A metallic lacquer kitchen is specified the moment two things are settled: the exact openings the cabinetry has to fit, and the project information that tells the factory what to build. Here is the measurement list and the brief we ask for on metallic lacquer cabinets, so a quotation comes back accurate the first time rather than after three rounds of corrections.
Why the input list matters more than the finish name
Metallic lacquer sits in our Lacquer Kitchen Cabinet collection alongside matte, high gloss, shaker, textured and two tone variants. Every item in that collection is made to measure: sizing, material, finish and layout are set per project, not chosen from a fixed catalogue width. That is what makes the door panel look continuous across a run and lets an appliance disappear into the joinery.
It also means an estimate built on rough dimensions is of little use. Lacquered door fronts are produced to size and then finished, so a panel that is 15 mm too wide cannot be trimmed on site the way a raw board can. The measurement set below is what we work from; send it complete and the drawing stage moves quickly.
Measurements to record before requesting a quotation
| What to measure | Why we need it |
|---|---|
| Overall run lengths, wall by wall, at three heights | Older buildings rarely have straight walls. Three heights show the out-of-plumb and let us set scribes and filler panels into the design instead of leaving them to the installer. |
| Floor to ceiling height, and floor to underside of any bulkhead or beam | Sets whether tall cabinets reach the ceiling and how much depth a wall unit can take without crowding the work surface. |
| Window sill height, sill depth, and door swing direction | Determines where a wall cabinet may end and whether a hinged door will clash with the frame when it opens. |
| Worktop depth and the clear distance between worktop and wall unit | Controls drawer heights, splashback zone and whether tall appliances can sit in line with the counter run. |
| Appliance make, model and cut-out dimensions for oven, fridge, dishwasher, hob and extractor | Built-in appliances set the carcass openings. Model numbers matter more than approximate sizes. |
| Sink position, waste outlet location, tap hole count | Affects base unit choice and whether a drawer stack or a bowl cabinet goes under the sink. |
| Socket, switch, isolator and gas point positions | Hob extractors and built-in ovens need clearances; internal wiring is planned around these points. |
| Radiator, pipework, meter or any obstruction, with offsets from the two nearest corners | Obstructions decide where a run has to stop or step. |
| Corridor and doorway widths at the delivery route, plus lift or stair dimensions on site | Determines how large assembled sections can be and whether panels ship loose for on-site assembly. |
How to send them
- A sketch of each wall with dimensions written on it is enough; a hand drawing photographs fine.
- An architectural or joinery floor plan in PDF or DWG, if the project has one. Mark the kitchen zone and note the drawing scale.
- Photographs of the room from each corner, plus close-ups of corners, bulkheads and existing pipework.
- All figures in one unit, millimetres preferred, and state the unit on the drawing.
Project inputs that shape the specification
Measurements fix the geometry. The following decisions fix what is actually manufactured, and they are the part most enquiries leave out.
- Who uses the kitchen. A private villa kitchen and a villa's rental or service kitchen take different hardware, different door thicknesses and different wear expectations. Tell us the use, not just the room.
- Quantity. Number of kitchens or units in the project. Multi-unit work is scheduled as a batch, and identical repeats are produced from one approved set of drawings.
- Layout intent. Linear, L-shaped, U-shaped or with an island. Attach any layout drawing or reference image you already have; we produce 3D visual renderings from the brief rather than asking you to draw carcasses.
- Door style and edge profile. Flat slab is the usual pairing with a metallic lacquer front, but shaker and handleless profiles are available across the lacquer collection. A photo or sample reference settles this faster than words.
- Colour and sheen target. Send a RAL or Pantone reference, an existing sample, or a photograph of the target surface. Metallic effects read differently at high gloss and at matte, so we confirm the finish on a sample before full production.
- Carcass and interior preference. Board type, drawer configuration, internal fittings, integrated lighting. Our custom and OEM service covers bespoke finishes, textures and branding where the project calls for it.
- Matching items outside the kitchen. Wardrobes, vanities, media walls and doors in the same finish are produced together when they are on the same order, which keeps colour consistent across the building. See interior fixtures for the categories we build alongside cabinetry.
- Destination and delivery terms. Port or site address, and whether you want door-to-door delivery. Freight is arranged by sea, air or rail with the customs paperwork prepared on our side.
- Programme dates. Site completion date and any drawing-approval milestones, so production is sequenced against the build rather than against an assumption.
What we return once the inputs are in
- A layout proposal with an itemised quotation covering cabinets, worktops and fittings, so substitutions can be priced without reopening the whole order. Appliances are quoted separately by model when you nominate them.
- Production drawings for your approval, showing elevations, clearances and appliance cut-outs.
- A finish sample of the approved metallic lacquer colour before the batch is sprayed.
- Packaging and container loading planned around the site access dimensions you supplied.
Approval at the drawing stage is where changes stop being expensive. After sign-off, altering a lacquered door front means producing the panel again.
Two things buyers often leave out
Site conditions at handover. If the screed has not dried, or plastering runs after the cabinets arrive, the delivery date moves and the panels sit in storage. Confirm which trades finish before installation and tell us that sequence.
Who installs. We ship with assembly drawings and can support on-site installation and snag inspection. If a local joiner is fitting the units, send them our drawings before production so the service gaps, skirting returns and cornice details match what their trade expects.
Send us your measurements and brief
Attach wall dimensions, appliance model numbers, photographs and your target colour reference. We come back with a layout proposal, an itemised quotation and production drawings for approval.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or by email at santerson@qq.com. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).
Start with the product page for metallic lacquer cabinets, or send your drawings through our contact page.