A swim spa is one of the heaviest line items on a villa or resort bill of materials, and it brings electrical, plumbing and structural decisions that have to be settled before the container is loaded. If you are specifying the Outdoor Swim Spa WS-PC07ST-L for a project outside China, the order only works when the shell, the plant and the site preparation arrive in the right sequence. The checklist below follows that order, stage by stage.

Start with the footprint, not the finish

The WS-PC07ST-L is listed in our catalogue at 7490 × 2400 × 1470 mm, which makes it a long-shell unit that has to be transported and craned onto a slab rather than carried through a doorway. Before you confirm the model, hand your structural engineer three numbers taken from the configuration you actually intend to buy: overall length and width for the pad and access route, water depth for the retaining design, and total connected power for the supply.

The catalogue record for this model shows a control system, a swim training system, a filter pump, six jets, four LED lights and a total connected power of 6.55 kW. Treat those figures as the baseline configuration rather than a finished specification; the water pump is not listed separately for this model in our published table. Options offered across the same range (heat pumps, water pumps, UV sterilisation, sand filtration, additional insulation and steps) change both the electrical load and the weight of each crate. Ask us to issue the weight list and the electrical schedule for your exact build, so the numbers on your drawings match the equipment that ships.

Practical rule: dimension the plant area against the selected control system and filtration option before the slab is poured. A shell that fits, with an access panel that cannot be opened for service, is one of the most common avoidable problems on installations like this.

Confirm the configuration in writing before production

Project orders go wrong when the purchase order names only a model code. Our Custom & OEM Service team works from a configuration sheet that should, at minimum, fix:

  • Shell dimensions, and the position of steps, seating and jets relative to your deck layout.
  • Water treatment: ozone is shown as a feature of this range, with UV sterilisation and sand filtration available as options. State clearly which one the order includes.
  • Heating choice (heat pump or another option) and insulation package, because these determine the supply size and the running-cost estimate your client will ask for.
  • The swim training unit arrangement, so the nozzle faces the swimming lane rather than the seating area.
  • Control system location: mounted on the cabinet or relocated into a nearby plant area, which sets the cable runs your electrician has to install.

If the site geometry does not suit a straight 7.5 m shell, we also produce Customizable Shape Outdoor Spa units in square, round, oval and curved formats with an acrylic shell and structural reinforcement, so the water feature can follow the terrace instead of the other way round.

Choose the freight mode against the site programme

A full swim spa assembly normally travels by sea because of its volume and weight; air freight makes sense for spare parts, replacement panels or smaller hydrotherapy units. Our Logistics & Door-to-Door Delivery service covers sea, air and rail forwarding, so the decision you need to make is how far we carry the shipment.

  • Port-to-port: you appoint a local agent for customs clearance, duties and inland transport. Choose this if your buyer already works with a forwarder on other trades.
  • Door-to-door: we arrange container loading, export paperwork, the ocean leg, import formalities and delivery to site or to your storage yard. One accountable party for the whole journey matters when the spa has to land in the same window as the deck and slab works.

Whichever option you pick, request the packing list, crate dimensions and gross weights before booking the crane: site crews plan lifting gear from those numbers, not from a brochure drawing. Cargo insurance is arranged case by case, so confirm the insured value on the commercial invoice instead of assuming it follows automatically.

Fix the import date before you place the order

Settle the delivery window first, then work backwards to the production start. The slab, the electrical sub-board and the water supply have to be finished and signed off before the spa is craned in; if the shipment arrives early, you are paying to store a 7.5 m shell on site.

Customs paperwork: what we prepare and what you file

We issue the export documents for every project order (commercial invoice, packing list and certificate of origin). What you or your clearing agent files depends on the destination country, and it is worth settling in the contract rather than at the port. Confirm with your importer before shipment:

  • The import classification and duty rate applied to a prefabricated spa pool in your country.
  • Whether an import permit or product registration is required for electrical equipment that will be permanently connected to the mains.
  • The voltage, phase and frequency of your supply, so the control system and pumps are configured for it at the factory instead of being converted on site.
  • Any local requirement for residual-current protection, bonding or a certified installer sign-off. Those rules come from the building authority in your area, so your electrician should confirm them before the spa is energised.

Site preparation while the unit is at sea

The transit window is the right time to finish work that does not depend on the equipment arriving:

  • Pour the slab to the load and level on your structural drawings, with an embedded conduit from the supply board to the control system location.
  • Run the dedicated circuit, bonding and isolation to the schedule for the confirmed total connected power.
  • Set out the drainage and overflow route, plus the water top-up connection.
  • Protect the deck edge and confirm the crane pick-up path; long shells need clear headroom over planting, pergolas and roof lines.

Unloading, commissioning and handover

On arrival, check every crate against the packing list before the crew leaves, photograph any damage on the crate itself and note it on the delivery receipt; that record is what an insurance claim relies on. Our Installation & After-sales Support covers on-site installation guidance, inspection and snags, spare parts and ongoing maintenance, so the team that built the unit can walk your contractor through filling, commissioning and water chemistry.

For handover we recommend one written record: the configuration sheet as built, control system settings, warranty terms for shell and plant, and a spare-parts list with our contact details. That file is what a facilities manager or a second homeowner will need two years later.

How the stages link together

On a villa project the sequence runs: configuration sheet agreed and purchase order signed; production of the selected shell and plant; crate drawings and weights issued to your site team; vessel booked with the import date fixed against your slab programme; clearance on arrival; crane set and installation; commissioning and handover pack. Each stage has one owner, which is why we run project orders through a single coordinator from design through to after-sales rather than passing you between departments.

Before you place the order

Can the WS-PC07ST-L be shortened for a tighter site? The catalogue dimensions are 7490 × 2400 × 1470 mm. Where that length does not suit, tell us the clear dimension you need and we will propose either a shorter shell from the same range or a customised shape.

What do I send to get an accurate landed-cost quotation? The configuration sheet, delivery address, chosen freight option (port-to-port or door-to-door) and your supply details: voltage, phase and frequency.

Who signs off the electrical connection? Your local licensed electrician, working to the requirements of the local authority. We provide the load schedule and wiring interface; we do not certify local compliance.

Send us the model code, your site dimensions and your delivery port, and our project team will return a configuration sheet, crate weights and a landed-cost option for the Outdoor Swim Spa WS-PC07ST-L. As a China-based furniture and building materials supplier operating since 2008, we supply swim spas alongside the rest of the villa package (outdoor furniture, bathroom ceramics, lighting, cabinetry and flooring), so one coordinator tracks every crate on your project.