A swim spa of this size sits between a pool and a spa, and it carries the consequences of both: structural loading, an electrical supply that has to be specified before the shell arrives, and a water treatment system that someone has to operate for years. Before a project team signs off on Outdoor Swim Spa WS-S07B-T, the following items should be closed out in writing, because most of them are far cheaper to resolve at drawing stage than on site.

Start with what the catalogue actually says

The published record for this model is short and specific, and it is worth reading literally rather than assuming the configuration matches a sibling model. The catalog lists a shell of 7000 × 2200 × 1365 mm, one control system, one swim training system, one water pump, one filter pump, a jet total of 44 pieces, three LED lights plus 26 small LED lights, and a total power figure of 8.75 kW. The features shown are water jets, LED lighting, ozone and a swim training system.

Two things in that list deserve attention before anyone treats the model as fixed. First, the total power figure is a catalog value for a stated configuration; it moves once options such as a heat pump or a different filtration route are added. Second, the "-T" designation corresponds to the swim training system appearing in the specification, and neighbouring models in the same series carry different jet counts, pump counts and power figures with different feature sets. Confirming which variant is being quoted, and against which page, prevents a procurement file from describing one unit while the invoice describes another.

Item to confirmWhy it blocks approval
Catalog dimensions 7000 × 2200 × 1365 mm, plus clearance and accessThe shell envelope is only part of the footprint; delivery route, lifting access, plant clearance and maintenance reach all sit outside those numbers.
Total power 8.75 kW as catalogued for the quoted configurationElectrical design follows the final option list, not the base figure. Re-running a sub-board after the shell is on site is expensive.
Jet total of 44 pieces and pump arrangementJet count and pump count drive hydraulic performance, noise and circuit loading; they should match the specification the consultant has coordinated.
Ozone as the stated sanitation featureOzone is an oxidation aid, not a full disinfection regime. The residual disinfection method still needs to be agreed and documented for whoever operates the unit.
Optional accessories on this order onlyThe catalog lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so each line needs a yes or no per configuration.

Site conditions the manufacturer cannot decide for you

A 7-metre shell is a structural and drainage decision before it is a product decision. The project team, not the supplier, owns the following:

  • Support and loading. Whether the unit sits on a slab, a deck, a plinth or a recessed pit, the supporting structure has to carry the filled weight plus occupants, and the finished surface has to be level and continuous under the full base.
  • Drainage and overflow. Where discharge water goes, how the plant area stays dry, and how anyone reaches the equipment without crawling under a fitted finish.
  • Electrical supply and protection. The supply characteristics have to be established locally by the project's electrical engineer, together with the required protection and isolation. Do not read a catalog power figure as a completed electrical design; local requirements are set by the authority having jurisdiction on that project.
  • Circulation and privacy. In a villa or hospitality setting, sightlines from bedrooms, terraces and neighbouring units change how the unit should be oriented — and orientation is fixed once the shell is delivered.
Practical rule: treat the catalog specification as an input to coordination, not as the coordination itself. Dimensions, power and equipment counts are all stated for a configuration; the approved configuration is what gets built around.

Configuration, options and what changes after order

The options that matter most on a project are the ones that alter the envelope or the services. Insulation affects how the unit behaves in cooler months and how it is enclosed. A heat pump changes electrical loading. Sand filtration and UV sterilization change plant space and maintenance routine. Steps change the approach and the finished level around the shell.

Where a project needs something outside the standard range, Custom & OEM Service covers bespoke design, material and finish choices and manufacturing to specification. The useful discipline here is to lock the option list once, issue it as a single controlled document, and refuse verbal substitutions between that point and production.

Delivery, installation and who answers afterwards

A swim spa arriving door to door still needs an installed, commissioned unit at the other end. Logistics & Door-to-Door Delivery covers freight forwarding, customs paperwork, packaging and container loading through to delivery; Installation & After-sales Support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance.

For a project file, three questions should be answered in the contract rather than assumed from marketing copy: which scope is performed by the supplier's team and which by the local contractor; what the warranty actually covers and for how long on this configuration; and who holds the spare-parts position for pumps, jets and controls once the unit is in service. Response-time promises vary by project and region, so they belong in writing before approval.

A sign-off checklist

  • Model variant confirmed against the quoted specification page, not a series average.
  • Option list frozen: heat pump, UV, sand filtration, insulation, steps, control system — each accepted or declined.
  • Structural support, drainage and plant access drawn and coordinated with the shell dimensions.
  • Electrical design issued by the project engineer against the final configuration.
  • Operating responsibility named: who doses, filters, tests and maintains after handover.
  • Delivery route, lifting method and installation sequence agreed with a division of scope.
  • Warranty terms, exclusions and spare-parts supply confirmed for this unit.

Common questions at approval stage

Is the 8.75 kW figure the final electrical load?

It is the catalog total power for the stated configuration. Adding options such as a heat pump changes it, so the electrical design should follow the confirmed option list and be completed by the project's electrical engineer to local requirements.

Does ozone mean no chemical maintenance?

No. Ozone is listed as a feature of this model, but it does not remove the need for a residual disinfection and water-testing routine. Agree the regime with the supplier and name the operator before handover.

How does this model differ from others in the same series?

Shell depth, jet count, pump count, power and feature set all vary across the series. Compare the specific product page for the variant being quoted rather than assuming consistency across models.

Confirm the configuration before you approve it. Send the drawing package and your option list, and we will return a specification matched to your project — including delivery scope and installation support. Contact PHILLIP on WhatsApp +86-13928214007 or via the enquiry page.