A glass walk-in wardrobe looks finished the day the doors close. The problems show up two years later: a door that no longer glides square, a hinge that has dropped a millimetre and now rubs the frame, a panel that arrived without the replacement glass you were told was "available". None of those faults can be fixed from an email thread if nobody wrote down who is responsible for them. Before you confirm an order, get written answers on the seven points below.
1. What exactly does the warranty cover on glass, frames and hardware?
Glass, frame and hardware usually carry different terms, and buyers often assume one blanket period. Ask for each item in writing:
- The coverage period for the cabinet structure, the aluminium or timber frame, the glass itself, and separately for hinges, runners, handles and sliding gear.
- What counts as a defect versus normal wear. Soft-close dampers and sliding rollers are consumables on heavy glass doors; if they are excluded, say so now.
- Whether the warranty follows the unit or the original buyer. This matters for villa and apartment developments where the wardrobe is installed by one party and used by another.
Get the terms in the order confirmation, not only in a brochure. If the supplier's published page mentions response times or "certified" installers, ask what those words mean in practice for your site, and who signs the installation record.
2. How are spare glass panels and hardware replaced?
Glass is the part most likely to break after handover, and it is the part hardest to replace when nobody recorded the specification.
| Ask for | Why it matters |
|---|---|
| Glass code on the order: type, thickness, tint or finish, edge treatment | "Bronze glass" is not enough to reorder a panel years later. A written glass code lets any future panel match. |
| Hardware brand and model number for hinges, runners and handles | Discontinued hardware forces you to change every door on one wall to replace one broken part. |
| Spare-part supply period and lead time | You want a stated window in which panels and fittings remain orderable, and how long a replacement panel takes to make. |
| Whether spares ship individually or only as a full door set | A single replacement panel shipped loose is far cheaper than a re-manufactured door with frame. |
Ask for one spare of the highest-risk item, usually a glass panel and a set of rollers, to be quoted at order stage. Buying it later as an emergency is always more expensive.
3. Who handles installation, snagging and the handover record?
Glass doors are set out on site. A frame that is a few millimetres out of plumb shows up as a binding door weeks after installation, and the fix belongs to whoever installed it.
- Confirm whether installation is done by the supplier's own team or by your local contractor, and who is liable for alignment faults in either case.
- Agree the snagging list format before handover: door alignment, closure gaps, soft-close function, lock operation, visible glass defects.
- Request a signed installation record with the date, the unit reference and the specification as built. That document is what you attach to any later claim.
For projects delivered overseas, ask how on-site support is arranged. The service scope our site describes covers furniture installation and after-sales support, including inspection and snagging, spare parts and ongoing maintenance — but the practical arrangement differs by country, so confirm installer availability for your site before the order rather than after a fault.
4. What happens if a measurement is wrong?
Made-to-measure wardrobes have no returns, only remakes. Ask the questions that decide cost and delay:
- Who verifies the site dimensions — supplier, installer or your side — and at what point in the programme.
- The correction route if a unit does not fit: remake, on-site adjustment, or partial rebuild, and who pays for freight on each option.
- How long a corrected unit takes to produce, and whether it ships alone or waits for the next consolidated container.
Our Glass Walk in Wardrobes are made to project dimensions, with layout, material and finish specified per space, which means the site survey is the single most important document in the file. Insist on a shop drawing signed by your side before production starts; a correction on paper costs nothing, a correction in a container does not.
5. How are claims raised and how fast must they be answered?
Vague commitments are unenforceable. Ask for the mechanics:
- A named contact for after-sales, not a general inbox, plus the working hours that contact covers.
- The evidence expected in a claim: photographs, unit reference, installation record, purchase order number.
- A stated response time for acknowledgement and a separate one for a proposed remedy. Acknowledgement within two days is worth little if no solution follows for eight weeks.
- The escalation path if the first answer does not resolve the fault.
Write these into the contract as commitments with dates, and keep all claim correspondence in one thread with the order number in the subject line.
6. What maintenance support comes with glass fronts?
Glass shows every fingerprint and every mark from the wrong cleaning product. Ask what the supplier actually recommends:
- Approved cleaning agents and, just as importantly, the ones to avoid on tinted, frosted or coated glass.
- Whether coatings on decorative glass tolerate standard ammonia-based cleaners.
- Recommended adjustment interval for sliding gear and hinges in high-use bedrooms and dressing rooms.
- Whether a maintenance visit or remote guidance is offered after handover.
Ask for the care sheet before shipping, so it can be handed to the facilities team or homeowner with the keys rather than chased later.
7. How do after-sales terms work on multi-unit projects?
Where several identical wardrobes are installed across villas or apartments, one supplier answering for the whole set changes the economics of a fault.
- Ask whether the warranty period starts at handover of each unit or of the whole project.
- Confirm that spare parts are held against the full quantity, not just per unit, so a late-phase unit is not left unsupported.
- Agree a single reference system across units — one label or code per wardrobe — so a fault report identifies the exact item without opening the doors.
Coordinating built-in joinery with the rest of the fit-out is easier when one supplier holds the drawings for everything. Our turnkey villa furnishing scope covers design, production, delivery and installation under one point of contact, which keeps wardrobe claims in the same file as cabinetry, flooring and lighting.
Before you sign: five documents to request
Warranty terms per component; glass and hardware specification codes with a spare-part supply window; shop drawings signed by your side; the installation and snagging record format; and a named after-sales contact with response commitments. If a supplier can produce all five, the after-sales conversation is already settled.
Frequently asked questions
Should I buy spare glass panels with the original order?
Where budget allows, yes — one spare panel for each distinct glass type, ordered against the same production run, guarantees a colour and finish match that a later reorder cannot.
Does importing a wardrobe from overseas weaken my after-sales position?
Not if the terms are written. Freight and customs paperwork need clear responsibility, but the parts supply period, response commitments and installation liability can all be stated in the order confirmation regardless of where the unit is made.
What is the most commonly missed question?
Hardware model numbers. Glass breaks visibly and gets replaced; a discontinued hinge quietly ends the service life of a whole door line.
Send your drawings, wardrobe elevations and site location to SANTERSON, and we will confirm the specification, spare-part supply terms and installation arrangement for your project in writing before production begins.