An integrated TV panel looks simple on a drawing: a screen set into a wall of cabinetry with storage and finish panels around it. On site it is one of the few joinery items where the furniture order, the electrical contractor, the screen supplier and the plasterer all have to agree before anything is cut. A written installation plan is what keeps them in agreement.

Santerson manufactures media and TV walls and wall-mounted media units as made-to-measure systems: dimensions, layout, finish and storage configuration are specified per project rather than picked from a fixed catalogue. That flexibility is the reason the plan matters. Below is the information we ask project teams to settle before production starts, and the details that most often cause rework when they are left out.

1. Screen selection and its exact dimensions

The panel is built around the screen, so the screen has to be chosen first. What we need in writing:

  • Screen make and model, or at minimum the finished width, height and depth of the display with any wall bracket already fitted.
  • Whether the screen sits flush, proud or recessed relative to the surrounding face line, and how far the panel surround overlaps the screen edge.
  • VESA pattern and bracket type, plus the load of screen plus bracket combined, so the fixing substrate behind the panel can be scheduled correctly.
  • Clearance for cables exiting the back of the screen and for any soundbar or speaker placed beneath it.

A common failure is a screen ordered after the joinery. Because these panels are made to measure, changing the display size later usually means rebuilding the centre module rather than adjusting it on site.

2. The services zone: power, signal and ventilation

Decide where every outlet, data point and cable run lands before the carcass is built. Practically, that means agreeing:

  • Position and number of power outlets behind the screen and inside the equipment compartment, on the finished face line so they remain reachable.
  • HDMI, network, optical audio and antenna runs, with pull-through access and spare capacity for a future device.
  • How components are controlled. Infra-red devices need either a visible window in the door or a panel material that passes the signal; Bluetooth and Wi-Fi devices do not, but they do need space to breathe.
  • Ventilation route for receivers, consoles and power supplies that generate heat, especially where equipment sits behind a closed door.

Where the design includes lighting, the electrical specification should be settled at the same stage. Our integrated LED media units are specified with driver location, cable run and switching confirmed for the selected design, because a driver buried behind a fixed panel is not serviceable.

3. Wall construction and fixing substrate

Tell us what the wall is. Timber stud, steel stud, brick, double brick, lightweight partition or an existing finished wall each needs a different fixing detail, and a screen suspended off a light partition requires solid blocking between studs. We need this confirmed for two reasons:

  • The load path for the screen and bracket has to land in structural timber, steel or specified blocking, not in plasterboard.
  • Full-height assemblies have to be restrained at floor, ceiling and head, which changes the setting-out if skirting, cornice or ceiling lining is still to be installed.

If the wall will be lined, rendered or papered after our panels arrive, say so. The panel edge detail and the reveal are set on the assumption that surrounding finishes are complete, and a late trade can force an unsightly scribe.

4. Layout, storage and access

The plan should record how the wall is used, not just how it looks:

  • Which compartments are open, which are hinged or sliding, and which hold items that need to be reached daily.
  • Door swing direction and clearance in front of the unit, including anything that has to open with a person standing between the wall and the sofa edge.
  • Shelf spans and adjustable shelf positions for the actual loads: books, glassware and media equipment have very different deflection limits.
  • Whether cables must be hidden behind removable access panels rather than fixed linings.

Where a project wants the screen concealed when not in use, our sliding panel TV systems cover that case; the plan then has to carry the track position, panel material and the mechanism requirement alongside the screen dimensions.

5. Finish schedule and sample approval

List every surface in the assembly with its material and finish: carcass, door fronts, open shelf linings, niche interiors and any contrasting reveal. Note where a finish has to match joinery supplied for the same project, such as interior fixtures elsewhere in the dwelling, and confirm which samples are approved before production. Sheen, grain direction and the edge treatment of an open shelf read differently on a large media wall than they do on a small cabinet, so a physical sample at full scale avoids a dispute after installation.

6. Survey, sequencing and site readiness

The plan is only useful with dates attached. Before we manufacture, we take dimensions from the completed opening rather than from drawings: floor level, ceiling level, wall squareness, and the position of every existing outlet and data point. On site, confirm the order of work, meaning plastering and paint complete, flooring laid or protected, screed dry, and services tested and labelled. Then confirm access for delivery and a clear route to the installation room, including lift or stair dimensions for the longest panel.

Our installation and after-sales support covers on-site fitting, inspection and snagging. The handover record should list what was installed against the approved schedule, so any later adjustment has a reference point.

A short pre-production checklist

  • Screen model, dimensions, weight, bracket and VESA pattern confirmed
  • Outlet, data and cable positions drawn on the finished face line
  • Equipment compartment ventilation and control method agreed
  • Wall type and blocking detail confirmed with the builder
  • Storage layout, door swings and shelf loads signed off
  • Finish schedule approved against physical samples
  • Site survey taken from the completed opening, not from drawings
  • Delivery route, access and installation date agreed with the site team

Send us the room elevation, the screen selection and a note on how the wall will be used, and we will return a panel design with dimensions, storage configuration and the services requirement marked for your confirmation. That single document is what keeps the joinery, the electrician and the plasterer working from the same numbers.