A swim spa of this size usually arrives as a factory-built cabinet with its pumps, jets and controls already fitted, so the difference between a smooth handover and an expensive rework almost always sits in the finish details: what is actually inside the cabinet, how the shell and cladding are specified, and what the site has to provide. The Outdoor Swim Spa WS-115Aⅱ is a compact configurable model in our swimming pool and swim spa range, and the checklist below is the one we ask project buyers, contractors and villa owners to work through before an order is confirmed.
Start With the Configuration Sheet, Not the Brochure
WS-115Aⅱ belongs to a configurable range, which means two units carrying the same model code can be built quite differently. The catalog entry for this model lists overall dimensions of 3880 × 2200 × 1250 mm and shows water jets, LED lighting, ozone sanitation and a swim training system. Treat those as the reference configuration and then confirm line by line what your quotation includes.
| Item on the sheet | What to confirm in writing |
|---|---|
| Cabinet dimensions | Whether 3880 × 2200 × 1250 mm is the outer shell envelope or includes cladding and steps, since that changes your deck opening and clearance. |
| Jet count and layout | The number of jets shown for the configuration and their position relative to seating and the swim lane, so massage zones line up with how people will actually use the water. |
| Swim training system | Whether the swim unit is included in the quoted price, and what controller or speed adjustment comes with it. |
| Pumps and filtration | Water pump and filter pump quantities, plus whether sand filtration replaces or supplements the standard filter. |
| Total power | The rated total power for your configuration and the supply it assumes, which drives local electrical work. |
| Control system | Which control package is fitted and where the panel will sit relative to the cabinet and the plant room or access hatch. |
Optional accessories listed in the catalog for this range include additional control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs to be checked against the specific unit you are ordering rather than assumed from a brochure page.
Finish Details That Change the Price and the Timeline
Shell, cladding and colour
Acrylic shells in this range are supplied in standard colours; if a project requires a specific tone to match paving, decking or a hotel façade, ask for a physical sample before the order rather than relying on a screen image. The external cladding is what the neighbours and guests actually see, so confirm the material, the panel layout and how corners and access hatches are trimmed. Access panels should be planned around the pumps, filter and control system, not cut into the cladding later on site.
Insulation and heat pump
Insulation specification matters more than most buyers expect. It affects running cost, how quickly the water holds temperature overnight, and whether the cabinet can sit in a location with cold nights or strong wind. Confirm the insulation type and where it is applied, then match the heat pump capacity to the volume of water and the local climate. A unit ordered for a temperate coastal villa and one ordered for an inland site with frost will not want the same package.
Water treatment
Ozone sanitation appears in the reference configuration, and UV sterilization is offered as an option on this range. Confirm which treatment is included, what consumables need replacing and how often, and where the dosing or filtration equipment sits so maintenance can be done without draining anything.
Steps, seating and covers
Steps are listed as an option for some models in the range. Internal or external steps change both the usable water length and the footprint on the deck, so fix this decision before the plinth is poured. Where a cover is required for safety, heat retention or debris, confirm whether it is manual or automatic and what clearance it needs to stack.
Lighting and water features
The reference configuration shows LED lighting. Confirm fitting count, colour options and control method, and whether any waterfall or water column in the marketing image is part of your quotation. On some models in our range these features are standard, on others they are options or belong to a different variant.
Site Conditions to Settle Before Production Starts
- Structure and access. Confirm the finished weight with water in it, the bearing capacity of the slab, terrace or deck below, and the route the cabinet takes from the delivery vehicle to its final position.
- Electrical supply. Match the rated power of your configuration to the local supply, and have a qualified electrician handle connection and protection to the rules that apply at the site. We supply the equipment; the local installation must meet local requirements.
- Drainage and services. Plan for filling, draining, overflow and any plant room or ventilation needed around the cabinet.
- Tolerances. Agree who sets out and levels the base, and what flatness is required, before the unit ships.
A compact model such as WS-115Aⅱ works well where a full-length pool will not fit: a villa terrace, a rooftop deck, or a resort room with an outdoor plunge area. If the site needs a longer swim lane, deeper water or a different footprint, other models in our swimming pools and swim spas range cover larger dimensions, and shapes can be customized where the project calls for it.
How This Fits a Larger Fit-out Package
Swim spas are rarely ordered on their own. On villa and resort projects they arrive alongside outdoor furniture for villas and resorts, poolside paving, shading structures, lighting and the interior fixtures of the adjacent rooms. Coordinating those items with one supplier means one set of dimensions, one production window and one delivery plan, which is how we handle villa furniture and interior fit-out work. Our services cover design consultation and space planning, material selection and product specification, manufacturing with quality control, logistics and door-to-door delivery, then installation support and after-sales service.
Buyer Checklist Before You Sign the Order
- Configuration sheet signed off: dimensions envelope, jet count and layout, swim system, pumps, filtration, control package, total power.
- Options confirmed as included or excluded: heat pump, insulation, UV sterilization, sand filtration, steps, cover.
- Shell colour and cladding approved from a physical sample; access panel positions agreed.
- Local electrical supply, base tolerance, drainage and access route confirmed by the site team.
- Packaging, container loading, shipping terms and delivery address agreed in writing.
- Warranty scope, spare parts availability and the after-sales contact recorded on the purchase order.
Questions Buyers Ask Us Most
Can WS-115Aⅱ be built to a non-standard size or shape?
Our outdoor spa range supports customized shapes including square, round, oval and curved designs where the space requires them. Send the available footprint and the intended use, and we will confirm which base model suits it.
Are the catalog specifications fixed?
No. Dimensions, jet counts, lighting quantities and total power in the catalog describe a reference configuration. Your quotation is the controlling document, and we recommend asking for a marked-up specification sheet with your own project number on it.
Who installs the unit?
We ship the completed cabinet and provide installation support and after-sales service. Local connection of power, water and drainage should be carried out by qualified tradespeople working to the codes that apply at the site.
Send us the site drawings, a photograph of the intended location and your target completion date, and we will return a configuration sheet for Outdoor Swim Spa WS-115Aⅱ with the options priced separately, so you can compare configurations on cost rather than guesswork. Contact our team through the contact page to start that process.