A pocket door saves the floor swing a hinged leaf takes up, and a glazed one does something more: it lets daylight travel through a wall that would otherwise be solid. That combination makes Santerson Glass Pocket Doors an easy product to fall for in a villa or apartment plan, and an equally easy one to specify badly. Because the door disappears into the wall, most of what can go wrong is decided before anyone opens a box.

The questions below are the ones worth putting to a supplier, and to your own drawing set, before an order is placed. They follow the way these doors are actually made: Windows and Doors of this kind are built to the openings on site, not picked from a shelf of stock sizes.

1. What is the opening, and what is behind it?

A pocket door needs three things a hinged door does not: a clear cavity inside the wall for the leaf to slide into, a header that carries the frame and the hardware, and enough side clearance for the jamb and the track. Before you send an enquiry, be ready with the structural opening width and height, the finished floor level, the wall build-up, and whether the wall is new work or a retrofit into an existing partition.

In new build the cavity is designed in. In a retrofit it has to be created, and that changes the scope: studs are moved, the header is rebuilt, and any pipe, cable or duct in the pocket has to be relocated. Ask your supplier at quotation stage whether the wall preparation is included or whether it stays with the site builder. That single line item is the most common source of a surprise on site.

If you can only send one measurement set, send the rough opening and the finished floor-to-ceiling level. Everything else follows from those two numbers.

2. Which glass, and for which room?

Glass is not one specification. The same pocket-door leaf can be specified with clear, frosted or tinted glazing, and the choice should follow the room rather than the render.

  • Bathroom and ensuite: obscured or frosted glazing keeps light moving between the bedroom and the bathroom while keeping the wet room private.
  • Study, media room or office nook: clear glass with a slim frame keeps a small room feeling connected to the space beyond it.
  • Closet, pantry and utility: a more reflective or tinted leaf reads as a finish surface when the door is closed, so it should be coordinated with the joinery around it.

Also ask how the glazing is set into the leaf, what edge detail is used, and what happens at the bottom of the door where a glass leaf meets a floor finish. These are the points where a specification either looks built-in or looks added on.

3. What hardware carries the leaf, and how is it serviced?

Glass is heavy for its area, so the track, hangers and floor guide are the real product. Ask which hardware set is quoted, what leaf weight it is rated for, and whether the mechanism can be adjusted after installation. A door that binds a year later, once a building has moved and floor finishes have settled, should be correctable from the face of the door rather than by opening the wall.

Ask the same question about the finish. Frame colour, veneer or metal finish, glass tone and ironmongering are all specified separately, and each one you change can change the hardware that suits it. Confirm the combination, not the individual parts.

4. Is the order made to your opening, or is your opening being changed to fit the order?

This is where a project either holds together or starts to compromise. The glass pocket door collection is specified with made-to-measure sizing, material and finish options, and layout tailored to the project — which means your drawings drive the product, provided the measurements you send are taken from the completed structure rather than from a plan.

Before production, ask for a shop drawing that shows opening size, leaf size, wall build-up, pocket depth, frame detail and ironmongering. Sign that, not the quotation. It is the document both sides will refer back to when the doors arrive.

Send before quotationConfirm before production
Rough opening width and height at three points; finished floor levels; wall build-up and stud position; number of leaves and single or double pocketSigned shop drawing; glazing type and tone; frame and finish codes; hardware set and weight rating; jamb and architrave detail; who prepares the wall and who fixes the frame
Room by room schedule with door tag numbers; site photographs of the openings; country of delivery and access constraintsPacking and pallet schedule matched to the door tags; sequence of delivery against other trades on site; spare parts and replacement hardware availability

5. Who coordinates the door with everything else in the wall?

A pocket door shares its wall with skirting, architrave, switch plates, lighting circuits and sometimes acoustic requirements. If those are ordered from different suppliers, the coordination burden lands on whoever is holding the programme. Ordering doors alongside the joinery, panelling and flooring they will meet means one party owns the details at the junctions.

That is also the practical reason to look beyond the door itself. Where pocket doors sit inside a wider fit-out, Interior Design Services cover space planning, product specification and drawing coordination, so the door schedule is agreed against the same set of drawings as the cabinetry and finishes around it.

6. How do the doors reach site, and who fits them?

Glazed leaves are the items most likely to be damaged in transit, so ask how they are packed, whether corners and edges are protected, and how the consignment is broken down by room tag so that a crew can install one bathroom at a time instead of unloading everything into one storage area. Freight by sea, air or rail, customs paperwork and door-to-door delivery are part of the service scope, and it is worth confirming the packing schedule in writing before the container is loaded.

Then fix the installation question early: whether installers attend site, whether a local crew works to the supplier's fixing details, and what inspection happens after fitting. Sliding hardware should be checked under load, and adjustment should be demonstrated before handover.

7. What happens when something is wrong six months later?

Ask which parts are covered, whether replacement hangers, track and floor guides can be ordered as spares, and how a claim is raised if the project sits in another country. A door that cannot be serviced becomes a wall you have to break open, so spare-part availability is worth more than a long warranty on paper.

A short list before you send the enquiry

  • Door schedule with tag numbers, room, opening size and quantity of leaves
  • Wall build-up and whether pocket framing is in or out of scope
  • Glazing type per room, with a sample reference rather than a name alone
  • Hardware set, weight rating and post-installation adjustment method
  • Shop drawing sign-off before production starts
  • Packing schedule by door tag, delivery sequence and installation responsibility
  • Spare parts list and the process for ordering them

None of these questions are difficult. What matters is that they are answered on paper before production begins, because a glass pocket door is the one product in a project where a measurement error cannot be hidden by a trim piece.

Specifications, finishes and dimensions for Santerson Glass Pocket Doors are confirmed project by project against approved drawings. The Classic Pocket Doors and Santerson Wood Veneer Pocket Doors in the same collection follow the same made-to-measure approach if a fully solid leaf suits the room better.