A wardrobe enquiry that arrives with a room drawing, a finish reference and a clear scope usually comes back with a usable quotation within days. The same enquiry without those details goes back and forth for weeks, and the price you finally see is rarely comparable with anyone else's. High gloss veneer wardrobes sit in an awkward middle ground: they are made-to-measure joinery, but their cost is driven by decisions that have nothing to do with size. Before you contact a supplier, get the items below into writing.

Room dimensions, and how far they have been verified

Send overall width, height and depth for every wall the wardrobe will occupy, plus the position of doors, windows, skirting, power points, downlights and any bulkhead. Say plainly whether those figures came from an architectural drawing or from tape on site. A supplier can price from a drawing; they cannot price around cornice you never measured.

If the room is still being built, tell us which surface the wardrobe will meet — framed wall, plasterboard, concrete or an existing finish — and whether the floor is level. Veneer-clad carcasses are installed against finished surfaces, so substrate and tolerance change both the detail and the fixing method.

The finish you actually want, in words and in samples

"High gloss" describes a surface; it does not describe a wood. Tell the supplier which species and cut you have in mind — walnut, oak or another veneer — and whether grain direction runs vertically or horizontally across the doors. Grain matching across a run of wardrobe fronts is one of the first things that separates a good installation from a disappointing one, and it has to be specified before production.

The High Gloss Veneer Wardrobes page in our Wood Veneer collection is the starting point most buyers use. If you are still weighing gloss against a softer surface, compare it with Matte Finish Veneer Wardrobes and Walnut Veneer Wardrobes so the shortlist is realistic before prices are requested. Gloss fronts reflect everything in the room, including the window wall, so a photograph of the space at its brightest hour tells the supplier more than a colour name.

Interior layout and what you intend to store

Count hanging garments by type — long dresses, shirts, jackets — rather than giving one total. Then list drawer count, shelf runs, shoe storage, ironing or vacuum bay, safe, lighting inside the carcass and any glass or acrylic front you want in the mix. A hanging rail height for a full-height wardrobe differs from a bedroom with a low ceiling, and drawers near the floor need a different runner specification than drawers at waist height.

If the same design language continues into other rooms, mention it now. Wardrobes, vanity units and media walls made in one project run are far easier to keep consistent than three separate orders placed months apart.

Door system and clearance

Question to answerWhy the supplier needs it
Sliding, hinged, pocket or folding?Determines track load, ceiling reinforcement and the minimum clearance in front of the opening.
How wide is the walkway in front of the wardrobe?Hinged doors need swing clearance; sliding doors need overlap and a headroom for the track.
Handleless, integrated profile or visible handle?Affects edge detail on gloss fronts and how the panels are joined.
Full height to the ceiling, or a top panel?Reaches and dust sealing change the carcass build.

Scope, quantities and dates

State whether you are buying one wardrobe for a single dwelling or a set of wardrobes across several apartments or villas. Quantity changes both the quotation and the production sequence, and it decides whether a sample front is worth making before the full run. Give the required site date, then say what has to be finished before the wardrobes go in — flooring, paint, glazing, stone benchtops.

If you are a builder, designer or retailer placing this order for a client, say so and name who signs off the shop drawings. Our Custom & OEM Service covers bespoke finishes and prototyping alongside OEM production with flexible minimum order quantities, which is the route most trade buyers take.

Delivery terms and who installs

Tell the supplier the delivery address, whether it is a private residence or a controlled-access site, and whether there is a lift, a service ramp or only stairs. Then state what you expect from the supplier: panel-only delivery to the door, or delivery with installation support. Our Logistics & Door-to-Door Delivery service covers freight arrangements and the paperwork that goes with them, but the incoterm you want — FOB, CIF or delivered to site — has to be stated in the enquiry, because it changes the number on the quotation.

Before you write: what to prepare and what to ask back

  • Room drawings or on-site measurements, with a note on their source
  • Finish preference: species, cut, gloss level, and a reference image or sample
  • Interior layout list with quantities
  • Door system and front clearance
  • Quantity, required site date, and the trades that precede installation
  • Delivery address, access conditions and preferred incoterm

Send those six items in one message and the first response is a specification review with questions, not a request for information you already had. Follow-up then moves to drawings and pricing instead of to fact-finding.

Three questions to put to the supplier

  • How are veneer grain and gloss matched across adjacent fronts, and what tolerance applies on site?
  • Which carcass board and edge treatment are specified for a bedroom environment, and what fixing detail is used against your wall type?
  • What is the sequence for approving a finish sample before the panel run is cut, and who signs the shop drawings?

A supplier who answers those three with specifics is describing how they actually build. A supplier who answers with adjectives is selling you a brochure.

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with made-to-measure wardrobes produced under our custom and OEM programme. Send your drawings, finish reference and quantities through our contact page, and we will come back with a specification review before quoting.