What the Proposal Should Confirm Before You Compare Prices
A parquet quotation is rarely wrong about price and rarely complete about specification. Before a proposal for European Oak Parquet Engineered Hardwood Flooring (1848) enters a commercial bill of quantities, the paperwork needs to state what is being supplied, in what build-up, and against which drawings. The checks below follow the order a procurement reviewer normally works in.
SANTERSON is a China-based furniture and building materials supplier working on villa, hospitality and office projects, and engineered oak flooring sits inside that scope alongside cabinetry, wall panelling, lighting and joinery. That matters for evaluation: a single supplier quoting the floor together with the fixed furniture and wall finishes is one document to reconcile, not three.
1. Construction and Top-Layer Thickness
The product description for 1848 records a 3 mm solid oak wear layer over a multi-layer engineered structure. Ask for that build-up restated in the proposal, item by item:
- Total board thickness and the thickness of each ply in the core
- Wear-layer thickness, stated as a machined figure rather than a nominal one
- Finish system — factory lacquer or oil, number of coats, and whether field finishing is excluded
- Backing and edge detail, since these govern how the board behaves over a screed
Wear-layer thickness decides whether the floor can be sanded and refinished during its service life, which is the difference between a replaceable asset and a renewable one in a commercial setting. A 3 mm layer supports refinishing; what matters commercially is that the number appears in writing on both the datasheet and the quotation, not only in marketing copy.
2. Format, Pattern Set-Out and Cutting Loss
Parquet is specified by pattern as much as by material. The proposal should name the module — block size, plank size, herringbone or chevron geometry — and attach a set-out drawing for each room rather than a single typical section.
| Item to see in the proposal | Why it changes cost and programme |
|---|---|
| Pattern drawing per area | Border cuts, thresholds and entry points are where parquet disputes start |
| Board dimensions and tolerance band | Width and length tolerances affect joint alignment across batches |
| Cutting allowance basis | The allowance the supplier calculated may not match the site waste your installer assumes |
| Border and trims included or excluded | Frequently quoted separately, and easy to miss in a total-price comparison |
Related lines in the same catalogue help here. If the design calls for a different geometry, compare against European Oak Herringbone Engineered Wood Flooring and European Oak Engineered Parquet Flooring, and request the same fields for each so the comparison is like for like.
3. Grade, Colour Range and Batch Control
European oak varies within a single grade. A workable proposal states the selected grade by name, attaches a signed physical sample reference, and says how colour continuity will be handled across production runs. Ask specifically:
- The grade name and the knot, sapwood and mineral-streak allowances that come with it
- Whether boards are mixed from several bundles per carton or sorted by tone
- How a re-order for a later phase is matched to the original batch
- Which sample is contractual — the showroom piece or a production-line offcut
For a phased hotel or apartment handover, batch continuity is a commercial risk, not an aesthetic preference. Put the re-order matching obligation in the purchase order before signing.
4. Substrate, Heating and Installation Interface
The 1848 product page describes this floor as compatible with underfloor heating. Treat that as a condition to verify rather than a conclusion: the proposal should state the adhesive or fixing method, the permissible screed moisture content at laying, the maximum surface temperature of the heating system, and who is responsible for acclimatisation on site.
A floor quoted without an installation interface section has not been priced — it has been estimated. Every commercial claim you will later make about defects rests on this section being explicit.
The multi-layer construction described for 1848 is the reason engineered boards are specified over solid strip in conditioned buildings: the cross-ply core resists the movement that a single lamell shows when humidity swings. The proposal should still define the humidity range the floor will be expected to live in, particularly where the building runs heating hard in winter and stands idle in shoulder seasons.
5. Supply Route, Delivery Split and Site Storage
For imported flooring, the delivery terms change the evaluation as much as the unit rate. Request sea, air and rail options with a door-to-door breakdown covering packaging, container loading, customs documentation and tracking through to the site, so landed cost and lead time are visible rather than inferred.
Also confirm where cartons will be stored on arrival. Engineered oak delivered to a wet building envelope is a claim waiting to happen, and the storage condition belongs in the installation method statement.
6. Warranty Terms and After-Sales Handling
Read the warranty as a scope document. It should state what is covered (delamination, board deformation, finish adhesion), what voids it (site finishing, unsuitable substrate, uncontrolled humidity), who performs remedial work, and how spare material for repair is supplied after handover.
Where the same supplier also provides joinery, wall panelling and installation and after-sales support, ask whether one defects schedule covers all of it. One coordinated snag list across floor, cabinetry and panelling is cheaper to administer than three.
A Shortlist Test for the Final Two Proposals
Put both quotations side by side and score them on five lines only: build-up stated with machined thickness; set-out drawing per area; grade and batch-matching obligation; installation interface including heating limits; warranty scope with exclusions. The lower unit rate rarely wins once those five are priced consistently.
If the flooring package sits inside a wider fit-out, ask for it as part of a single coordinated scope through our turnkey solutions service, so floor, joinery and finishes are drawn, produced and delivered against one programme.
Send the drawings, target pattern and handover phasing, and we will return a specification-level proposal for European Oak Parquet Engineered Hardwood Flooring (1848) or an equivalent line in the same range.
Contact: PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com