A floating modular system looks simple on a mood board and complicated on site. The wall appears clear, the floor stays open, and yet the unit has to carry books, tableware, a television and lighting while staying square to a wall that is rarely perfectly flat. If you are specifying Santerson Floating Modular Systems for a villa, apartment or hospitality room, the checklist below covers the decisions that actually determine whether the job runs smoothly: what the system must do, how it is measured and built, how it attaches to your wall, and who coordinates it with the rest of the joinery package.

1. Scope: what the system has to do in the room

Before any dimension is drawn, write down the function list for each wall. A living room media wall and a guest-room storage wall both use floating modules, but they fail in different ways when the brief is vague.

  • Storage mix. Decide how much of the wall is open display, how much is closed cupboard, and how much is deep drawer. Santerson Mixed Open & Closed Systems is the reference point when you want concealed storage with display niches cut into the same run.
  • Appliances and equipment. A television, soundbar, wine fridge or coffee machine each needs a niche, ventilation clearance and a power position. Note the model numbers you intend to buy, not just "TV area".
  • Daily use load. Books and ceramics load shelves very differently from hanging garments or glassware. State the intended load per module so the shelf construction and support method can be specified accordingly.
  • Room context. Note floor finish, skirting, cornice, radiator, switch and socket positions, plus any door swing that crosses the wall.

2. Site measurement: the numbers your supplier needs

Made-to-measure sizing is part of how these systems are configured, so the accuracy of your survey drives everything downstream. Provide a measured drawing rather than a single overall length.

Item to recordWhy it matters
Wall length at three heights, plus out-of-plumb and out-of-level readingsOlder villa and apartment walls vary. The tolerance determines whether scribes, packers or a shadow gap detail are needed.
Floor-to-ceiling height and the position of any cornice or skirtingTells you whether to specify a floating run with a clear shadow gap or a Santerson Floor to Ceiling Modular Systems build that closes the wall completely.
Substrate behind the wall: masonry, stud partition, timber frame, or existing joineryDetermines fixing type and whether additional backing timber or steel framing must be installed before the units arrive.
Socket, switch, data and light-switch positions with heights from floor and datum lineCut-outs are machined in the factory only if they appear on the approved drawing.
Door and window reveals, radiators, pipework, and any obstruction within 300 mm of the wall facePrevents last-minute site cutting that voids the finish warranty of the panel edge.
Lift size, stair width and corridor turning radius at the delivery buildingLong panels and full-height doors must physically reach the room intact.

3. Configuration and finish specification

Santerson lists these systems as configurable, with layout, dimensions, material and finish options specified per project. Ask for a written specification sheet rather than accepting a photograph of a previous job.

  • Module grid. Confirm the width and height of each module, the vertical joint positions, and whether joints are flush or rebated.
  • Carcase and door material. Ask what substrate is used for carcase, doors and shelf fronts, and what edge treatment is applied to visible edges.
  • Finish and colour reference. Quote a specific paint code, laminate reference or veneer species and cut. For timber tones, request a physical sample before the drawing is signed off, because photographs shift colour between screens.
  • Handle detail. Handleless routed grooves, push mechanisms and exposed pulls each change the shadow line and the hardware specification.
  • Shelf spans and thickness. Confirm shelf thickness against the clear span for the loads listed in step 1.
  • Interior fitments. Drawers, soft-close runners, adjustable shelving, cable management, and any integrated lighting should appear on the drawing with quantities.
Where a product page shows an example configuration, treat it as a reference layout rather than a fixed specification. Dimensions, storage layout, finishes and electrical details are confirmed for your own project before production.

4. Lighting and services

Integrated lighting is where floating systems look best and go wrong most often. If you want lit niches or under-shelf strips, decide early: the cable routes, transformer position and access panel have to be built into the panels.

  • Confirm the fitting type, colour temperature and output for each niche, and whether dimming is required with a specific driver type.
  • Agree who supplies and connects the lighting: the joinery supplier, your electrician, or both with a defined handover point.
  • Locate drivers and transformers behind an accessible door or hatch, never sealed behind a fixed panel.
  • Mark low-voltage and mains cables separately on the drawing so the site electrician does not chase through a finished panel.

5. Wall support and fixing method

A floating system carries its own weight plus its contents with no floor support, so the fixing design belongs in your checklist, not in a site conversation on installation day.

  • Confirm the fixing method for your substrate: chemical or expansion anchors in masonry, solid timber noggins between studs in partitions, or a steel or timber subframe where the wall cannot take load.
  • Ask for the maximum permitted load per module and the total run length supported between fixing points.
  • Agree the shadow gap dimension at the top, bottom and sides, and how services crossing that gap are hidden.
  • For masonry walls, confirm whether a level datum track is used so the finished run is true even where the wall is not.

6. Documentation and approvals before production

Production should start only after one coordinated drawing set is approved. Ask your supplier for:

  • Dimensioned elevations of every wall in the run, with module joints, door swing directions and handle positions.
  • Sections through the hanging detail and the shadow gap.
  • A services layout showing sockets, switches, data points and lighting circuits.
  • A finish schedule listing each material with its reference code and sample approval date.
  • A packing list keyed to room and module number, so crates can be routed to the right floor on a multi-unit site.

7. Delivery, installation and handover

Santerson describes a workflow that runs from consultation and design through production, logistics, door-to-door delivery, installation and after-sales support. Use those stages as checkpoints in your own programme.

StageWhat to confirm in writing
Design and quotationFinal drawing revision number, what is included and excluded, and the point at which changes stop being free.
ProductionLead time from drawing approval, plus a pre-shipment photo or sample check for colour-critical finishes.
Packing and shippingPackaging standard, crate markings, container or consolidated shipment, import documentation and the delivery address with unloading access.
Site preparationWhich trades complete backing frames, making good, decorating and electrical first fix before installation begins.
Installation and snaggingWho installs, the programme duration, and a joint snag list signed at handover with door alignment and hardware adjustment included.
After-salesWhat is covered, how replacement parts such as hinges, runners and shelf pins are supplied, and who to contact.

8. Common gaps in a floating modular checklist

  • No load schedule. Deep book shelves specified for a span intended for decorative objects will sag; state the load per module.
  • Undocumented substrate. Plasterboard over a cavity is discovered on installation day, and the fixing detail has to be redesigned on site.
  • Lighting decided after production. Surface-mounted strips and visible cable trunking replace what should have been an integrated detail.
  • Finishes approved from screen images only. Timber veneer and warm-toned laminate read differently in raking daylight; keep signed samples on site.
  • Delivery address without access information. Long panels do not bend around a tight stairwell, and the extra handling cost lands on the buyer.

Working with a single supplier for the whole joinery package

Floating modular walls rarely stand alone. They meet kitchen cabinetry, wardrobes, doors and wall panelling, and each interface is a detail that can be resolved once or argued about repeatedly. Santerson is a China-based furniture and building materials manufacturer offering custom and OEM production together with design coordination, logistics and installation support, so the same drawing set can carry the modular wall, the Santerson Integrated LED Media Units opposite it and the surrounding fit-out. Published project references include villa work in Willoughby, Perth, North Turramurra, Melbourne and Sydney.

Send your measured drawings, room photographs and function list to the team, and ask for a specification sheet that answers items 1 to 6 above line by line. That single document is the fastest way to compare quotations on an equal basis.

Start your specification. Email santerson@qq.com or contact us through the contact page with your drawings and finish preferences, and we will confirm dimensions, materials and configuration for your project.