A reflective wall finish looks simple on a drawing and complicated on site. Before Santerson Glass & Glossy Panels go into production, the decisions you lock down determine whether the panels arrive ready to install or turn into a set of site problems. The checklist below follows the order we actually need from buyers on villa and hospitality projects.

1. Where the panels are going, and what they have to survive

Tell us the room before you tell us the finish. A hallway feature wall, a wardrobe front in a bedroom, a splash zone next to a basin and a reception backdrop do not carry the same requirements for impact, moisture, cleaning agents or handling by third-party trades.

Our product page presents these panels as configurable wall-system panels for residential projects. It does not publish a fixed performance sheet, so we treat suitability as something to confirm per project rather than something to assume. If the wall sits in a wet area, near a shower enclosure, in a gym, or in a hotel corridor with high traffic, say so at the enquiry stage and ask us in writing which panel build and edge detail we are proposing for that location.

2. Substrate, flatness and the setting-out drawing

Glass and glossy surfaces expose every deviation in the wall behind them. Before production we need:

  • The substrate type the panels will be fixed to, and who is preparing it.
  • A setting-out drawing showing panel joints, opening lines and how they relate to doors, skirting, reveals and services.
  • Confirmation of finished floor and finished ceiling levels, not structural ones.
  • The location of sockets, switches, light points, TV positions, brackets and any concealed wiring.

Send the drawing at finished-line level. A panel order sized from a rough opening is the most common cause of on-site trimming, and trimming a glossy or glass face is where panels get written off.

3. Exact dimensions and how openings are handled

These panels are made to measure, so measurement responsibility needs naming in the order. We need overall width and height per wall, plus each opening, niche and reveal, stated as finished dimensions with a tolerance you can hold on site.

Decide before production how corners and returns are resolved: mitred, square-edged with a trim, or wrapped. Each option changes both the appearance of the joint and how the panels travel.

4. Finish, gloss level and the sample you sign

"Glossy" covers a wide band of reflectivity, and glass panels vary in tint, clarity and backing. Specify what you are expecting, then ask for a physical sample before the full order runs.

Item to confirmWhy it matters
Gloss level of the faceDetermines how much light and how many fingerprints the wall shows
Glass tint or clarity, and what sits behind itColour and depth change once the panel is fixed to a wall
Edge treatment and joint widthSets the visible line pattern across the elevation
Fixing method and hardwareAffects the build-up thickness and the setting-out grid
Cleaning product the client will useDaily maintenance can damage a finish that was specified correctly

Sign the sample against a reference panel, not a screen. Approve it under the same lighting the room will have, and keep the signed sample for goods-in inspection at the end of the project.

5. Integration with lighting and adjacent finishes

A reflective wall is a lighting decision as much as a material one. Before production we need to know where wall washers, sconces, strip lights and pendant positions sit relative to the panel joints, because a light source placed at the wrong angle turns a glossy panel into a mirror of everything you did not want reflected.

Also confirm how the panels meet the finishes either side of them: flooring, stone, timber panelling, mirrors and doors. If your scheme mixes finishes across one elevation, our Santerson Textured Panels and Santerson Matte Lacquer Panels are specified the same way, so joint lines, substrate preparation and fixing details should be coordinated across all of them in one drawing rather than three.

6. Quantities, phasing and packaging for the site you have

Confirm panel count per elevation, plus spares for future maintenance. Oversize panels need to pass through the actual access route on site: lifts, stairwells, door sets and turning radii. Tell us the delivery address type, whether it is an occupied building or a bare shell, and what handling equipment is available at that address.

On multi-unit projects, tell us which units are identical so we can repeat an approved setting-out instead of re-cutting each one.

7. What gets frozen before production starts

Our cooperation steps run as brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Anything you change after the second step becomes a variation. The items to freeze are:

  • Final setting-out drawing with revision number and date
  • Approved finish sample and gloss level
  • Panel sizes, edge details and joint widths
  • Fixing method and the party responsible for substrate preparation
  • Delivery address, access route and phasing
One point most buyers miss: decide who inspects the wall before the panels are fixed. Glass and glossy panels amplify an uneven substrate, so a sign-off on flatness between your builder and our production team prevents the panel order from becoming the fix for someone else's work.

Ordering through one supplier keeps the wall consistent

Wall panels rarely arrive alone. When cabinetry, doors, wardrobes and wall finishes come from different sources, the joint details between them get decided on site by whoever is standing there first. As a furniture and building materials manufacturer working on villa and hospitality fit-outs, we produce these panels alongside cabinetry, joinery and other interior fixtures, so the same drawing governs where each element meets the next.

If you are specifying several wall finishes across one project, review the full wall panel systems range together and issue one coordinated setting-out package for all of them.

Send us your elevation drawing

Share the room, the elevation drawing at finished-line level, and the finish you have in mind. We will come back with the panel build we propose for that location, the details still open, and what we need from your site team before production is released.