A set of wood grain pvc cabinet doors usually arrives on site months before the kitchen can be signed off. The panels travel well, but they land in a building that is still wet, still dusty and still crowded with other trades. Delivery and installation are where most cabinet problems actually start: crushed carton corners, warped fronts stored against an external wall, hardware delivered to the wrong address, and a site that cannot receive the truck on the day it turns up. The checklist below follows one project from purchase order to handover, so the cabinetry package is planned as part of the programme instead of being left to chance.
1. Lock the specification before the production slot
Cabinetry is made to measure, and every late change resets both the manufacturing queue and the delivery date. Our Custom & OEM Service covers custom furniture design and prototyping, bespoke finishes and textures, and OEM production with flexible order quantities - all of which only help if the drawings are frozen. Before an order is released, confirm these items in writing:
- Final room dimensions and floor levels, taken on site rather than from drawing issue alone.
- Layout and door swing direction for each run, including corner units and appliance housings.
- Wood grain pattern, sheen level and the side of the panel that will be visible when doors open.
- Edge treatment and profile detail on handles, mouldings and any glazed front.
- Hinge, runner and handle brand or model, plus who supplies them: us or the local merchant.
- Site address, delivery hours and whether a tail lift or manual offload is required.
For the wood grain pvc cabinet range specifically, our product page states that sizing, material, finish and layout are specified per project, and asks buyers to confirm dimensions and selected specifications for each project. Treat that confirmation as a document with a date and a signature, not an email thread.
2. Build the delivery window around site readiness
Work backwards from your target handover date and give the cabinets a receiving slot of their own. The table below covers the site conditions that most often damage PVC-wrapped fronts or stall the fit-out:
| Site condition | What to do about it |
|---|---|
| Wet trades still running - plaster, screed, paint, tile adhesive | Schedule cabinet delivery after those trades have finished and the room has dried out. Panel edges and machined hinge bores are what suffer first in a damp room. |
| No secure, covered storage | Do not accept an early drop. If the site cannot store cartons flat and dry, ask for a later delivery or hold the package with the forwarder. |
| Multiple trades in one small kitchen | Book the cabinets as a named delivery slot with the builder, so the cartons are not moved repeatedly to make room for other work. |
| Appliances and worktops on separate orders | Put cut-out dimensions and appliance models into one coordination sheet. Worktop templating normally follows carcass installation, so sequence it after the cabinets are fixed true. |
| Upper wall units against partition walls | Confirm the fixing substrate with the builder before installation day. Packers and brackets cannot compensate for a wall that was never built to carry load. |
3. Split the shipment so nothing waits for the slowest item
Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. The documents our logistics team handles include commercial invoices, packing lists, certificates of origin and import permits, with cargo insurance options and a dedicated coordinator on the file.
Two practical decisions matter more than the mode of transport:
- Separate hardware from panels where possible. Hinges, runners and handles are small, expensive to replace and easy to lose in a mixed container. Keeping them in a marked sub-package means installation can start even if the panel cartons are still in customs.
- Label by room and elevation, not by carton number alone. A mark such as "Kitchen - North run, left base unit" tells the site team where each carton belongs and stops installers opening everything at once.
Import terms, duties, Incoterms, insurance cover and transit time are settled per project with your forwarder. Ask for them in writing on the quotation so the landed cost and the delivery date sit on the same page as the production lead time.
4. Receive the goods properly on day one
A short, documented receiving routine protects both the buyer and the manufacturer if something is damaged in transit:
- Photograph cartons on the truck before unloading, then again after they are stored.
- Count cartons against the packing list and note any difference on the delivery note before signing.
- Open one door of each finish type and check grain direction, sheen and edge banding against the approved sample.
- Check carcass squareness on one unit and confirm hinge bores match the specified hardware.
- Report any shortage or damage to us the same day, with photos and the carton marking.
Store cartons flat on battens, off the floor, in a room that has been made watertight and heated. Do not lean wrapped doors against an external wall overnight.
5. Installation sequence and site support
Our Installation & After-sales Support service lists on-site installation, inspection and snag resolution, warranty coverage, spare parts and replacement, and ongoing maintenance. Whatever the local arrangement turns out to be for a specific project, the technical order of work is the same:
- Set the base carcasses level and line first; scribe and pack to the actual floor, not the drawing.
- Fix wall units to a confirmed substrate, checking for level along the whole run before hanging doors.
- Fit doors and drawers, then adjust gaps and alignment with the finished walls in place.
- Mark worktop cut-outs and appliance positions on the carcasses for the trades that follow.
- Walk the job as a snag list: every door aligned, every runner running freely, no protective film left on visible edges.
6. Handover records that make after-sales quick
At completion, file the following together: the approved specification sheet, the packing list with carton markings, delivery photographs, the snag sign-off, and the finish reference used on site. With those five documents, a replacement part or an adjustment request can be handled without reopening the whole order.
Where the cabinets sit in a wider fit-out
Kitchens rarely stand alone. In villa and apartment work we supply cabinetry alongside Interior Fixtures, flooring, wall panels, lighting and bathroom products, which means one coordination sheet can cover the whole fit-out instead of six separate supplier schedules. Our One-stop Solution covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, and final installation and handover. The products catalogue lists the ranges available for specification.
Send us your kitchen drawings, target delivery month and site address, and we will confirm what can be produced, shipped and installed against that programme.