Wardrobes are one of the most quietly demanding items on a hospitality FF&E schedule. They appear in every guest room, they have to survive daily use by strangers, and they arrive late enough in the programme that any unresolved detail becomes a site problem. This guide walks through how we plan the procurement of mahogany solid wood wardrobes for hotel and serviced-apartment projects, from the first dimension survey to handover.

Why a hospitality project specifies mahogany at all

Warm timber tones still do a lot of work in guest rooms. A mahogany-toned wardrobe reads as substantial and settled, and it pairs easily with the darker joinery, brass ironmongery and stone surfaces that recur across hotel interiors. In our built-in furniture range, the Mahogany Solid Wood Wardrobes sit inside the wider solid wood wardrobe collection alongside cherry, oak, walnut and rustic finishes, which matters when a designer wants one construction detail and several tones across room types.

The commercial argument for solid wood is not durability alone. Guest-facing joinery gets touched, knocked and cleaned constantly, and a solid timber carcass with a replaceable door or panel ages more gracefully than a board-and-edge product whose damage tends to spread. That said, the specification has to be honest about what it covers: our product pages describe made-to-measure sizing, selectable material and finish options, and a layout tailored to each project, so the wardrobe is quoted as a bespoke item rather than a catalogue unit.

Step 1: lock the room types before you price anything

The single most expensive mistake in wardrobe procurement is pricing a prototype and assuming it transfers. Before any request for quotation goes out, group the rooms into a small number of archetypes and confirm for each one:

  • the clear internal dimension of the wardrobe recess, including skirting, cornice and any structural projection;
  • whether the unit is recessed, flush to the wall face or full height to the soffit;
  • door operation — hinged, sliding or open — against the circulation width in front of it;
  • the internal kit: hanging rail heights, shelf counts, drawer bank, luggage bay, safe shelf, lighting provision.

Two room types that share a drawing label but differ by a few centimetres of recess depth will produce two different carcass details. Flag this in the schedule rather than leaving it for the shop drawings to discover.

Step 2: agree the finish and construction record

Mahogany is a family name in trade use, not one species, and grain variation between batches is normal. What you need on paper, signed by the designer before production starts, is:

Item to fixWhy it needs fixing early
Timber cut and grain direction on doors and revealsSample boards do not show how the grain runs across a run of identical rooms
Finish build — open pore, satin or higher sheenSheen changes how fingerprints, cleaning agents and corridor light read on the door face
Which parts are solid timber and which are engineered substratesMovement behaviour differs; mixed construction is normal but must be declared
Ironmongery interface — hinge bore, handle fixing, sliding track loadingHardware chosen by the client has to be bored for, not retrofitted on site
A reference unit signed off and retainedThe benchmark against which every later delivery is inspected

We produce shop drawings from the survey for approval before cutting. On a multi-tower or phased hotel, that drawing set also becomes the tool for keeping phase two consistent with phase one.

Step 3: build the quantity schedule around rooms, not pieces

Wardrobe orders go wrong on arithmetic. Structure the bill of quantities by room number and status:

  • a numbered room list with the wardrobe type code against each room;
  • spares — a defined allowance of spare doors, shelves and drawer fronts held back for future replacement;
  • prototype units, released first and inspected after installation, not just in the factory;
  • a frozen change window: any layout revision after drawing approval is re-quoted, dated and signed.

Because our wardrobes are made to measure, a late change is not a swap from stock; it restarts fabrication for that line item. Writing that consequence into the contract at the start keeps later revisions orderly.

Step 4: plan the shipping and storage sequence

Solid timber joinery is a poor last-minute arrival. When wardrobes ship from China alongside flooring, panelling, vanities and lighting on the same project, sequencing decides whether they land into a dry store or into a corridor. Practical points to settle with the supplier and the main contractor:

  • container loading order matched to the installation sequence, so first-off containers are first-installed;
  • packaging specified for ocean transit — moisture barrier, edge protection, clearly marked room-number labels;
  • a covered, ventilated store on site with timber acclimatising before installation, not being carried straight from a cold container into a heated room;
  • delivery slots aligned to when the recess is actually finished, plastered and dry.

Our logistics and door-to-door delivery service covers freight booking, export paperwork and container loading plans; the on-site storage condition remains a main-contractor responsibility, and it is worth naming in the programme.

Step 5: installation, inspection and the snag list

Installation of made-to-measure wardrobes is where specification quality becomes visible. The checks we ask project teams to run with us:

  • levels and reveals checked room by room, not sampled — floor levels in a new build vary more than drawings suggest;
  • door alignment and closure on every unit, with adjustment after the unit is loaded, not before;
  • finish protection left in place until painting and carpet trades have finished in that room;
  • a snag sheet per floor, photographed, closed out before handover.

Our installation and after-sales support service covers on-site fitting, inspection with the client's team and replacement of damaged components. Warranty terms, response times and the line between site damage and a manufacturing defect should be confirmed in writing for your project rather than assumed from marketing pages.

Before you sign a wardrobe order, put the open questions in writing: certification scope, fire performance of the specified finish, the timber species declaration, transit time and warranty period. These are confirmed project by project in the quotation rather than assumed from a brochure.

How this fits a one-stop procurement package

Wardrobes rarely stand alone. Across the Australian villa and residential projects published on this site — Willoughby, Perth, North Turramurra, Melbourne and Sydney — joinery of this kind travels with arched niche and full house custom wall cabinet work, vanities, media walls, doors and panelling. Consolidating those items with a single hospitality furniture supplier reduces the number of dimension surveys, drawing approvals and container programmes to manage, which is where most of the real saving sits.

Planning a guest-room joinery package? Send us the room schedule, the recess dimensions and the design intent drawings, and we will return shop drawings, a construction record and an itemised quotation for mahogany solid wood wardrobes — contact SANTERSON to start the survey.