Glass hinged wardrobes look finished the moment the doors close, but they are only as good as the way they arrive and the way they are hung. A made-to-measure glass-fronted wardrobe travels through several hands — factory packing, ocean or land freight, site storage, and finally a fitting team working around flooring, skirting and paint that other trades have already touched. Most problems reported on site are not defects in the joinery; they are gaps in coordination. This guide walks through the delivery and installation sequence for glass hinged wardrobes, so that the ordering office, the site team and the supplier are all working from the same plan.
Why glass hinged wardrobes need more planning than a plain carcass
SANTERSON wardrobe ranges, including the Glass Hinged Wardrobes collection in our hinged door series, are supplied made-to-measure: sizing, layout, material and finish are specified per project rather than picked from a stock depth. That is an advantage on paper and an obligation on site. Once the panels are cut to a room's dimensions, there is no returning a carcass that is 40 mm too wide, and a glass leaf that was stored upright against an unbraced wall may not survive to the fitting day.
Three characteristics of this product drive the whole logistics plan:
- Dimensional accuracy matters more than tolerance. Hinged leaves need a consistent gap line. If the floor is not level along the run, or the wall moves out of plumb, hinges can be adjusted only so far before the doors bind.
- Glass adds weight and fragility. Leaf weight sets the hinge count and affects who can lift into place, while edges and corners are the parts most often chipped in handling.
- The wardrobe is a finish item, not a structure. It must be installed after wet trades, flooring and decorating have settled, which puts it late in a programme that usually compresses at the end.
Step 1: Lock the site dimensions before anything is cut
Everything downstream depends on one survey. Take measurements from the actual room, not from architectural drawings alone, and record them against a fixed datum line so that a second person can repeat the exercise.
- Measure the run at several points along its length — height, width and depth — and note the variation rather than averaging it away.
- Check floor level along the full wardrobe line. A slope of a few millimetres over two metres is invisible to the eye but visible in a glass door gap.
- Mark the position of skirting, architraves, switches, sockets, radiators and any ceiling downlights that will sit above the carcass.
- Confirm what sits behind the wall. Studs, noggings, service runs and insulation determine how the unit is fixed and where blocking may be needed before plasterboard is closed.
- Note access routes: doorway widths, lift dimensions, stair turns and corridor corners between the delivery point and the room.
Send the survey to your supplier with the room photographs. Where a wall is out of plumb or a floor is uneven, agree now whether the site will correct it or the unit will be built with a scribe or packer line. Deciding this after production starts costs time on both sides.
Step 2: Confirm the specification while there is still room to change it
Glass-fronted hinged wardrobes are specified in choices, and each choice changes how the unit is packed and handled. Before the order is released, confirm:
- The glass type and finish for each leaf — clear, frosted, bronze or smoked glass, with or without an aluminium frame, as listed across our frosted, bronze and smoked glass wardrobe collections.
- Hinge type, side and opening direction for every leaf, checked against the bed, door and light switch in the room rather than against a reflected drawing.
- Internal layout — hanging rails, drawers, shelving and any integrated lighting — because drawer runners and inserts are usually packed separately from carcasses.
- Carcass finish and edge banding, and whether adjacent units in the same bedroom or dressing room must match exactly across a batch.
For projects ordering more than one wardrobe type, keep a single schedule with a unique reference per unit. That reference should appear on the drawings, the packing list and the carton labels; it is the only reliable way to sort components on a busy site.
Step 3: Plan packing, freight and container loading around the glass
Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, export paperwork, packaging and container loading, shipment tracking and delivery to the site. For made-to-measure joinery with glass leaves, the useful conversations with your logistics coordinator happen before the containers are booked:
- Packaging method. Carcass panels and glass leaves travel differently. Glass needs edge protection, upright racking or glazing bars, and a marking system that says clearly which end is up and which side is the finished face.
- Loading sequence. The wardrobe delivered first should be the one needed first on site. If the whole fit-out arrives in one container, ask for loading order to follow the installation sequence, room by room.
- Documentation. Commercial invoices, packing lists and certificates of origin should carry the same unit references as your schedule, so customs clearance does not require anyone to open cartons to identify contents.
- Insurance and inspection points. Agree in advance how glass damage is recorded — photographs at the container door, notes on the delivery receipt — because a claim filed after installation has begun is very hard to substantiate.
Step 4: Set the delivery window against the site programme
A glass hinged wardrobe should arrive when the room is ready to receive it, not when the container happens to land. Work backwards from your installation date:
| Stage | What must already be true |
|---|---|
| Unit arrives on site | A dry, secure storage area exists; the route from the delivery vehicle to that area is clear and wide enough for the longest panel. |
| Storage before fitting | Panels remain in cartons, stored upright and braced, off the floor, away from traffic. Glass crates are not stacked with heavy joinery on top. |
| Room ready for fitting | Flooring laid and protected, plaster and paint cured, skirting resolved, services tested, room cleaned and dust-free. |
| Installation team on site | Fixing details confirmed, tools and lifting help available for the weight of glass leaves, other trades finished in that room. |
If a project has several bedrooms or a dressing room plus a hallway run, split deliveries by zone. Fitting one complete run and signing it off is easier than storing eight wardrobes in a corridor for three weeks while the decoration catches up.
Step 5: Receive and inspect before anyone unpacks everything
On arrival, carry out a documented check against the packing list while the delivery is still at the door:
- Count cartons by unit reference, not by total number.
- Inspect external packaging for impact damage, punctures and water staining; photograph anything unusual before unpacking.
- Open a representative sample of glass crates and check edges and corners, which is where transit damage appears first.
- Verify that hardware kits, hinges, handles and drawer units are labelled to the correct references.
- Record any discrepancy in writing on the delivery paperwork the same day.
Do not let site crews unpack all cartons at once. A wardrobe stays protected in its packaging until the moment it is needed, and unlabelled loose panels are the most common cause of a fitting team standing idle.
Step 6: Sequence the installation itself
The order of operations for hinged glass wardrobes follows the logic of the carcass:
- Level and fix the base or plinth along the run, checking level across the full width rather than at one point.
- Erect carcasses from one end, joining them as you go, and check the vertical line of each unit before fixing it to the wall and to its neighbour.
- Fit shelves, rails and drawer units that sit behind the doors, so nothing has to be adjusted with a glass leaf in the way.
- Hang the hinged leaves last, one at a time, then set the gap line by adjusting hinges — parallel edges first, then depth.
- Fit handles, mirrors and any integrated lighting, then remove protective film after the room has been cleaned.
Two details are worth insisting on. First, glass leaves should be hung after the carcass line is final; hanging early means every later adjustment loads the hinge. Second, door gaps should be checked with the wardrobe fully loaded, because an empty unit that hangs perfectly can still sag once rails are full.
Step 7: Handover, snagging and after-sales
Our installation and after-sales support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. On handover day, walk the installation with the site foreman and check the practical items an owner will notice first:
- Every leaf opens and closes freely along its full arc, with no catch at the halfway point.
- Gaps between adjacent doors are consistent top to bottom.
- Glass faces are clean, film-free and free of edge chips; check under raking light, not overhead light.
- Drawers run without rubbing carcass sides; doors do not touch handles on the opposite leaf.
- Any integrated lighting, mirror panels and internal accessories function as specified.
Close out with a signed snag list, photographs of the finished installation, and the unit references for anything outstanding. Keeping that record — together with the original specification sheet and packing list — makes a later spare part request straightforward: one reference identifies the exact leaf, hinge or panel needed.
A short checklist to send to your supplier
- Survey drawings with measured dimensions, floor levels and fixing details.
- Confirmed glass type, frame finish, hinge side and opening direction per leaf.
- Internal layout and hardware schedule per unit reference.
- Delivery address, storage conditions and access route for the longest panel.
- Installation window agreed against the site programme, zone by zone.
- Damage-reporting procedure agreed before containers are booked.
Coordinated this way, a glass hinged wardrobe is one of the least troublesome items in a fit-out: it arrives labelled, stands in a ready room for a few days, and goes up in a day. Coordinated badly, it becomes the last item on site and the reason a handover slips. If you would like delivery and installation planning reviewed for an upcoming bedroom or dressing room package, our team at SANTERSON can work through the schedule with you from survey to sign-off.