Wall systems are easy to under-order and easy to over-order. Order from a drawing that shows only elevations, and you will be short of the returns, reveals and transition strips the moment the panels reach site. Order by gross wall area instead, and you pay for material that never goes on a wall. This guide walks through the quantity planning and product coordination we use when a project specifies Santerson Acoustic Panels, so the panel schedule, the sliding systems that sit next to them and the fixing details all arrive together and fit together.
Start with a room-by-room panel schedule, not a total area
Santerson Acoustic Panels are made to measure: finish, layout and dimensions are specified for each space rather than chosen from a fixed size range. That is an advantage on site, but it removes the safety net of off-the-shelf sizes. Every opening has to be measured and recorded before an order can be confirmed.
Build one schedule line per wall, not per room. For each wall record the run length, the height, the position of every door, window, switch plate, socket, air grille and picture rail that falls inside the panelled zone, and whether the panel wraps around the corner or stops with a trim. Then note what is behind the wall: stud spacing, existing plaster condition, and whether services need to be relocated before anything is fixed.
- Mark each wall as full height, partial height with a header, or interrupted by an opening — these take different cuts and different edge details.
- Record the finish for each wall separately. A bedroom that continues into an ensuite rarely carries the same surface in both spaces.
- Note access requirements: inspection hatches, meter boxes, valves and filters that must stay reachable after the panels are up.
- Flag walls with out-of-plumb or uneven substrates now. Made-to-measure panels correct for modest variation, but a badly out-of-plumb wall needs packing designed in, not improvised on the day.
How to count quantities without double-counting
Work in net panelled area per wall and keep the arithmetic visible. Measure the full rectangle of each panelled zone, then deduct openings individually rather than applying a blanket allowance. Deductions for doors and windows are straightforward; the items people miss are the small ones — recessed niches, radiator recesses, low-level skirting that has to be removed, and the depth of reveals where a window meets the wall.
| Quantity item | How we measure it | Why it matters for coordination |
|---|---|---|
| Net panel area per wall | Full rectangle minus each opening, recorded wall by wall | Made-to-measure sizing is confirmed per wall, so a single room total cannot be released to production |
| Panel count and module width | Net run divided into modules, with the last module adjusted rather than cut to a sliver | Determines joint pattern against doors and corners; a 40 mm end piece looks like a mistake even when it fits |
| Return and reveal pieces | Depth of each return measured at several points around the opening | Wall thickness varies within one building; a single recorded depth will not fit every opening |
| Edge and transition profiles | Linear metres of external corner, abutment to plaster, abutment to floor or ceiling | Ordered with the panels, not after them — missing trim stops installation on the final day |
| Sliding system leaves and track length | Clear opening width plus the overlap each leaf needs when open | Track length and pocket depth are set by the panel layout, so a late change moves everything |
| Fixing and substrate allowance | Battening or packing material for the measured wall condition | Substrate work is site-side; if it is not in the plan it becomes a delay that nobody priced |
Order one complete room first when the schedule covers several buildings or phases. That single install tests the joint pattern, the trim detail and the site's ability to prepare substrates to the drawing. Everything learned there is applied to the remaining rooms before their panels are cut.
Coordinate the acoustic panels with the sliding systems beside them
Acoustic panels rarely stand alone. In a home theatre, media wall or bedroom suite they usually meet a sliding front of some kind, and both sides are made to measure — which means the two orders constrain each other. Where the design calls for a movable front, specify it from the same panel family so finish, grain direction and joint rhythm carry across.
- Santerson Acoustic Sliding Panels continue the acoustic treatment across an opening that has to close. Confirm the track, hardware and opening dimensions per project before the fixed panels are measured, because the leaf sizes come from the same grid.
- Santerson Partition Sliding Systems divide a space rather than line it. Pocket depth and floor clearance must be resolved before either the partition or the adjacent wall panels are set out.
- Santerson Textured Sliding Panels pair with fixed Santerson Textured Panels where the requirement is visual rather than acoustic. Order both from one schedule so the texture matches across moving and fixed surfaces.
- Wall Panel Systems in wet or bathroom-adjacent zones need a different specification from bedroom panelling; confirm the selected material for each location rather than carrying one finish through the whole floor.
The practical rule: measure sliding openings last, after the fixed panel grid is agreed. Measuring them first locks you into an opening dimension that the panel joints then have to fight.
Confirm finishes and performance per project, not per product
Panel listings on the site show configurable sizing with material and finish options; they do not publish a single technical sheet that covers every build. Before any order is released, ask for the specification of the exact configuration you are buying: core and facing construction, the selected surface and its edge treatment, fixing method, and — for acoustic positions — the performance of that specific combination as built, including how it behaves around joints and penetrations. A panel's acoustic behaviour depends on the assembly, not only on the face material.
Sequence the order so nothing waits on anything else
- Stage 1 — schedule sign-off. Panel lines numbered, each tied to a drawing reference. Nobody orders from a marked-up PDF.
- Stage 2 — substrate survey. Wall-by-wall condition recorded, deviations noted, battening and packing agreed with the site team.
- Stage 3 — production release. Made-to-measure sizes and finishes confirmed per line, sliding hardware included in the same release.
- Stage 4 — delivery split by zone. Panels delivered room by room or floor by floor. A single drop of mixed-size panels in a small storage area creates damage and mis-lays.
- Stage 5 — install and inspection. Fixed panels, then sliding systems adjusted against them, then snags closed while the trade is still on site.
Before you release the order, check these eight items
- Every wall line has a drawing reference and a finish code.
- Openings are deducted individually, with reveals measured at several points.
- Trim and transition profiles are counted in linear metres and on the same order.
- Sliding leaves, tracks and pockets are dimensioned against the fixed panel grid.
- Access hatches and services are located on the schedule, not remembered later.
- The configuration specification is confirmed for each location type.
- Delivery is split by zone with a labelled packing list.
- Substrate preparation is assigned to a named party with a date.