A 5.5-metre swim spa arrives on a flat rack, not on a pallet. Before the container is booked, the site has to answer three questions: can the shell reach its final position, where does the power come from, and who commissions the plant room equipment. This guide walks through delivery and installation planning for our Outdoor Swim Spa WS-PC05ST-L, using the specifications published on the product page as the starting point.
Start From the Published Shell Size, Not a Rendering
The catalog dimensions for this model are 5490 × 2400 × 1470 mm. Those three numbers drive almost every downstream decision: the transport mode, the lifting method, the size of the concrete plinth or pad, and the clearance needed around the shell for maintenance access. The same family includes shorter variants such as the WS-PC05ST at 5000 × 2400 × 1470 mm, so if a gate, side passage or lift lobby limits length, compare the variants before the order is placed rather than after.
Treat the catalogue figures as the design envelope and confirm them against the shipping drawings we issue with your confirmed configuration. The shell dimensions, cradle footprint and lifting points all come from those drawings, and they are what your builder, crane hire and freight forwarder should be working from.
Read the Configuration Sheet Before You Order the Electrical Work
The published specification for WS-PC05ST-L lists one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 6.55 kW. The water pump is not listed in the catalog entry for this model, because pumps, heat pumps and filtration options are configuration-dependent: the optional items on this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps.
That single fact changes the sequence of your programme. The electrical contractor cannot size the sub-main, the isolator or the dedicated circuit until the final option list is fixed, because adding a heat pump or upgrading the pump later raises the connected load. Our recommendation for procurement teams is simple: lock the equipment schedule first, then release the electrical drawing, then pour anything permanent.
| Item on the catalog sheet | What to confirm before site works begin |
|---|---|
| Catalog dimensions 5490 × 2400 × 1470 mm | Route from kerb or truck to final position, including width of the narrowest point |
| Total power 6.55 kW | Whether heat pump, extra pump or UV sterilization is in the order, since these change the load |
| 1 filter pump, 6 jets, 4 LED lights, 1 control system, 1 swim training system | Voltage, phase and protection device required at the wall by your local electrician |
| Optional steps, insulation, sand filtration | Whether these ship loose in the container or pre-mounted on the shell |
Choose the Delivery Mode Around the Site, Not Around the Product
Swim spas of this size normally travel by sea freight on a shared or dedicated container with a cradle, and the last leg is the part that goes wrong. Three site conditions decide the method:
- Access. If the shell can roll or slide to position on a prepared path, a low loader plus roller skates is enough. If a wall, garden or roof passes over the position, you need a crane or hiab, and the crane radius has to be surveyed before the truck is booked.
- Ground. A level, compacted, free-draining base sized to the shell footprint must be finished and cured before the shell comes off the truck. Dropping a full shell onto unsettled ground is the most expensive mistake in this category.
- Services. Power feed, drainage provision and any plant-room pipework should be stubbed to the position and photographed before backfill or tiling covers them.
As part of our logistics and door-to-door delivery service, we arrange sea, air or rail freight with the customs paperwork and container loading plan, and we share the packing list so your site team knows which crate holds the steps, controls and spare parts. Confirm the exact Incoterms, unloading equipment and lifting responsibility in writing before dispatch, because those terms decide who pays when a crane is needed at the gate.
Plan the Installation Window Around Commissioning, Not Assembly
A swim spa of this type is not assembled on site; it is positioned, connected and commissioned. The practical sequence we plan with project clients runs: set and level the shell on the finished base; connect power through the required protection device by a licensed electrician; install steps and any loose accessories; fill; run the filter pump, jets, lighting, ozone and swim training system through a full cycle; then walk the snag list with the client.
Two details save days on site. First, keep a clear access panel to the equipment compartment for the life of the installation — filters and controls need servicing, and tiled-in shells create problems. Second, book the commissioning visit while the shell is still exposed and easy to inspect. Our installation and after-sales support covers on-site installation, inspection and snags, warranty handling and spare parts; agree the scope, the site conditions expected on the day and who provides local labour before the vessel sails.
What to Fix in the Purchase Document
For villas and hospitality projects, the swim spa rarely sits alone — it is specified alongside outdoor furniture, pergolas, loungers and poolside paving. Coordinating those items in one procurement package avoids three separate deliveries competing for the same access route.
Before you sign, make sure these are written into the order rather than assumed:
- The confirmed model code and option list, including pump, heat pump, UV and filtration choices
- Electrical requirements for the selected configuration, supplied by us and passed to your electrician
- Delivery terms, unloading method and lifting equipment responsibility at destination
- Base preparation scope: who designs, pours and levels the plinth
- Commissioning date, snag process and the spare-parts route for jets, lights and controls
A short pre-delivery checklist for the site team. Confirm the shell can physically reach the position; confirm the base is cured and level; confirm the dedicated circuit matches the final option list; confirm access to the equipment compartment after finishing works; confirm who performs the first fill and chemical start-up. Five confirmations, taken before the container moves, remove most of the risk from a swim spa installation.
Ordering Through a One-Stop Supplier Changes the Paperwork
When the swim spa is bought together with cabinetry, lighting, flooring and outdoor furniture from a single one-stop furniture and building materials supplier, delivery planning becomes a consolidation exercise instead of six separate imports. Santerson has manufactured furniture and building materials since 2008 and works with villa, hospitality and office projects worldwide, supplying the shell together with the surrounding outdoor and interior package under one production and shipping programme.
The practical benefit is a single equipment schedule to coordinate: one set of packing lists, one customs entry, one installation window and one point of contact for warranty questions across the package. For Australian villa projects in particular, that coordination is what keeps a swim spa delivery from stalling the rest of the landscape and hardscape programme.
Send us your site constraints early. Share the access photos, the intended base detail and the option list you are considering for the WS-PC05ST-L, and we will return the configuration sheet, electrical requirements and a delivery plan you can hand to your builder. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use our contact page — enquiries receive a response within 24 hours.