A quotation for a outdoor swim spa is easy to compare on one line and hard to compare on the whole. Two suppliers can both write "WS-PC02, 3000 x 3000 mm" and mean very different things about pumps, power, filtration and what arrives in the container. If you are a developer, villa owner, hotel operator or procurement agent evaluating a manufacturer's proposal for this model, the useful question is not "what is the price" but "what exactly am I being asked to approve". The checklist below follows the order we recommend working through it.
1. Confirm the specification sheet is written for your configuration
WS-PC02 sits in a configurable swim and hydrotherapy range, so the same model code can be quoted with different equipment inside it. The catalogue entry for this model shows a square footprint of 3000 x 3000 mm with a depth of 1050 mm, one control system, two water pumps, one filter pump, sixty jets in total, one LED light and a total power figure of 7.35 kW. Treat those figures as the catalogue reference point for your comparison, then ask the supplier to restate them for the configuration you are actually buying. Catalogue dimensions for this model are recorded as 3000 x 3000 x 1050 mm; because two suppliers may record depth and overall height differently, confirm which faces those measurements describe before you set out the plinth.
Where a proposal disagrees with the catalogue, that is not automatically an error - it is a question you need answered in writing before award. Ask which items are included as standard, which are options priced separately, and which numbers change if you add or remove one of them.
2. Check what the pumps and jet count actually describe
Pump counts and jet counts are the two figures buyers read fastest and understand least reliably. Two water pumps plus one filter pump tells you there is a separation between massage circulation and filtration circulation, but it does not tell you the flow rate of either pump, the jet layout inside the shell, or how many jets run from which pump. Sixty jets sounds generous in isolation; what matters for a buyer is whether the pump capacity behind them is stated, and whether the supplier has written down the model and rating of each pump rather than only a quantity.
For an outdoor spa that will be used by guests or residents on a schedule, ask three specific questions:
- The rated flow and power of each pump in the proposed configuration, stated as data rather than as "heavy duty" or "high performance".
- How the jets are grouped, and whether zoning is part of the proposal or an add-on.
- Whether a swim training system is included. On this model it is not listed in the catalogue, so if your brief assumes lap swimming against a current, that assumption needs to be settled explicitly instead of inferred.
3. Read the power figure as an electrical design input
A total power of 7.35 kW is the number your electrical contractor and the site supply have to accommodate, so it belongs in the same conversation as cable sizing, protection devices and the distribution board. Check four things on the proposal:
| Item to verify | Why it matters at this stage |
|---|---|
| Total power and how it is calculated | Whether heating, pumps, controls and lighting are all inside the figure or added later on site. |
| Supply voltage, phase and frequency | The manufacturer's factory supply and your site supply are rarely identical; this has to be written for your country. |
| Who supplies and installs the isolator and cabling | An unclear boundary between supplier scope and local electrician scope is where variation orders appear. |
| Earthing and bonding provisions | A water feature next to a habitable area needs the bonding detail agreed before the shell lands on site. |
Local electrical rules are enforced by your own inspector, contractor or engineer. A manufacturer's proposal can state what the unit requires; it cannot tell you what your site is permitted to deliver, so have the local side reviewed by someone accountable for that jurisdiction.
4. Separate standard equipment from optional accessories
The catalogue options attached to this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option has to be confirmed for the configuration you are ordering rather than assumed from a brochure. Two practical checks:
- Ask which options were used to arrive at the quoted price, and what the price becomes if one of them is removed.
- Ask what is not in the box: steps, insulation, cover, chemicals, transport to the final position and connection works are commonly excluded even when a quotation reads as "complete".
A heat pump deserves particular attention. If the spa is intended for year-round use in a cool climate, heating is a running-cost decision as much as an equipment decision, and the proposal should say what heats the water, at what capacity, and how the insulation package supports it.
5. Test the supplier's coordination scope, not just the product
A swim spa is rarely a standalone purchase on a project. It sits alongside paving, decking, screening, outdoor furniture and lighting, and it usually arrives at a different time from the rest of the fit-out. This is where a single supplier covering furniture and building materials changes the procurement picture: instead of coordinating a spa vendor, a joinery workshop, a lighting supplier and an outdoor furniture vendor separately, one party carries the specification, production and delivery schedule for all of them.
Ask the manufacturer to describe that coordination in concrete terms:
- Whether they handle design consultation, space planning and product specification before production starts, as described on their interior design service.
- How production milestones are reported, and who signs off a configuration before manufacture begins.
- What the logistics and door-to-door delivery scope covers: packaging, container loading, export paperwork, freight mode and the point at which responsibility transfers to you.
- What happens after delivery - installation support, inspection with a snag list, spare parts and maintenance guidance, as set out under installation and after-sales support.
6. Compare whole-life cost, not landed price
The number on the proforma invoice is only part of what you will pay. Build a simple comparison sheet for each proposal covering:
- Purchase and delivery: unit price, packaging, freight, duties and local handling to the final position.
- Site works: foundation or plinth, electrical supply, bonding, access for craning or manual placement.
- Operation: pump run time, heating demand in your climate, filtration cycle, and whether ozone or UV sterilisation reduces chemical use.
- Maintenance: filter replacement, consumables, spare parts availability, and the after-sales terms offered in writing.
Insulation and filtration options are the two places where a slightly higher specification usually pays for itself in running cost, so price them as part of the comparison rather than cutting them to reduce the headline figure.
7. Red flags in a swim spa proposal
- Quantities without ratings. "2 water pumps" with no model, power or flow data.
- An assumed swim system. If lap swimming is in your brief and the specification does not mention a swim training unit, it is not included.
- A power figure with no supply details. kW alone cannot be checked against your site electrical capacity.
- "Standard export package" with no packing list. Ask for dimensions, weights and piece count so you can plan access and craneage.
- Options priced only as a bundle. Request unit prices per option so you can compare configurations honestly.
- Warranty and after-sales terms quoted verbally. Get the coverage period, what is excluded, how spare parts are supplied and who responds to a fault in writing.
8. What to send with your enquiry
The fastest way to get a proposal you can compare is to give the manufacturer the constraints up front: site dimensions and access route, intended users and daily usage pattern, target water temperature and season of use, local supply voltage and phase, and whether paving or decking will surround the unit. With those details, a supplier working as a one-stop project furnishing supplier can price the spa together with matching poolside loungers, screening and storage cabinetry in one schedule, which is normally cheaper to manage than four separate orders.
If you are evaluating a proposal for Outdoor Swim Spa WS-PC02, send us the drawings and the quotation. We will restate the configuration line by line against your site conditions - pumps and their ratings, supply voltage and phase, insulation, filtration, delivery scope and after-sales terms - so you can see what is included before production starts, rather than receiving a generic catalogue reply.