A project order of glass hinged wardrobes is not one product to ship. It is a set of made-to-measure carcasses, glazed leaves, hardware and fixings that must arrive complete, undamaged and in the right sequence for installation. This guide walks through the decisions that shape international delivery for this category, from the drawing stage to handover.
Why glass hinged wardrobes need a different shipping plan
Our Glass Hinged Wardrobes are made to measure, with the finish, layout and dimensions specified per space. That is exactly what makes them awkward to move. Nothing on the pallet is interchangeable: a leaf sized for bedroom two cannot stand in for one that was damaged in transit, and a replacement has to be re-manufactured and re-shipped.
Three features drive the logistics plan:
- Glass leaves. Hinged doors carry glazing in frame, so they take the handling shock at the edge, where glass is weakest. They need vertical, edge-supported packing rather than flat stacking.
- Made-to-measure sizing. Panels are cut to the drawings. There is no standard spare part sitting in a warehouse.
- Project quantities. A villa or apartment package means several wardrobes across multiple rooms, which turns into a mixed container load that has to be unloaded room by room.
Lock the specification before anything is quoted for freight
Freight cost and packing method both follow from dimensions, so the drawings have to be frozen first. Confirm the opening widths and heights, ceiling level and skirting treatment, internal layout of hanging rails, shelves and drawers, glass type and colour, frame finish, and hinge handing for every unit.
This is also where our interior design services earn their place in the programme. Layout drawings, production coordination and site guidance come from the same set of documents, so the person packing the container and the person installing on site are working to the same numbers.
Practical rule: treat any late dimension change as a delivery risk, not just a design change. A revised width after production starts usually means re-making one leaf and holding the whole shipment while it is done.
Choose the packing standard with the buyer, not afterwards
For glazed joinery the packing conversation should happen before the order is placed. Agree in writing:
- Glazed leaves packed vertically on edge, fully restrained, with corner protection on the frame.
- Carcasses knocked down or assembled, whichever suits site access and labour on the receiving end.
- Hardware, hinges, handles and fixings bagged per unit and labelled with the same unit code as the panel drawing.
- Glass sizes marked on the outside of each crate so the unload team can sort by room without opening anything.
- A crate list that matches the packing list that will be presented to customs.
Decide how the order will travel
Most project wardrobe packages move by sea in shared or full containers, with consolidation across categories so wardrobes travel alongside the rest of the fit-out. Air freight is only sensible for small urgent items such as replacement hinges or a single late leaf, and rail sits between the two on some inland routes.
| Route | Works well for | Watch out for |
|---|---|---|
| Sea, consolidated | Full bedroom packages; wardrobes combined with furniture series items and other fit-out categories in one load | Longer transit; mixed loads need disciplined labelling so nothing is unloaded at the wrong stop |
| Sea, full container | Larger villa or multi-unit orders where volume fills a container on its own | Container size must be planned against crate dimensions, not nominal room counts |
| Air | Small urgent replacements and hardware | Cost rises steeply with glazed weight; glass still needs the same protection |
Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading planning, shipment tracking and customs documentation including commercial invoices, packing lists and certificates of origin. Confirm the import terms, duties and permit requirements for your own country with us and with your local broker before the order is placed; those rules differ by destination and change over time.
Agree the delivery scope in writing
The most common dispute on a project wardrobe order is not damage but a gap between what "delivered" meant. Settle these points on the purchase order:
- Delivery address and access. Apartment towers, upper-floor villas and tight site roads change what vehicle can deliver and whether crates can be carried in as packed.
- Incoterms and who pays what. Freight, insurance, duty and local transport should each have a named owner.
- Insurance on the glass. Glazed leaves are the item most likely to be claimed for; confirm coverage applies to the crates as packed.
- Inspection window. Crates should be opened, counted against the crate list and photographed while the delivery is still on site.
Sequence delivery against the site programme
Built-in wardrobes go in after wet trades, flooring and decoration are finished, but before loose furniture and final cleaning. Delivering early means crates sitting on a dusty floor for weeks; delivering late stops the joiner from fixing trims and delays everything behind it.
Where the wardrobes are part of a wider fit-out, one supplier coordinating cabinetry, flooring, lighting and interior fixtures categories keeps that sequencing in a single schedule instead of several. That is the practical reason project buyers group these lines under one-stop furniture and building materials procurement rather than buying each from a different vendor.
Plan installation and after-sales before the container leaves
Hinged glazed doors need alignment work on site: hinge adjustment, door gap setting and checking that frames are square in the opening. Decide who does it. If your own tradesperson is fitting, request fixing details and unit codes with the shipment. If installation support is required, arrange it while the order is still in production so the site visit lines up with arrival rather than chasing it afterwards. Our installation and after-sales support covers on-site fitting, inspection and snag lists, with spare parts and replacement handled case by case.
A pre-shipment checklist for the buyer
- Final signed drawings with a unit code per wardrobe, matching the crate labels.
- Confirmed glass type, colour and frame finish against an approved sample.
- Packing method agreed in writing, including how glazed leaves are restrained.
- Crate list, packing list and commercial invoice carrying identical descriptions.
- Named Incoterms, with insurance, duty and last-mile transport assigned.
- Delivery date tied to the joinery trade window on site, not to the production date.
- Agreed process for reporting damage with photographs inside the inspection window.
Bringing it together
International delivery of glass hinged wardrobes comes down to three habits: freeze the dimensions early, pack and label for a room-by-room unload, and put delivery scope and installation responsibility on the purchase order. Do that and a made-to-measure glazed wardrobe package crosses an ocean and lands ready to fit.
If you are specifying wardrobes as part of a villa or apartment package, send us the drawings and room list and we will confirm packing, consolidation and delivery options for your destination.