French double doors set the tone for a villa entrance, a hotel suite threshold or a study that needs daylight without losing a sense of enclosure. For Australian buyers ordering them from an overseas manufacturer, the specification conversation is where most problems are either avoided or created. Below is the verification list we ask project teams to work through before a door order is placed, using our Classic French Double Doors as the running example.

Start With the Opening, Not the Door Style

A pair of doors that looks right on a mood board can fail on site for entirely dimensional reasons. Before comparing glazing bars or moulding profiles, confirm:

  • Finished floor levels at both sides of the opening, including any threshold, tile build-up or carpet inlay.
  • Structural head and jamb conditions, and whether the wall is masonry, timber frame or steel stud.
  • Clear opening width per leaf, swing direction, and the clearance the leaves need when they are fully open against a return wall or furniture.

Every SANTERSON door in this collection is made to measure, so dimensions come from your site survey rather than a stock size. We ask for surveyed openings and photographs of the reveal; if the local builder can supply setting-out drawings, even better. Where a survey and the on-site opening disagree, we stop and re-confirm before cutting anything.

Decide What the Door Has to Do Before You Decide How It Looks

The same mullioned silhouette behaves very differently depending on what sits behind it. State the duty clearly in your enquiry:

RequirementWhat to confirm with the supplier
Daylight and outlook between roomsGlazing type, internal or external glazing bars, sightline grid, and how the glass is cleaned and replaced.
Acoustic separation between suitesLeaf construction, seals, threshold detail and whether the frame is specified as an assembly with the leaf.
Privacy for a study or bedroomReeded, obscured or laminated glass options, plus lock prep and the furniture set supplied.
A pair that reads as one wall planeWhether the opening is better solved with flush hinged doors or concealed frames instead of a glazed pair.

Being explicit here prevents the most common disappointment: a decorative door delivered as a decorative door when the room needed an acoustic or privacy assembly.

Get the Material and Finish Schedule in Writing

"Classic French" describes a proportion language, not a build specification. Ask for the make-up of the leaf and frame item by item: core construction, face material, stain or paint system, edge detailing, and hardware prep. Our door range is configurable on exactly these points — substrate, finish and layout are specified per project, then confirmed with you before production.

For Australian interiors we suggest requesting a physical finish sample rather than judging from screen imagery. Timber movement across a long sea voyage and then into a conditioned house is the thing that shows up later, so seeing the actual sprayed or stained panel in your hand is worth the small delay.

Ask How Glazing Arrives and Who Installs It

Glazed leaves are the fragile part of the order. Confirm whether glass is shipped loose or glazed into the leaves, how each leaf is crated, and how the consignment is packed relative to other joinery on the same container. Our logistics service covers freight by sea, air or rail, packing and container loading, customs paperwork and door-to-door delivery, but import terms, duties and transit arrangements for Australia are settled case by case with the buyer's own agent where one is appointed.

Then fix the installation responsibility in writing: who fits the frames, who glazes, who hangs and adjusts the leaves, and who signs off the snags. We provide on-site installation support and after-sales service as part of project delivery; if your local builder is fitting the doors, we coordinate setting-out details and fixing methods with them before the frame arrives.

Do Not Order Doors in Isolation

Door problems on site are rarely door-only problems. They surface as a skirting that does not meet the frame, a wall panel that stops short of the jamb, or a floor transition sitting under the swing line. When joinery, wall panelling and flooring come from one supplier, those interfaces get resolved once in the drawing set instead of three times by email.

This is why buyers sourcing for villas and hospitality fit-outs group their doors with the rest of the package. If a project needs the door to disappear into the wall, Integrated Door & Paneling is designed as one system with the panelling. If the brief is contemporary rather than classic, compare the mullion proportion against Modern Slim Frame French Doors before committing to a heavier classic profile.

For the wider range, our Windows and Doors category covers hinged, sliding, pocket, folding and concealed options, and our Turnkey Interior Project Solutions explain how doors are coordinated with cabinetry, wall finishes and flooring under one contract.

A Pre-Order Checklist for Australian Buyers

  • Surveyed opening dimensions signed off by the person doing the fitting.
  • Written duty statement: daylight, acoustic, privacy or security.
  • Material and finish schedule with a physical sample approved.
  • Glass build-up and glazing method confirmed, not assumed.
  • Hardware set, lock prep and keying specified per leaf.
  • Crating and packing plan for glazed leaves, with a named consignee.
  • Incoterms, duties and delivery address agreed before production starts.
  • Installer named, with interface details issued to them in advance.
  • Approval drawings countersigned before the order enters production.
Compliance note: fire-rated, egress and accessibility requirements for doors in Australian buildings are set by the National Construction Code and are assessed by your certifier or builder. We supply made-to-measure joinery to an approved specification; we do not certify that a door satisfies a particular Australian code requirement, and any such claim should be verified with your project's certifier.

Bringing It Together

A French double door order goes well when the buyer treats it as an engineered assembly with a delivery chain, not as a finish selection. Send us your opening survey, the duty the doors must perform and the interface conditions around them, and we will return approval drawings and a specification you can hand to the builder.

SANTERSON has manufactured furniture and building materials since 2008 for villa, hospitality and office projects, including residential work in Sydney, Melbourne, Perth and Willoughby. Send your door schedule and drawings through our contact page for a written specification and quotation.