A cabinet that houses a washer and a dryer looks like a small item on a fit-out schedule, yet it touches plumbing, power, floor plans, finishes and delivery access all at once. That is why enquiries written in general terms - "one laundry cabinet, please quote" - usually come back with more questions than prices. The suppliers who reply fastest are the ones who receive a room that can be measured, machines that can be identified and a finish that can be matched to the rest of the project.
The list below is what we ask our own project clients to gather before the first conversation about WasherDryer Cabinets. Send it in one message and the quotation that follows will be a real specification, not an estimate built on assumptions.
1. The room itself, measured and drawn
Our Laundry Integration pieces are made to measure, so the drawing matters more than the catalogue page. Before you write, collect:
- Width, height and depth of the alcove or wall run, taken at floor level, mid height and ceiling level - walls are rarely square.
- The position of the existing or planned water inlet, drain and standpipe, measured from both adjacent walls and from the finished floor.
- Socket locations and circuit layout, plus any isolating tap that must stay reachable after installation.
- Floor finish build-up: whether the screed, waterproofing and tile are already laid or still to come, because a difference in floor build-up changes the plinth and door reveal.
- Door type and opening direction, including pocket, sliding and bi-fold tracks that reduce the usable depth at one end.
A simple sketch with these dimensions is enough to start. If you have a set of architectural drawings, send the laundry page and the reflected ceiling or plumbing page together - seeing both avoids the classic clash where a cabinet carcass lands on a soil pipe.
2. The machines you intend to install
Cabinetry around laundry appliances is only as good as the appliance data behind it. Please supply:
- Brand and model of washer and dryer, or their external width, height and depth if the models are not fixed yet.
- Whether the pair will stand side by side or one above the other. Side-by-side units need a vertical divider and separate ventilation gaps; stacked arrangements need a load-bearing shelf or platform.
- Whether the doors of the machines must swing fully open against a cabinet reveal, which affects handle clearance and door thickness.
- Ventilation requirements from the appliance manual - duct route, minimum air gap and whether the dryer is vented or heat-pump.
- Total filled weight for the shelf span if you plan a stacked layout.
If the machines are still open, say so plainly. We will then design to an appliance envelope rather than a specific model and flag which dimensions must be frozen before production begins.
3. How the space has to work day to day
Layout decisions follow household or building use, not aesthetics. Tell us who uses the room and how often:
- A family laundry used several times a week usually needs an ironing or folding surface and hampers within one step of the machines - Pull Out Laundry Hampers built into the base run keep wet items out of sight while keeping the floor clear.
- A guest house, serviced apartment or staff accommodation block runs more cycles per day, so ventilation and access to taps and filters become the priority rather than decorative panelling.
- A very tight bathroom-laundry combination is often better served by Compact Laundry Solutions, where the machine housing, storage and worktop share one wall.
- If detergents, vacuum cleaner and linen all live in the same room, ask for Multi Function Tall Cabinets beside the appliance bay instead of adding shallow shelves above the machines.
4. Materials, finishes and the moisture question
State the finish you want and where it has to match. A cabinet in a bathroom-laundry combination faces humid air and occasional splashing; a utility room off a garage faces dust and cold instead. Those conditions drive board choice, edge treatment and hardware specification, and we need to hear them from you rather than guess.
- The finish family: matte lacquer, high gloss, wood veneer or wood-effect laminate - and the sample or reference number if a match to existing joinery is required.
- Whether the room has mechanical extraction, a window, or neither.
- Hardware preference: handleless profile, integrated pull, soft-close hinges, and whether doors or drawers are wanted in the base run.
- Countertop requirement above the machines, including material and whether the surface continues into a folding area.
5. Quantity, phasing and who installs
One cabinet for a single villa and twenty-four identical units across an apartment block are different enquiries. Please include:
| Item to confirm | Why it changes the answer |
|---|---|
| Quantity per unit type | Repeating layouts let us fix one specification and reuse the same cutting list; one-off sizes each need their own drawing. |
| Site address and access | Lift size, stair width and parking decide whether a carcass arrives assembled or flat-packed for on-site assembly. |
| Who performs installation | Your trades need setting-out dimensions and fixing details; if we support installation, we need the site programme and contact on the ground. |
| Programme dates | Production slots are booked against the site handover date, including the point at which appliance models must be locked. |
| Scope alongside other fit-out items | Vanity units, tall storage and wall panelling from the same batch keep finishes consistent across a storey. |
6. What you want back in writing
Say what your internal approval process needs. A contractor comparing three suppliers wants a dimensioned elevation and an itemised price. An interior designer wants finish references and a visual. A developer's procurement team wants unit rates, packing list volumes and lead times stated against named milestones. We can produce all three; asking for the right one at the start saves a round of redrafting.
A useful enquiry closes with four lines: where the cabinets go, how many, which appliances they house, and by when they must be on site. Everything else we can work out together from your drawings.
Quick pre-send check
- Room dimensions at three heights, with plumbing and power positions marked.
- Appliance models or external dimensions, plus stacking or side-by-side choice.
- Ventilation route and clearance notes from the appliance manual.
- Finish reference and hardware preference.
- Quantity, site address, access constraints and installation responsibility.
- Required delivery or handover date, and what the quotation must contain.
If you are coordinating a whole bathroom or utility fit-out rather than a single cabinet, send the room schedule along with the laundry drawing. Reviewing Laundry & Storage Combo layouts together with the vanities and tall storage on the same floor usually reveals savings in both panel cuts and site labour.