A swim spa quote rarely goes wrong over the shell. It goes wrong over what was never written down: which pump is included, who supplies the heat pump, how the unit reaches the site and who connects it to power. If you are specifying Outdoor Swim Spa WS-115AⅢ-U for a villa terrace, a resort garden or a private residence project, the quality of your request for quote decides how comparable the returned prices actually are. The guidance below is what we ask buyers to put in writing, using this model as the worked example.

Start With the Site Conditions, Not the Model Number

Model selection is only the first line of an enquiry. Two identical units can carry very different delivered costs depending on where they land and how they are reached. Before asking for a price, state:

  • Installation setting. Above-ground on a terrace or deck, semi-recessed into a platform, or fully in-ground with access chambers. Each changes the panel arrangement, the service access and whether steps are needed.
  • Structural support. The finished weight of a filled acrylic shell is substantial. Confirm the load rating of the deck, slab or ground beam supporting it, and share the dimensions of the prepared base.
  • Access route. Gate widths, stair runs, crane or forklift availability at the delivery point. This determines packaging method and whether the shipment can be handled as standard freight.
  • Power supply on site. Available voltage, phase, dedicated circuit capacity and the distance from the distribution board to the spa location. Electrical work is normally carried out locally by your contractor, so this belongs in the enquiry from day one.
  • Drainage and water supply. Where the unit drains to, whether a fill line and an overflow are provided, and any local requirement for a licensed plumber or pool fencing.

Buyers who send these six items with their first message usually receive one clear quotation. Buyers who do not often receive two different prices from the same supplier on consecutive days, because the supplier was guessing.

State the Configuration You Actually Want

WS-115AⅢ-U sits in our configurable outdoor swim and hydrotherapy range. The catalogue entry for this model records the following, and a good request for quote repeats these points back to the supplier so both sides are reading the same specification:

Catalogue itemWhat to confirm in your RFQ
Model: WS-115AⅢ-UConfirm you are quoting this exact model, and not a visually similar variant with different equipment.
Catalogue dimensions: 3880 × 2200 × 1250 mmTreat these as catalogue figures. Ask for the confirmed dimensional drawing for your configuration before you build the platform or order surrounding paving and decking.
Jet total: 23 pcs, with water pump 4 pcs and filter pump 1 pcAsk which pumps are included in the quoted price and which circuits they serve.
Control system: 1 setAsk what the control panel covers — jets, heating, lighting and filtration timing.
LED lights: 1 pc; features shown include water jets, LED lighting and ozoneConfirm ozone generation is in the quoted price rather than an optional upgrade.
Total power: 11.85 kWTreat this as the catalogue figure for the configuration shown. Request the confirmed electrical load for your selected equipment before your electrician sizes the circuit.

One point deserves emphasis. The "U" configuration in this series is listed without a swim training system, unlike some other variants in the same range. If continuous swimming against a current is part of what you are buying, say so explicitly and ask which model in the range delivers it at your site dimensions. Getting that wrong is the single most expensive specification error in this product family.

Optional Equipment: Ask for It Priced Separately

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so request each as a separate priced line rather than accepting one bundled figure. A line-item quotation lets you decide later whether to add a heat pump or insulation package without reopening the whole order.

Three questions are worth asking directly:

  • Is the heat pump sized for your ambient climate, and is it included in the quoted price or shipped separately?
  • Does the insulation package cover the shell, the cabinet base and the pipework, or only part of it?
  • Which filtration route applies to your water conditions — cartridge, sand filtration or an add-on system?

Put the Delivery Terms in the Request, Not After It

A swim spa is heavy, awkward freight that arrives on a pallet or in a crate with panels and equipment around it. The delivered price depends on terms as much as on the product. Because outdoor water features are supplied here alongside the rest of a project package by one one-stop furniture and building materials supplier, we normally see the smoothest deliveries when the buyer states transport requirements in the RFQ:

  • Incoterms and destination. Port of entry or door-to-door address. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading, but the terms you request determine what is quoted.
  • Container plan. Whether the spa ships alone or consolidated with other items from the same project — outdoor furniture, paving, bathroom fixtures or joinery. Consolidating saves freight cost and keeps delivery dates aligned.
  • Packaging specification. Ask how the shell is protected against cracking in transit and how equipment modules are separated from the cabinet panels.
  • Unloading provision. Who provides the crane, forklift or manual crew at destination.

Ask For the Documents a Project File Needs

Architects, builders and procurement teams need paperwork that a private buyer sometimes forgets to request. List these in your RFQ so they arrive with the quotation rather than three weeks later:

  • Confirmed dimensional and equipment layout drawing for your configuration
  • Electrical specification, including confirmed load, supply requirement and protection device guidance
  • Base and platform preparation notes, including load and levelling requirements
  • Start-up, commissioning and routine maintenance instructions in English
  • A spare-parts list with part references for pumps, jets, seals, lighting and the control panel
  • Warranty scope in writing: what is covered, for how long, on which components, and what voids it

We ask buyers to treat warranty wording as a document, not a sentence. The scope of coverage differs between shell, cabinet, pumps, controls and lighting, and that difference only matters when something fails in year three.

A Practical Comparison Step

Because this range includes several configurations close to 3880 mm in length, ask for a side-by-side comparison of the variants that fit your space. Comparing WS-115AⅢ-U against the variant in the same series that includes a swim training system, and against longer models in the swimming pools and swim spas range, makes the price gap explainable. A quotation that cannot be compared line by line is not a usable quotation.

If Your Space Is Irregular, Say So Early

Where the intended location has an awkward footprint — a curved terrace edge, a courtyard corner, a rooftop with a parapet — mention it in the first message. Our range includes customizable shape outdoor spa options in square, round, oval and curved designs, built on an acrylic shell with structural reinforcement. Raising this at RFQ stage means the supplier can quote a made-to-shape option instead of forcing a rectangular unit into a space that does not suit it.

A Checklist to Paste Into Your Next Request for Quote

  • Model and confirmed configuration: WS-115AⅢ-U, options listed line by line
  • Catalogue dimensions 3880 × 2200 × 1250 mm quoted back, plus a request for the confirmed drawing
  • Installation type: above-ground, semi-recessed or in-ground, with site photos
  • Available power supply: voltage, phase, circuit capacity, cable run length
  • Swim training system required or explicitly not required
  • Heat pump, insulation, UV sterilisation and filtration specified as separate priced lines
  • Incoterms, destination address and container plan, including any consolidated project goods
  • Unloading method at destination
  • Documents required: drawings, electrical specification, base preparation notes, spare-parts list, written warranty scope
  • Target on-site date and the trades that depend on it

Common Questions Buyers Ask at RFQ Stage

Is 11.85 kW the power figure I should size my circuit to?

Treat it as the catalogue figure for the configuration shown on the product page. The confirmed load depends on your selected equipment, especially the heating option, so request the electrical specification for your exact build before any circuit is sized.

Should I quote the spa alone or with the surrounding outdoor works?

Quote the spa alone first, then ask about consolidation. Decking, paving, steps and lighting are usually local trades, while furniture and matching water features can ship with the spa. Separating the two keeps responsibility clear.

What if my terrace cannot take a 3880 mm unit?

Send the usable dimensions and the access route rather than assuming a smaller standard model is the answer. Compact units in this range, and made-to-shape options, both exist — but only a quotation built on your measured space tells you which one fits.

Before You Send

A complete request for quote for Outdoor Swim Spa WS-115AⅢ-U answers five things: what is installed, where it is installed, how it is powered, how it arrives and what happens afterwards. Write those down, attach site photos and a dimensioned plan, and ask for every option as a separate line. Send your enquiry through our contact page with the model number in the subject line, and include whether the spa is part of a wider villa or hospitality package so the freight plan and delivery dates can be coordinated with the rest of the project.