A wall-hung bidet rarely fails on its own. It fails because the trap, the carrier, the basin height and the tile line were decided by four different suppliers who never spoke to each other. This guide walks through how we specify and coordinate the Wall Hung Bidet 1004F alongside the toilets, basins, vanities, showers and finishes around it, so the bathroom suite arrives as one set instead of five separate deliveries with five separate problems.
What the 1004F actually is
The 1004F is a wall-mounted vitreous ceramic bidet, fixed to the wall through a back panel. Its outline is a softened rectangle — close to square, with the corners eased off so it does not read as a hard box against a run of joinery. The glaze is smooth and glossy, which is what keeps staining and mineral deposits from bonding during daily use in a hotel or family bathroom.
Because it is wall hung, the floor under it stays clear. That single decision matters more on a project than it does on a showroom sample: housekeeping can mop straight through, there is no silicone joint at the floor to yellow or lift, and the same floating look carries across the WC and the basin next to it.
The published page lists the 1004F at 545 x 360 x 410 mm. Treat that as the catalogue figure. Before any wall-hung item goes into a shop drawing, we confirm the dimension, trap position and rough-in against the technical sheet for the exact batch being produced, because these values are what the plumber has to hit.
Step 1: Decide the suite before you decide the bidet
Buyers usually start with the toilet. In a fit-out that involves more than one bathroom, start one level up and choose the bathroom sanitary fixtures as a family: WC, bidet, basin or basins, in one ceramic body, one glaze batch, one design language. That single move removes most of the coordination work later.
Two practical reasons:
- Glaze and shade. Ceramic is fired in batches. Mixing a bidet from one line with a WC from another is where you get a white that sits next to an off-white under the same vanity light.
- Mounting logic. Wall-hung pieces share a carrier and a waste route. If the WC and bidet are specified together, the frame supplier gets one set of heights to work to rather than two.
For projects where a bidet is not wanted in every bathroom, we split the suite deliberately: master bathrooms and guest WCs get the bidet, staff and service bathrooms do not. The ceramic stays identical across both groups so the building reads consistently.
Step 2: Fix the drainage and framing decisions early
Wall-hung ceramics are set out by the wall, not by the floor tile. Two questions have to be answered before partitions are drawn:
- What is behind the ceramic? A concealed-cistern carrier carries the WC; the bidet needs its own support and supply point at a matching height. Frame depth, service access and the finished wall build-up all change with that answer.
- Where does the waste leave? The paired Wall Hung Toilet 1038W is a compact wall-hung WC built around an 180 mm P-trap wall drainage, which suits small bathrooms and shallow wall zones. Where the bidet sits next to it, the waste runs have to be resolved as one detail, not two.
Where a project already has a floor waste or cannot take a deep framed wall, the freestanding alternative is the Floor Standing Bidet 1038F, which fixes to the wall with a back support and pairs with the matching 1038 series toilet. Choosing between the two is a drainage and framing decision first, an aesthetic one second.
Step 3: Set basin and vanity heights around the suite
A bidet sits low. Its neighbours do not. The visual rhythm of a bathroom wall comes from aligning what you can see — basin rim, mirror bottom, vanity top — while the ceramics below sit at their own working heights.
| Element | What we coordinate | Who has to confirm it |
|---|---|---|
| Wall-hung basin | Rim height and the wall supply position, so the tap and waste land in the tile line rather than across a joint | Ceramic supplier plus plumber |
| Vanity | A floating vanity keeps the same clear-floor language as the wall-hung ceramics; its carcass depth decides whether the basin overhangs or sits flush | Cabinetry shop plus tiler |
| Mirror cabinet | An LED mirror cabinet needs the cable and isolator set out before the wall closes, and its height is read off the basin rim | Electrician plus cabinetry shop |
| Vanity lighting | Vanity lighting position is fixed by the mirror, not the other way round | Electrician |
| Shower set | A wall-mounted digital display rain shower system with a slide bar needs a solid backing and a hot and cold position that matches the tile setting-out drawing | Plumber plus tiler |
Step 4: Carry the same finish language into the surfaces
The ceramics are only the part people photograph. In a villa or hospitality fit-out the bathroom is judged as one surface: floor, wall, joinery, glass.
- Flooring outside the wet zone. Engineered oak in a corridor or master suite should be ordered with the bathroom threshold detail already drawn, including the fall into the shower and where the tile field ends.
- Wall panel systems. Where a head wall, WC cistern wall or corridor wall is panelled rather than tiled, the panel build-up has to agree with the framed wall that carries the ceramics — otherwise the finished wall face moves and every rough-in dimension shifts with it.
- Glass partitions. A shower screen or glass partition must be measured after the tile and the ceramics are set, not from the drawing alone.
Step 5: Order it as one package
This is where a single supplier earns their place. When ceramics, vanities, mirror cabinets, lighting and partitions come from one interior fixtures programme, three things get easier on site:
- One set-out drawing governs the whole bathroom, so heights and tile joints are resolved once.
- One production window means the glaze batch, the vanity lacquer and the metal finishes are made in the same period.
- One shipment and one packing list, with the fragile ceramics crated against the joinery rather than arriving separately three weeks apart.
Where a project needs non-standard sizes — a vanity pulled in to clear a door swing, a basin set lower for an accessible bathroom — that is custom and OEM work, and it should be raised at specification stage. A made-to-measure change costs a drawing revision at the start and a site variation at the end.
A coordination checklist before you place the order
- Ceramic suite confirmed as one family: WC, bidet, basin, same glaze reference.
- Wall-hung or floor-standing decided per bathroom, based on drainage and wall build-up.
- Trap type, waste route and rough-in confirmed against the technical sheet for the batch being made.
- Framed wall depth and finished wall face agreed with the framer and the tiler together.
- Vanity, mirror cabinet and lighting set out from the basin rim, with electrical points shown on the same drawing.
- Shower valve, backing and tile setting-out resolved before the wall closes.
- Flooring threshold and shower fall drawn where the tile field meets the finished floor.
- Spare ceramics held for handover — typically a small percentage of each fixture type, agreed with the client.
If you are specifying wall-hung bathroom ceramics for a villa, apartment or hospitality project and want the suite, joinery and finishes coordinated as one package, send us the bathroom layouts and the fixture schedule. We will return a set-out drawing, a specification and a quotation. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use the contact page.