Integrated appliance tall cabinets look simple on a drawing until the appliance schedule arrives. This guide walks through how we count them, group them and coordinate the surrounding products at Santerson, so the joinery, the appliances and the site services all arrive aligned.

Why Quantity Planning Starts With the Appliance Schedule

Santerson Integrated Appliance Tall Cabinets are made-to-measure units in our Tall Cabinets collection. Finish, internal layout and overall dimensions are specified per project, and the cabinet is built around the appliance it houses — a built-in oven, a microwave drawer, a wine cooler, a washer or a dryer. That single dependency sets the order of work: the appliance decision comes first, the carcass follows.

In our experience on villa and hospitality fit-outs, most rework on tall cabinetry traces back to three things: an appliance model that changed after production started, a ventilation gap nobody drew, and a quantity list that mixed "one unit" items with "one wall" items. Sorting those out at the enquiry stage costs nothing; sorting them out on site costs a return shipment.

Step 1 — Build a Unit List Room by Room

Do not count tall cabinets across the whole project in one pass. Go room by room and give every unit a code you can trace on the drawings, for example K-01 for the first kitchen unit, LR-02 for the second living-room unit. For each code record:

  • The room and wall position, with the finished floor level noted where levels change.
  • The function: oven housing, microwave housing, laundry stack, pantry with appliance, or utility store.
  • The appliance to be installed, with make and model if already selected.
  • Door hand and whether the unit faces a walkway, a corner or another cabinet run.
  • Finish and handle style, matched to the adjacent cabinetry run.

A unit list like this becomes the backbone of everything after it: the quotation, the production sheet, the packing list and the site installation sequence all reference the same codes. When a client later says "delete two units from the second floor", you know exactly which codes to remove and which adjacent runs are affected.

Step 2 — Split the Quantity into Three Groups

Once every unit is coded, group them. This is what prevents a shipment that arrives complete on paper but incomplete in practice.

GroupWhat it coversWhat you must confirm before ordering
Appliance-integrated unitsCabinets that house a built-in appliance, including oven towers and laundry stacksAppliance make, model and cut-out dimensions; ventilation route; power position and circuit rating
Companion tall unitsStorage-only units that sit beside them and complete the run: Santerson Utility Tall Cabinets, Santerson Open Shelf Tall Cabinets, Santerson Corner Tall CabinetsSame finish and door profile as the appliance units; consistent reveal and plinth detail
Glass-front and display unitsUnits used to break up a long run or frame a niche: Santerson Glass Front Tall CabinetsGlass type, internal shelving pitch, lighting feed if the unit is illuminated

The second group is where projects most often go short. A quantity sheet may show three appliance towers and forget that the design intent was a continuous run of five tall units to the ceiling. Order the storage units in the same batch, on the same finish code, so the doors come from one production run.

Step 3 — Lock the Appliance Interface Before Production

For each integrated unit we ask the project team to confirm four items in writing. These are not optional details; they define the carcass:

  • Appliance dimensions. The overall size and, more importantly, the recess or cut-out size from the manufacturer's installation sheet. Two models of the same nominal width often need different clearances.
  • Ventilation. Where intake air enters, where exhaust leaves, and whether a grille or a vented plinth is required in the door or toe kick.
  • Electrical provision. Position of the outlet, circuit rating and whether the appliance needs its own dedicated line. The outlet should sit in an adjacent carcass, not behind the appliance.
  • Access and loading. How the appliance reaches the room on site, and whether the cabinet can be built in sections if the access route is tight.

Where a laundry or utility area carries several appliances, we plan it as one integrated block rather than separate purchases. Our Laundry Integration range covers that case: Multi Function Tall Cabinets, WasherDryer Cabinets and Stacked Laundry Units are specified with the same made-to-measure approach, so a stack, its folding shelf and its door cupboard share one construction detail.

Step 4 — Coordinate the Surrounding Products

A tall cabinet never stands alone. The products that touch it need to be on the same drawing set and, ideally, on the same purchase order:

  • The cabinetry run it belongs to. Door profile, handle style, panel thickness and colour must match across base units, wall units and tall units. Order them together so they are lacquered or laminated in one batch.
  • Worktops and splashbacks. Where a tall unit terminates at a worktop, the reveal and the end panel need to be dimensioned with the stone, not after it.
  • Wall and floor finishes. Tall units usually run to the ceiling. Set out the skirting, the ceiling line and any shadow gap before the cabinet dimensions are frozen.
  • Doors and openings. Check that a hinged or sliding door does not clash with an open cabinet door at full swing.

If the project also needs interior fixtures in the same zone — vanities, mirror cabinets or shower hardware for an adjacent bathroom — grouping them into one procurement package shortens the site programme, because the trades that install them are on site once rather than twice.

Step 5 — Turn the List Into a Phased Delivery Plan

With codes and groups settled, decide the delivery sequence by trade, not by weight. A typical order for us runs:

  1. Appliance-integrated units and companion tall units first, so carpenters can set the run while wet trades are still finishing.
  2. The rest of the cabinetry run next, followed by worktops measured on site where the client prefers a field check.
  3. Glass-front, display and decorative items last, protected from the traffic of the earlier phases.

Each crate is labelled with the same unit codes used in the drawings, so the site team can unpack room by room instead of hunting through a mixed container. For international shipments our logistics and door-to-door delivery service handles packing lists, container loading plans and customs paperwork, which means the codes on the crate match the codes on the documents.

A Short Pre-Production Checklist

  • Every tall unit has a unique code that appears on drawing, quotation and packing list.
  • Appliance models are frozen, with installation sheets attached to the order.
  • Ventilation route and electrical position are drawn on the relevant elevation.
  • Storage-only units beside appliance units are included in the same batch and finish code.
  • Glass-front and display units have their glass type and shelf layout confirmed.
  • Worktop, skirting and ceiling-line details are settled before carcass heights are fixed.
  • Delivery phases match the site programme, with crate labels matching unit codes.

Specification note. Dimensions, materials, load ratings, glass specification and installation details for Santerson Integrated Appliance Tall Cabinets are set per configuration. Please confirm the final dimensions and selected specifications with our team for each unit on your project, together with the appliance installation requirements.

Send us your unit list. Share the room-by-room schedule, the appliance selections and the elevations, and we will return a grouped quotation for the integrated units, the companion tall cabinets and the surrounding cabinetry in one package. Contact PHILLIP on +86-13928214007 or through our contact page to start.