Handleless cabinetry in a wood-grain and taupe palette is easy to specify on a mood board and hard to hold constant across a purchase order. The documentation below is what we ask project teams to record before production starts, so the cabinets that arrive match the drawings, the appliances and the site conditions.

Custom & OEM Interior Fixtures Project Procurement

The Wood & Taupe Handleless Kitchen Cabinets combine natural wood-grain panels with matte taupe flat doors. Because the look depends on two materials meeting across one run of doors, small variations in grain direction, board thickness or edge treatment show up quickly on site. Procurement records should capture those variables in writing rather than leaving them to a visual approval.

1. Panel and finish specification

Record the exact door construction, not just a colour name. For this style of cabinetry the practical items are:

  • Panel type and core board for doors, carcases and drawer fronts, stated separately for each.
  • Surface finish: wood-grain laminate or veneer on the timber-look doors, matte lacquer or laminate on the taupe doors, with the sheen level written down rather than implied by a photograph.
  • Grain direction per door and per elevation. A single sheet with reversed grain reads as an error on a handleless front, where there is no hardware to break up the surface.
  • Edge treatment — edge banding colour and thickness, or mitred edges — for every visible cut.
  • A signed physical sample panel for both colours, referenced by sample code on the purchase order and on the packing list.

Where a project mixes this cabinetry with other joinery packages, note which package governs at each interface. A Handleless European Cabinets specification written for a different door system will not automatically carry over to the wood and taupe combination.

2. Handleless mechanism and clearance

"Handleless" describes an appearance, not a single detail. State in the drawings how each run is opened — integrated profile pull, recessed channel, or touch-to-open mechanism — and record which method applies to wall cabinets, base cabinets, drawers and tall units. These choices change the required front clearance and the drawer rail selection.

  • Dimension the reveal at the top of base units and the bottom of wall units on every elevation.
  • List the hardware set by item: hinges, drawer slide rails, soft-close devices, support legs and connecting brackets, with brand or model where a project standard applies.
  • Confirm load rating for deep drawers holding pots or dry goods, since the specified rail is what carries that duty.
  • Note any run where a handleless detail cannot be maintained — a return into a wall, an appliance housing, a corner unit — and agree the alternative before order placement.

3. Appliance integration

This cabinetry reserves a position for a built-in oven, and similar provisions need to be documented for every integrated appliance in the run. The cabinet cannot be corrected after the carcase is cut.

Item to recordWhy procurement needs it in writing
Appliance make, model and exact recess dimensionsSet from the manufacturer's technical sheet, not from a catalogue photograph or a showroom mock-up.
Door type on the appliance (integrated panel, door-on-door, sliding hinge)Determines whether the cabinet front is the appliance front and how the panel is fixed.
Ventilation route and plenum depthAffects carcase depth and the adjacent tall unit; a common cause of on-site rework.
Electrical position, circuit and isolator locationCoordinates with the electrical contractor before first fix on site.
Oven height in the tall housingA dimension buyers change late; freeze it in the approved elevation.

Where appliances are supplied by others, attach their data sheets to the cabinet order as a controlled document set and record the revision date. If an appliance is substituted later, the affected elevations must be re-issued before production.

4. Storage layout and internal fitments

Cabinet size, internal storage partition and panel colour are customised per project, so the internal layout belongs in the procurement file alongside the external elevations. Document drawer configurations, shelf spans and adjustable versus fixed shelves, plus any pull-out hampers, corner systems or display shelving.

Open display shelving with built-in warm LED lighting is part of this design language. For each lit niche record the driver location, the cable route, the switching method and the spare routing for maintenance access. Lighting that is specified after the carcase order usually means drilled holes that were never planned.

For larger fit-outs where cabinetry spans kitchen, laundry and pantry zones, Custom Built-in Kitchen Cabinets for hotel and apartment projects are documented the same way: one controlled schedule covering dimensions, door style, finish code and hardware set per unit type.

5. Surfaces that meet the cabinets

The wood and taupe run is shown against a marble texture stone backdrop. Record who supplies the backdrop, its thickness and edge detail, and the tolerance allowed between stone and cabinet front. The same applies to worktops, splashbacks and flooring.

  • Worktop material, thickness, and whether the front edge is square, bull-nosed or mitred.
  • Splashback supply and fix method, and how it meets both the base units and the wall cabinets.
  • Floor finish and finished floor level, since support-leg height is set from that dimension.
  • Wall straightness and the setting-out line; handleless runs expose out-of-plumb walls more visibly than a front with handles.

6. Site conditions and measurement record

Before release to production, keep a second survey of the actual space: overall lengths, ceiling height at both ends, column and beam positions, door and window openings, skirting removal where required, and access routes for delivery. For apartments and high-rise work, confirm lift dimensions and whether units can be moved intact.

Record the survey date, the person who took it, and any deviation from the design drawings. Cabinet dimensions are made to that survey; a discrepancy discovered at installation is nearly always resolved on site at the buyer's cost unless the record shows otherwise.

7. Quantities, unit references and phasing

A cabinet schedule should give each unit type a unique reference repeated on drawings, packing list and labels. For multi-unit or multi-phase work — apartment floors, villa wings, guest-room clusters — state the quantity per unit type, then the phasing and delivery sequence by zone.

  • Unit schedule with references, dimensions, finish code and hardware set.
  • Spare parts and spare panel quantities for post-handover replacement; order them with the main package so the batch matches.
  • Packaging list mapped to room or zone labels, which is what installers actually work from.

8. Commercial terms and quality checkpoints

Write into the order the stages at which the buyer reviews work: approved shop drawings, signed sample panels, pre-shipment inspection photographs, and the packing list before container loading. For freight, record Incoterms, container plan and destination, plus the customs documents required for import — commercial invoice, packing list and certificate of origin.

SANTERSON's Custom & OEM Service covers bespoke finishes and materials with flexible minimum order quantities, and Logistics & Door-to-Door Delivery covers freight forwarding, customs paperwork and container loading. Import terms, duties and transit arrangements for a specific destination should be agreed per project rather than assumed.

Warranty scope, response arrangements and spare-parts supply are listed under Installation & After-sales Support. Record in the contract which items are covered, for how long, and what is excluded, so the handover file matches what the client will be told.

9. Installation and handover documentation

Close the package with an as-built set: final elevations, the hardware list actually fitted, appliance data sheets, lighting driver locations, and a snag list signed off at completion. Include a short maintenance note for the finishes — what to clean wood-grain and matte taupe panels with, and what to avoid — since this is the question facilities teams ask first.

Documentation checklist

SectionClosed when the file contains
FinishSample codes for both colours, grain direction per elevation, edge treatment.
Opening detailMechanism type per unit type, reveal dimensions, hardware schedule with load rating.
AppliancesModel list, recess dimensions, ventilation route, electrical positions, frozen oven height.
InternalsDrawer and shelf configuration per unit, lighting details for lit niches.
InterfacesWorktop, splashback, backdrop stone and floor finishes with tolerances and supplier responsibility.
SiteDated survey, deviations from design drawings, access and lift constraints.
CommercialUnit schedule, spares, phasing, Incoterms, inspection points, warranty terms.

A handleless kitchen is judged on the continuity of its surfaces. The documents that matter most are the ones that fix grain direction, reveal dimensions and appliance recesses before the first panel is cut.

Send us your elevations, appliance schedule and site survey, and we will return shop drawings with the finish codes, hardware sets and unit references recorded on them. That drawing set becomes the reference for production, packing and installation, and the file you hand over at completion.