A 7-metre swim spa is not a small purchase to place across an ocean. The shell arrives on one container, the plant room has to be reachable, and the electrical supply must match what the unit actually draws. This guide walks through how buyers, builders and project procurements specify Outdoor Swim Spa WS-PC07A-T with an overseas manufacturer, what to confirm before the order is placed, and which documents should be in writing.
What the WS-PC07A-T configuration includes
The model sits in our configurable outdoor swim and hydrotherapy range. The published catalogue entry lists a shell of 7000 × 3000 × 1470 mm, which puts it in the long-format category: enough length for lap swimming against a current, with room at the jetted end for seated therapy work. The specification block on the product page records 56 jets, four LED lights, one water pump, one filter pump, one control system and one swim training system, with total power of 11.55 kW. Water jets, LED lighting, ozone sanitisation and the swim training system are all shown as features of this configuration.
Treat those figures as a starting point rather than a final order sheet. Every unit is built to a selected configuration, so what is included, what is optional and what your site must supply should be confirmed in writing before production begins. If the 7000 mm length or the power load does not suit your plot, other layouts in the Swimming Pools and Swim Spas range cover shorter and narrower shells, which is often the easier route than re-engineering a long unit for a tight terrace.
| Item on the catalogue page | Recorded value | What to confirm with the factory |
|---|---|---|
| Catalogue dimensions | 7000 × 3000 × 1470 mm | Overall external size versus internal water length, and clearance needed for access hatches |
| Total power | 11.55 kW | Supply voltage, phase, breaker rating and cable size at your site; whether a heat pump is included in that load |
| Jet total | 56 pcs | Jet layout and seat positions for the configuration you order |
| Water pump / filter pump | 1 pc each | Pump brand, flow rate and filtration cycle time |
| Control system | 1 set | Touch-panel language, thermostat range, remote or app control if required |
| Swim training system | 1 set | Current type and adjustable speed range for the intended use |
| LED lights | 4 | Colour options and whether lighting is dimmable from the panel |
Step 1: Fix the site conditions before you ask for a price
Most delays in cross-border swim spa orders come from site work, not production. Send your manufacturer the following and the quotation becomes comparable between suppliers:
- A dimensioned plan of the terrace, deck or pad, including the finished level and how the unit will be lifted into place.
- Confirmation that the supporting structure carries a full shell when filled. A 7000 mm unit on an upper-level deck needs an engineer's sign-off before anyone talks about finishes.
- The available electrical supply: voltage, phase, dedicated circuit capacity and where the isolator will sit.
- Drain, overflow and drainage route for backwash and draining.
- Local authority or body-corporate requirements in your area. These rules vary by country and council, so they are your responsibility to check; we supply the product documentation you need for that process.
Step 2: Decide what is included and what is optional
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the practical question is which of these you want on your unit and how each one changes the electrical load.
Three choices matter most for an outdoor unit used outside summer:
- Heat pump versus the standard heater. A heat pump changes both the running profile and the equipment space needed beside the shell.
- Insulation. Relevant wherever night temperatures drop; ask for the insulation build-up in the shell and base, not just a label.
- Filtration type. The catalogue lists sand filtration as an option alongside the standard filter pump. Decide this before production, because it affects plant access.
Ask for two documents at this stage: an itemised configuration sheet listing every included component, and a wiring/load schedule showing the draw of each item on your supply. If a supplier cannot produce both, their quotation is not comparable with anyone else's.
Step 3: Verify the manufacturer, not just the model
SANTERSON has operated since 2008 as a China-based furniture and building materials manufacturer and one-stop project supplier. That history matters here because a swim spa on a villa or resort project rarely travels alone: pergolas, loungers, daybeds, paving, wall cladding, lighting and bathroom fit-out usually move on the same programme. Coordinating those items through one Turnkey Interior Project Solutions team reduces the number of separate suppliers chasing your site schedule.
Questions worth putting to any overseas factory, ours included:
- Which factory builds the shell, and can you visit it or join a video inspection during production?
- What inspection points are built in before packing, and what photographic record do you send?
- How are the acrylic interior, cabinet structure and framing specified for this model line?
- Which spare parts ship with the unit, and how are replacements supplied later?
Step 4: Custom work and multi-unit orders
Where a project needs a different cabinet finish or cladding matched to the surrounding decking, or a run of identical units for a resort or apartment development, our Custom & OEM Service covers bespoke finishes and materials, OEM production and private labelling. Send the drawings early: finish choices and branding are cheap to change at quotation stage and expensive to change once production starts.
Step 5: Freight, customs and handover
Our Furniture Logistics and Door-to-door Delivery service arranges sea, air and rail freight, packaging and container loading, customs paperwork and shipment tracking to the delivery address. For a swim spa, ask specifically how the shell is crated, what lifting gear is assumed at destination, and who books the crane or forklift. Import duty, local electrical certification and any permit costs usually sit with the buyer; confirm Incoterms on your proforma invoice so nobody is surprised later.
On arrival, Furniture Installation and After-sales Support covers installation guidance, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Agree the commissioning checklist before the unit is filled: fill and test the shell, run each circuit under load, verify jet performance and the swim current, then photograph any transit damage on the packaging before signing off.
Specifications quoted above are transcribed from the published catalogue entry for WS-PC07A-T. Included equipment, options and electrical requirements vary by configuration and must be confirmed for your order. Site preparation, permits, local electrical work and certification are arranged by the buyer or their local contractor.
A practical checklist before you pay a deposit
- Dimensioned site plan with access route and lifting method agreed.
- Configuration sheet listing every component, with options priced separately.
- Load schedule matched to your supply voltage and phase.
- Crate dimensions and container type confirmed against your delivery address.
- Incoterms, lead time and payment milestones written on the proforma.
- Inspection points agreed, with photos at each stage.
- Commissioning checklist and spare-parts list attached to the order.
Send your site plan and required configuration to our project team for a specification review and an itemised quotation for Outdoor Swim Spa WS-PC07A-T. Contact: PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com.