A metallic high gloss kitchen looks expensive when it is quoted cheaply on paper and then rebuilt on site. The finish that reads as a mirror in the showroom sample is the same finish that shows every misaligned door, every uneven light fitting and every rushed edge if the enquiry behind it was vague. What follows is the checklist we use when a buyer sends us drawings for metallic high gloss cabinets, and what you should expect to receive back.

Why this finish punishes a thin enquiry

High gloss is unforgiving in three specific ways. Reflection amplifies light, so a cabinet line that is 3 mm out of level catches the ceiling light differently from its neighbour. Colour depth means a metallic or champagne tone shifts noticeably between batches, which is why the exact panel you approved and the panel that arrives are not always the same panel. And gloss edges are visible from the front, so how a door is edged matters as much as the surface itself.

Our own catalogue states these products plainly: each item in the high gloss kitchen cabinet collection is made to measure, with material and finish options and a layout tailored to the project. That single line carries a lot of weight. "Made to measure" means somebody has to send real dimensions, not a typical layout from a plan book. If your request for quote does not carry that information, the supplier can only guess, and the difference between two quotations is often just the difference between two guesses.

The eight items a usable request for quote must contain

ItemWhat to sendWhy it changes the price
Project and siteCountry and city, project type (villa, apartment, hotel room, show flat), whether units are installed by your team or ours.Packaging, freight mode and handling for gloss panels differ from standard cabinetry.
DrawingsCabinet elevations with overall widths and heights, appliance schedule with model numbers, and the room's usable ceiling height.Made-to-measure carcasses cannot be priced from a plan sketch; appliance dimensions drive tall and integrated units.
Finish referenceA colour or finish name plus a physical sample or a photograph of the panel you want matched, and which surfaces are gloss and which are matte.Metallic tones need a defined reference before batch colour can be locked.
Door and carcass specificationDoor style (flat panel, handleless), core material and finish system you want quoted, carcass thickness and colour, edge treatment on visible doors.These are the layers of cost that look identical in a one-line description.
HardwareHinge and runner brand or grade you accept, whether soft close is required, handleless profile or handle, integrated lighting and where it switches.Hardware is usually quoted separately; leaving it out produces the lowest headline and the biggest variation order later.
Quantities and unit listA numbered schedule of every cabinet with width, height, depth and door or drawer configuration.Mix and match across a whole kitchen sets the price per linear metre far more than any single unit does.
Scope boundaryWhat you are supplying locally: worktop, sink and tap, appliances, tiling, plinth, trims.A quotation that quietly adds a worktop is not comparable with one that excludes it.
Delivery termsRequired site date, port or door address, preferred Incoterm, and who clears customs.Gloss doors need heavier crating and more careful container loading than flat-pack units.

The specification questions that decide the finish itself

Once the drawings are in place, four questions determine whether the kitchen you receive behaves like the sample. Ask each supplier to answer them in writing, and put their answers side by side rather than comparing only totals.

  • Which finish system is being quoted? Our high gloss range spans acrylic, lacquer, melamine, PVC and veneer door families, plus the dedicated high gloss collection. They are not interchangeable in feel or in cost, and a low quotation usually means a different family from the one you asked about.
  • How is the edge handled? Ask what the door edge will look like on a visible return, and request a photo of a finished door edge rather than a description.
  • How is colour consistency managed across the order? Metallic panels in a run should come from one batch. Confirm that doors, tall units and any later replacement parts are produced together or recorded against the same reference.
  • What is checked before packing? Ask for the pre-shipment inspection points on gloss surfaces, and whether you will see photographs of packed cartons with the unit numbers marked on them.

Reading the quotations side by side

Compare line items, not headline figures. A quotation that lists each cabinet with its dimensions, finish code, hardware and packaging note is telling you what will arrive; a quotation that offers one price per linear metre tells you only what it will cost if nothing changes. Then check three things before you sign.

First, whether the drawing attached to the quotation matches your latest architectural drawing, including ceiling height and any structural column. Second, whether the finish code in the quotation is the code on the sample you approved, not a similar tone from the same family. Third, whether the delivery term, packaging note and installation responsibility are written into the document rather than discussed on a call.

If you are coordinating several fit-out packages from one factory, ask for cabinetry, wardrobes and doors to be quoted against the same finish references. A kitchen in champagne metallic gloss next to a wardrobe in an off-reference cream is the kind of mismatch that only appears once daylight reaches the room.

Send drawings first, price second. A request for quote that carries site location, elevations with real dimensions, appliance schedule, finish reference, hardware grade, unit quantities, scope boundary and delivery address will come back comparable across suppliers. Without those eight items you are comparing assumptions.

What a complete response should look like

From us, an enquiry that arrives with drawings returns a cabinet schedule with dimensions and finish codes, hardware listed by item, packaging and loading notes, and the delivery term you asked for. If your drawings are not yet at that stage, our design team works from floor plans and reference images through layout planning, concept proposals and 3D visualisations before we lock production details, so the quotation is based on a drawing set rather than an estimate.

Where a project needs something outside the published range, bespoke finishes, textures and dimensions are part of the custom and OEM service, and freight is arranged from the factory through to the site address under the logistics and door-to-door delivery scope. Confirm the exact term, packaging and installation responsibility for your own project before you place an order; those details vary by destination and by package.

Questions buyers ask at this stage

Can I request a sample before committing to the full order?

Yes. Ask for a panel in the finish you are considering, and inspect it under the same lighting direction you will have on site. A metallic gloss viewed from above and a metallic gloss lit from the side read as different colours.

What if my room dimensions change after the quotation?

Send the revised drawing before production starts, not after. Made-to-measure carcasses are cut against the approved drawing, so a late wall movement becomes a variation order rather than an adjustment.

Should I quote wardrobes and doors with the kitchen?

If they share a finish family, yes. Quoting them together lets the factory manage batch colour across packages, which is what keeps a hallway wardrobe visually consistent with an adjacent kitchen run.