Drawer units travel farther than almost any other piece of a bathroom fit-out: from the factory floor, through two or three handling legs, into a container, and finally onto a site where tiling and waterproofing may already be finished. For Santerson Drawer Units, which are made to the dimensions and finish each project specifies, packaging is not a formality - it decides whether the unit that arrives matches the unit you approved. Here is what buyers, contractors and procurement managers should confirm with the supplier before the goods leave the factory.
Why Packaging Matters More for Made-to-Measure Units
A standard cabinet can usually be replaced from stock. A made-to-measure drawer unit cannot. Because Santerson Drawer Units are configured per project - size, layout, material and finish chosen for a specific bathroom - a damaged case is not a spare-part problem; it is a re-manufacture and a re-shipment, with the schedule penalty that implies. That is why packaging questions belong in the purchase order discussion, not in the claims correspondence after delivery.
The second reason is content mix. Drawer units are usually shipped as part of a wider bathroom fixture order that also carries ceramics, mirrors, shower sets and sometimes lighting. Ceramics and joinery fail in different ways and need different protection, so a single blanket packing method for the whole consignment is usually the wrong answer.
Confirm the Packing Method Item by Item
Ask the supplier to state, in writing, how each unit is packed rather than accepting "standard export packing". For a drawer unit specifically, four elements are worth pinning down.
- Carcass protection. The case should be protected on edges and corners, where impact during handling actually concentrates. Corner protectors and a rigid outer case matter more than thick foam on flat faces.
- Drawer boxes and fronts packed separately or restrained. Loose drawer boxes sliding inside a case during transit can break runners, jam fixings and bruise the front panel. Confirm whether drawers ship installed, suspended in separate cartons, or restrained in place.
- Hardware kit handling. Runners, hinges, handles and fixings should be bagged, labelled to the matching unit and either secured inside the carton or shipped in a marked accessory box that travels with it.
- Surface finish facing. Veneer, lacquer and laminate faces mark if two panels rub together. Confirm that finished faces are separated and wrapped, not stacked bare.
Ask How the Units Will Be Loaded in the Container
Once you confirm furniture logistics and door-to-door delivery, ask for the loading plan for your specific consignment rather than a general description of the service. Drawer units are shallow, tall and heavy for their volume; stacked incorrectly they tip and crush each other in a rolling container.
| Question to ask | Why it matters |
|---|---|
| Will drawer units be strapped to pallets or blocked against one another? | Unrestrained tall cases shift sideways at sea and land on their edges. |
| Are ceramics loaded away from joinery, with a separation layer? | A basin shifting against a cabinet case damages both the glaze and the panel. |
| Is there dunnage or void-filling for the space the units leave behind? | Half-empty rows collapse into each other; voids should be filled, not left open. |
| Are cartons marked with room or unit references from your drawings? | On site, labelled crates are what stop installers opening the wrong bathroom set first. |
| Is container loading photographed before sealing? | Photographs settle damage disputes between the two parties who actually saw the goods last. |
Agree the Inspection Point and the Evidence You Both Keep
Decide before shipment where responsibility transfers and what each side records. If your terms place the inspection duty on arrival, plan for it: check cartons for punctures and corner damage while the container is still being unloaded, and photograph any damaged packaging before the contents are removed, because a crushed carton with no photograph is very hard to attribute afterwards.
Match Packaging to the Last Leg of the Journey
A unit that survives ocean freight can still be ruined on the final leg from port to site. Confirm how the goods reach the building: a ground-floor hotel corridor is one thing, an upper-level villa with narrow stair access is another. Where crates must be carried, corner protection and a rigid case are worth the extra cost, since installers handling a heavy case on a stairwell will not be gentle with it.
Coordinate the delivery date with the wet trades. Drawer units should ideally land after tiling, waterproofing and painting are complete, so cases can be stored inside a clean, dry space rather than left in a dusty entrance hall. If furniture installation and after-sales support is part of the order, tell the supplier the storage conditions you can offer on site - it changes how tightly the units need to be wrapped.
What to Put in Writing Before Production Starts
- Packing specification per item: case protection, drawer packing method, hardware handling, finish separation.
- Container loading plan and crate numbering tied to your room schedule.
- Loading photographs supplied before the container is sealed.
- Named inspection point and the damage-reporting window that applies after delivery.
- Delivery date aligned with completion of wet trades, plus agreed on-site storage conditions.
These five lines cost nothing to add to a purchase order and remove most of the argument if something arrives damaged. Buyers working across several turnkey interior project solutions usually standardise them once and reuse the same wording on every order.
Santerson Drawer Units are specified per project for size, layout, material and finish. Send us your bathroom drawings and we will confirm the packing specification, crate numbering and loading plan for your consignment before production begins.