Why the Specification Matters More Than the Photo

A wall mounted cabinet is one of the smallest items on a project schedule and one of the most frequent sources of rework. The sample looks perfect, the render looks perfect, and then the unit arrives to find that nobody confirmed where the waste pipe runs, who carries the load, or how the side panel meets the tiled return. Because our wall mounted cabinets are made to measure rather than taken from a fixed size range, the written specification is what actually defines the product. This guide sets out the fields we ask buyers, contractors and designers to fill in before a quotation is issued.

Start With the Wall, Not the Cabinet

Wall hung storage behaves completely differently from a floor standing unit: the entire load, including contents, transfers into the substrate. Two details decide whether the fixing design is straightforward or needs engineering input.

  • Substrate and build-up. Solid masonry, framed stud work with noggins, and lightweight block all take fixings differently. Send the wall construction, not just a length, and state the thickness of the finished surface, whether that is tile, plasterboard, stone or a panel system.
  • Finished floor and finished wall levels. Made-to-measure work is dimensioned from finished faces. Give the level from finished floor to the underside of the cabinet, and confirm which face is the reference plane at each end of the run.

The Seven Fields Every Specification Should Contain

FieldWhat to stateWhy it causes problems when left blank
Overall sizeWidth, height and depth, plus which dimension is nominal and which is the clear openingCabinet depth is often quoted with and without the door, so two suppliers quote different products against the same drawing
Mounting levelsUnderside level from finished floor, and clearance above for mirrors, lighting or shelvesA unit fixed to a drawing dimension can clash with a basin tap or a mirror light already on site
ServicesPositions of water inlets, waste outlets, sockets and any concealed pipework relative to the cabinet outlineCut-outs made in the factory cannot be moved; cut-outs made on site expose the core material
LayoutDoor swing, drawer stack, shelf heights, internal dividers and any drawer unit configurationReversed hand is usually discovered at installation, when the handle side faces a return wall
Material and finishSubstrate, surface material, colour reference and sheen level for each visible face, including the cabinet interior"Grey, matte" is not a procurable item; a named finish code removes the guesswork
Edge and profileDoor edge profile, handle style or handleless reveal, and how exposed edges are finishedAbsent detail produces a plain edge where a chamfered or bullnosed one was expected
Fixing methodConcealed rail, bracket or recessed frame, together with the substrate it is designed forGeneric fixings supplied with a cabinet are rarely matched to the actual wall build-up on site

Match the Specification to the Room Type

The same cabinet type is specified very differently in a guest bathroom, a family main bathroom and a shared laundry. In wet rooms and bathrooms with a shower but no enclosure, moisture reaches the carcass through the air rather than through splashes, so the sealing detail at the wall interface matters more than the surface material. Where a unit sits beside a bath or basin, ask for the splash zone to be drawn on the elevation and confirm how the side panel is sealed to the tiled return.

In utility and laundry settings, the load profile changes again: detergents, linen and bulk storage push a wall hung unit far beyond what it was drawn for. Where heavy contents are expected, specify the load in the enquiry and let us design the internal structure and fixing rail around it, or move that part of the storage to a freestanding cabinet and keep the wall hung element for lighter items.

Coordinate With the Rest of the Fit-Out

Wall mounted cabinets rarely stand alone. They sit in a run that includes vanities, mirrors, lighting, tiling setting-out lines and sometimes a wall hung basin or WC frame. A single combined elevation showing all of these elements on one dimensioned drawing prevents the most common coordination failure: a cabinet ordered to a furniture drawing while the tiles are set out from an architectural one, so the finished unit lands off-centre against the tile joints.

Where the design calls for a floating look across the whole room, keep the mounting detail consistent between elements. A floating vanity and a wall hung cabinet that use different recess depths read as two unrelated products even when they share the same door and finish.

What to Send With Your Enquiry

  • A dimensioned elevation of each wall, with finished levels marked and services located
  • The selected finish reference for the exterior faces and a note on whether the interior is to match or contrast
  • Door hand and internal layout for every unit, drawn rather than described in text
  • The wall build-up, including the thickness of the finished surface
  • Quantity per bathroom, so identical rooms are produced as one batch and stay consistent across a project
  • Any matching elements ordered at the same time, such as wall mounted shelves or tall storage in the same door

With those items in place, we can confirm sizing, layout and finish, then return drawings for sign-off before production begins. Where the information is incomplete, the quotation will carry assumptions, and those assumptions are what change into variations later.

A note on dimensions: because these cabinets are made to measure, every figure in a specification should be taken from site survey or from issued construction drawings, not scaled from a plan. Confirm the final numbers once wall finishes are complete.

One Supplier for the Whole Storage Package

Specifying cabinets, vanities, tall storage and open shelving through one manufacturer keeps door profiles, finishes and mounting hardware consistent across a project, and puts a single production schedule behind the whole bathroom package. SANTERSON has been producing furniture and building materials for villa, hotel and residential projects since 2008, with custom and OEM service, door-to-door delivery and installation support handled in-house.

Send us your drawings

Share elevations, finish references and room quantities and our team will review the specification and reply with a quotation and production drawings for approval. Contact SANTERSON to start.