A flush interior door is one of the easiest details in a fit-out to get wrong, and one of the most expensive to fix once the wall finish is on. The door leaf has to sit in the same plane as the surrounding wall, carry the same finish, and still open and close cleanly alongside skirting, architraves, flooring levels and lighting that other trades are installing. This guide walks through how Santerson Flush Interior Doors are specified and coordinated with the wall panels, joinery, flooring and lighting around them, so the opening disappears into the design instead of fighting it.

What "flush" actually has to deliver on site

In a flush door arrangement, the leaf, the frame and the finished wall face sit on one plane with no protruding architrave breaking the line. That single requirement pulls in several trades at once: the door supplier, the wall finish, the framing or partition builder, the flooring contractor who sets the threshold, and sometimes the electrician running a switch near the reveal. Where each party works to their own drawing, you get the familiar failures — a leaf proud of the plasterboard, a gap that widens toward the top of the opening, or a veneer match that reads as two different woods under daylight.

Santerson's flush interior door range is made to order rather than supplied in fixed sizes. The flush interior doors, the Santerson Flush Hinged Doors and the Santerson Flush Sliding Doors are all configured per project: dimensions, material and finish are selected against your drawings, and the layout is set to suit the space. That flexibility is what makes coordination possible — but only if the door is treated as part of the wall build-up from the start, not added at the end.

Choose the operating type before you choose the finish

Finish decisions are the visible ones, but the opening mechanism governs the wall build. Decide this first, because it changes framing, floor levels and clearances.

Situation in the planType to coordinateWhat the surrounding trades need to know
Standard room entry where the leaf swings into the corridor or roomFlush hinged doorFrame position, swing direction and clearance from skirting and any adjacent joinery run
Closet, utility or bathroom where a swinging leaf would clash with a vanity, wardrobe or fixtureFlush sliding doorTrack and pocket detail, wall build-up depth, and floor threshold line
An opening that should read as plain wall when closed, with no visible handleHandleless concealed door or Flush Wall Aligned DoorExact wall finish thickness, gap setting, and how the leaf is to be opened
A utility or store cupboard hidden behind a decorative wall surfaceDecorative concealed doorWhich decorative finish continues across the leaf, and where access is required
A conventional internal door where a flush detail is not neededStandard interior hinged doorArchitrave profile and skirting return, which are simpler than a flush detail

A practical rule: specify the flush or concealed detail only where the design genuinely asks for an uninterrupted wall surface. Every flush opening adds coordination work, so use it deliberately on feature walls, corridors and guest-room entries, and keep standard hinged doors on back-of-house and service areas.

Matching the door to wall panelling

This is where a one-supplier fit-out earns its keep. When the door leaf and the wall panels come from the same production run, the veneer, lacquer or textured surface can be carried across the opening without a visible seam.

  • Wood veneer walls. Pair the door with Santerson Wood Veneer Panels, and keep the grain direction consistent between leaf and panel. For a hinged door in the same veneer family, Santerson Wood Veneer Hinged Doors give you the matching leaf.
  • Painted or lacquered walls. Santerson Matte Lacquer Panels and a matte lacquer door leaf should be ordered together so the sheen level is identical. A door that matches on colour but not on sheen will flash differently under the same lighting.
  • Textured or feature walls. With Santerson Textured Panels, decide whether the texture is meant to run continuously across the leaf or whether the door should read as a deliberate recessed panel. Both are legitimate; they simply need to be drawn.
  • Doors built into a panelling scheme. Where an opening sits inside a wider joinery wall, the Integrated Door & Paneling route lets the door and panel be treated as one assembly rather than two separate deliveries.

Sample on site, in the actual light. Bring a panel offcut and a door finish sample together, tape them side by side on the finished wall, and look at them at the time of day the space is used most. Colour chips under showroom lighting are not a substitute.

Coordinating with joinery, flooring and lighting

Joinery and built-in storage

Where a door opens beside a run of cabinetry, the reveal between the door frame and the nearest cabinet case needs to be set on the drawing, not left to the fitter. A consistent reveal width across the job — the same gap at every opening — does more for perceived quality than any individual product choice. If the wardrobe or storage wall is being supplied as part of the same package, say so in the enquiry and ask for the door and cabinetry elevations to be checked against each other before production.

Flooring and thresholds

Set the finished floor level on the same drawing as the door schedule. Hinged leaves need a clear under-leaf gap that suits the floor covering; sliding leaves need the track and threshold resolved before the screed goes down. If engineered timber runs through the opening, keep the board direction continuous across the threshold rather than terminating at the doorway — for example with European oak engineered wood flooring, a single uninterrupted run reads as one floor and makes the flush detail look intentional.

Lighting near the opening

Wall lights close to a flush opening draw attention to the gap line, which can be either the point or the problem. Where sconces sit near an entry, wall sconces should be set out after the door position is fixed, so the fitting does not land on the reveal. Inside adjacent joinery, integrated cabinet lighting needs its wiring route agreed with the door frame position before the carcass is built.

The coordination sequence that prevents rework

  1. Issue one door schedule with the wall build-up. For every opening record the type, size, swing or slide direction, frame detail and the finish that continues onto the leaf.
  2. Fix the wall finish thickness before ordering frames. A flush detail only works if the finished wall thickness is known; changing plasterboard or panel thickness later moves the whole plane.
  3. Confirm made-to-measure sizes on site, not from the plan alone. Take openings after the wall finishes are complete, and re-check level and plumb before final dimensions go to production.
  4. Order doors and panels as one package. Same supplier, same batch, same finish reference — this is what removes the seam problem.
  5. Set out flooring, skirting and lighting against the door schedule. One drawing, coordinated levels, agreed reveal widths.
  6. Inspect before handover. Check each leaf for plane alignment with the wall, even gaps top to bottom, and clean operation with the final floor covering in place.

What to send with your enquiry

To get a coordinated quotation rather than a door price, include: the room-by-room opening schedule with sizes; the wall finish specification for each opening; whether the leaf should match or contrast with the wall; floor finish and threshold detail; and any joinery adjacent to the opening. Santerson's custom and OEM service covers bespoke finishes and materials alongside made-to-measure sizing, so a project-specific configuration can be specified at quotation stage.

Checklist before you commit

  • Opening type chosen by function, not appearance — hinged, sliding or concealed
  • Finished wall thickness confirmed and shown on the door schedule
  • Door leaf finish matched to the adjacent panel from the same package
  • Grain direction and sheen level agreed for veneer and lacquer finishes
  • Reveal widths standardised across all openings on the job
  • Floor levels, tracks and thresholds resolved before production
  • Sizes verified on site after wall finishes, before final dimensions are issued
  • Switches, sockets and sconces set out clear of the reveal

Frequently asked questions

Can flush doors be supplied for non-standard opening heights?

Yes. The range is made to measure, so heights and widths are set from your verified site dimensions rather than chosen from a fixed size table. Full-height leaves that run to the ceiling line are specified the same way.

Should the door match the wall panels exactly?

Usually yes, when the design intent is an invisible opening — order leaf and panels together so the finish is consistent. A deliberate contrast is also workable, provided the change of material is drawn and detailed at the reveal.

When in the programme should doors be ordered?

Confirm the type and finish early enough that frames can be built into the wall build-up, then release final sizes after the wall finishes are complete. Ordering to plan dimensions before the plasterboard or panelling goes on is the most common cause of a door sitting proud of the wall.

Send us your opening schedule. Share the room-by-room door list, wall finish specification and floor levels, and we will quote the flush interior doors together with the matching panels, joinery and flooring so the whole detail arrives as one coordinated package.

Contact PHILLIP — Phone/WhatsApp +86-13928214007 — Email santerson@qq.com — Contact page