes the main decision rather than the frame. If the goal is a clean wall when the doors are closed, then panel layout and finish continuity with the surrounding joinery matter more. Write down which job the door is doing before you look at samples; it changes what you should be comparing.
Match Style to the Scheme, Not to a Catalogue Name
SANTERSON's French doors collection covers several distinct expressions of the same form. The arched profile reads differently depending on frame proportion and glazing bar layout:
| Collection option | Where it tends to work |
|---|---|
| Santerson Arched French Doors | Schemes where the curved head is the feature: classic, transitional and French-influenced interiors, and openings that repeat a curve elsewhere in the room. |
| Santerson Modern Slim Frame French Doors | Contemporary interiors where a narrow sightline and maximum glass are the priority, and the arch profile needs to stay quiet. |
| Classic French Double Doors | Straight-headed openings in the same project, where you want matching glazing bars and finish but no arch. |
Collection comparison drawn from the published product listings; each option is configured per project.
Buyers often compare these three on price alone. A more useful comparison is sightline width, glazing bar spacing, and whether the supplier can produce the straight-headed and arched versions from one detail so the two read as a family across the project.
Treat Finish Selection as a Written Specification
Because finish is an option rather than a fixed attribute, the order confirmation needs to state it explicitly. In practice that means:
- Frame material and substrate, recorded in writing rather than only as a sample name.
- Finish type and sheen level, with a signed physical sample reference kept on file.
- Colour or veneer matching approach where the door must sit against wall panelling or cabinetry from the same package.
- Hardware assumptions: handle position on a curved rail, hinge type and count, and whether closers or magnets are included.
- Glazing specification, including glass build and any patterned or frosted interlayer, confirmed against the drawing.
The product page for this line states that dimensions and selected specifications must be confirmed for each project. Treat that sentence as a hard gate in your sign-off process: nothing should enter production until the dimension sheet and finish sheet are both approved by the same person.
Price the Whole Package, Not One Door
A single arched door is rarely bought alone on a villa or hospitality project. Doors, wall finishes, flooring and built-in storage usually arrive from different suppliers with different tolerances, and the interface details are where cost leaks appear. Consolidating related items reduces the number of coordination meetings as much as it reduces paperwork.
SANTERSON works as a manufacturer and one-stop supplier for furniture and building materials, covering interior fixtures, doors and windows, wall panels and cladding, engineered wood flooring and built-in furniture, with custom and OEM work where a project needs a bespoke detail. The company has operated since 2008 and describes turnkey delivery from design and production through to door-to-door logistics, installation support and after-sales service.
Published Australian project references include Platin Housing villas at Willoughby, Perth and North Turramurra, plus renovated villa work in Melbourne and Sydney. Those cases are a reasonable basis for judging whether the supplier has handled this category of residential scope; ask for the specific door schedule, drawings and delivery record relevant to your project before treating any single case as a guarantee of performance.
Run the Supplier Through Five Questions
- Can you produce a dimension drawing for my opening, including the arch radius and springing height, for my approval before production?
- Which physical finish samples correspond to the quoted price, and are they retained as the reference standard?
- What is excluded from the quoted unit: frame extensions, architraves, hardware, glazing upgrades, threshold detail?
- How are doors packed and sequenced for a multi-unit order, and how are they identified against room schedules on site?
- What happens if an on-site opening varies from the approved dimension: who revises the order, and what does it cost?
The last question matters most on arched work. Re-profiling a curved head is not a small adjustment, so the variation process should be agreed in writing before the order, not discovered when frames arrive.
A Practical Sequence for Signing Off
For most buyers the decision becomes straightforward once it is ordered in the right order. Survey the opening and record arch geometry. Fix the role of the door: light, separation or both. Choose arched, slim-frame or straight-headed profiles against the scheme rather than the price list. Lock finish and hardware in writing with a retained sample. Confirm exclusions and the variation process. Only then place the order.
Send your opening dimensions, room schedule and reference images to SANTERSON for a specification proposal, and ask for a drawing back before you commit production.
Enquire about arched French doors for your project
Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the contact page. Business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8). Include opening width, arch height and springing point, floor finish levels, and the rooms the doors serve.