A mirror cabinet looks like a small line item on a bathroom schedule until it arrives on site and the frame will not clear the basin tap, the door swings into the towel rail, or the finish does not match the vanity doors beside it. Most of those problems are settled before anyone sends an enquiry. If you are specifying the Standard Mirror Cabinet for a villa, apartment or guest bathroom package, the notes below are exactly what our estimating team asks for on day one — send them with your first message and you will get a usable quotation instead of a round of questions.
Why the detail matters before the first email
Our mirror cabinets are made to order rather than picked off a shelf. For the Standard Mirror Cabinet, the product page lists three configurable points: made-to-measure sizing, material and finish options, and a layout tailored to the project. That flexibility is the reason the same cabinet works in a compact powder room and in a main family bathroom, but it also means an enquiry without dimensions, wall conditions and finish references cannot be priced accurately. A supplier cannot quote what has not been defined; they can only guess, and guesses get corrected on site at someone's expense.
1. Room set-out and the measurements that count
Send a simple dimensioned sketch or the architectural bathroom elevation. Numbers we need, in millimetres:
- The clear wall width available for the cabinet, plus the height from finished floor level to the ceiling or to any obstruction above.
- Finished floor level and finished wall finish — tile thickness changes a rough-in measurement into a face measurement.
- Centre line of the basin or vanity below, so the cabinet can be aligned rather than simply centred on the wall.
- Projection you can accept from the wall face, and whether the cabinet may sit above the mirror line of the basin tap.
- Position of downlights, exhaust fans, cornices and window reveals that interrupt the mounting surface.
Where the cabinet shares a wall with a vanity, tell us which vanity you are running. A Santerson Floating Vanity and a floor-standing unit put the mirror at different heights, and we will set the cabinet accordingly.
2. Layout, storage and door direction
State what has to live inside the cabinet: tall bottles, medicine items that need a shelf out of children's reach, hair tools that need a socket nearby, or mostly spare stock. That answer drives shelf count, adjustable versus fixed shelving, and whether a mirrored inner panel is worth the extra cost.
Then tell us which way the door should open, and why — hinge side relative to the basin, the shower screen or the entry door. If the bathroom is tight enough that a hinged door fouls something, say so in the enquiry; it is cheaper to change the layout on paper than to swap a cabinet after production.
If one size does not suit every room, we can vary the specification across the schedule. A Santerson Tall Mirror Cabinet often works better in a main bathroom where storage is short, while a Santerson Round Mirror Cabinet suits a small guest powder room where a rectangular frame crowds the wall.
3. Finish, glass and hardware references
Finish mismatch is the most common avoidable complaint. Give us the reference you are matching: cabinet door sample code from your joinery package, paint name and code, laminate or veneer brand, or a photo of the vanity and wall tiles already selected. Where the mirror cabinet has to disappear into a wall panel, say so — we can match the carcass to the surrounding panelling rather than defaulting to white.
Decide now whether you want clear glass, tinted or frosted glazing on any display section, and whether the front is fully mirrored or part mirrored with a framed border. Hardware preference — handleless edge pull, integrated profile handle, knob — should be stated with the finish (brushed nickel, matte black, brass) so it is not substituted later.
4. Electrical and lighting decisions
A Standard Mirror Cabinet is normally a non-powered unit, but if you want illumination we need that decided before the carcass is built, because it affects the wiring route, the switch position and the driver location.
| Decision | What to send us |
|---|---|
| Powered or unpowered | Confirm per room; a project can mix both. |
| If powered | Local supply voltage, whether the driver sits inside the cabinet or in an accessible ceiling void, and switch location. |
| Colour temperature | Warm, neutral or cool white, matched to the vanity lighting already on your lighting schedule. |
| Demist pad | Whether required, and confirmation that a supply has been run for it. |
| Alternatives | If every mirror position needs light, review the Santerson LED Mirror Cabinet as a line-item option. |
Electrical work is carried out by your local licensed tradesperson. We confirm the cabinet's wiring and mounting requirements for each selected configuration; your electrician confirms the installation against the rules that apply at the site. Do not assume a specification from another country or another project carries over.
5. Quantities, room schedule and phasing
Send the count per type and per room, not one lump figure. A typical enquiry reads: six standard mirror cabinets across three bathroom types in two villa typologies, two tall cabinets, one round cabinet. Add your installation sequence — which apartment or floor is being fitted out first — so production can be released in the order you need it rather than in the order that suits the factory.
6. Site conditions and fixing method
Tell us what the cabinet is being fixed to: stud wall with nogginings already installed, tiled masonry, or a timber frame behind wet-area membrane. If the substrate is not yet set, we will send the fixing layout and blocking requirements with the shop drawing so your builder prepares the wall before tiling. This single item prevents more call-backs than any other.
7. Delivery terms and after-sales handling
State the delivery address or addresses, whether goods go to a depot or straight to site, and your preferred freight mode. Our logistics and door-to-door delivery service covers sea, air and rail freight with customs paperwork handled on our side; you confirm the receiving party and the access conditions at the point of delivery. Mirror-fronted units are packed for transit, but site storage is your control — tell us if there is no dry storage, and we will adjust the packing grade.
For after-sales, agree in advance how a damaged or missing item is reported: photographs of the packaging and the item, the room reference from the schedule, and the quantity affected. Claims handled with that information are resolved far faster than claims raised verbally months later.
A short checklist to paste into your enquiry
Common questions before an enquiry
Can one project mix several cabinet styles?
Yes. Configurations are set per room, so a project commonly runs standard cabinets in the bedrooms' bathrooms and a tall or round unit elsewhere.
Do you supply only the cabinet, or the whole bathroom package?
We are a one-stop furniture and building materials supplier, so mirror cabinets can be ordered alongside vanities, ceramics, shower systems, lighting, cabinetry and finishes on one scope. Grouping them is what keeps the finishes consistent across the job.
What if I do not have drawings yet?
Send photographs and rough tape measurements of each wall with the tap and tile lines marked. We can work from that to produce a first layout for your confirmation before anything enters production.