A concealed door that disappears into a paneled wall looks simple on a rendering. It fails on site for predictable reasons: the opening size arrives late, the finish is ordered twice, and nobody has decided who owns the frame, the leaf and the surrounding panels. This guide sets out the line items a buyer should put in front of the factory before an integrated door and paneling package is quoted, so that one supplier answers for the whole wall.

What "Integrated Door & Paneling" Actually Covers

In a project specification the phrase covers three things that are usually split across separate trades: the door leaf and its hardware, the frame or lining that carries the leaf, and the wall panels that run continuously past the opening. In our catalogue these sit together in the Custom Partitions & Paneling collection alongside wall panel systems, wood panel partitions and custom niche paneling. The flush door lines — handleless concealed doors, decorative concealed doors and flush wall aligned doors — are specified the same way.

Every one of these items is made to measure. The published configuration for each product lists made-to-measure sizing, material and finish options, and a layout tailored to the project; nothing in this group ships from a fixed size list. That single fact drives everything below: the specification has to be complete enough that we can cut panels without guessing.

Six Line Items to Fix Before You Request a Quotation

Line itemWhat to state in the documentWhy it changes the price or the schedule
Opening and leaf geometryClear opening width and height, finished floor level, leaf size, thickness and swing direction for every door on the schedulePanels are cut around the leaf. A late dimension re-cuts the whole run, not one panel.
Wall build-up at the openingSubstrate type, wall thickness, whether the frame is site-built or supplied, and the reveal you expectDetermines the lining detail and whether the door sits proud or truly flush.
Panel material and finishBoard substrate, surface treatment (veneer, lacquer, matte or high gloss), colour reference and grain directionLeaf and panels must come from the same batch to match under site lighting.
Edge and joint detailShadow gap or no gap, corner treatment, expansion allowance on long runsDecides whether the door reads as part of the wall once closed.
Hardware setHinge type and load rating, closer or magnetic catch, handle or push-open detail, lock or latchA concealed leaf needs hardware rated for its weight; substitutions are not cosmetic.
Quantities by room or floorA door schedule with a tag per opening, tied to the panel run it belongs toPrevents two suppliers producing the same wall twice.

Write the finish once, not three times

A common specification error is describing the door finish in the door section, the panel finish in the finishes schedule, and the joinery finish in a third document. When those three descriptions are written independently they drift — one says "oak veneer", another says "natural oak", a third gives a colour code from a different range. State the finish once, with a physical sample reference and its batch note, and point every line item to it.

Do not let the site contractor build the frame by default

When the lining is left to a local trade, the panel supplier ends up matching a frame that was never drawn. If you want one party accountable for the flush result, include the frame or lining in the same package and say so explicitly in the enquiry.

How a Made-to-Measure Package Moves From Drawing to Site

For custom partitions, paneling and integrated doors from SANTERSON, the sequence we work to follows the same stages as our wider turnkey solutions for villa, hospitality and office projects:

  • Brief and drawings. Send the room drawings, the door schedule and your finish references. Space planning and layout support sit with our interior design services, so a project that only has concept images can still start here.
  • Specification confirmation. We return the panel breakdown, opening details and selected hardware for your sign-off. Nothing is cut before this step.
  • Production and quality control. Panels, leaves and linings for one wall are produced together so grain and sheen match.
  • Packaging and delivery. Freight by sea, air or rail with the customs paperwork handled under our logistics and door-to-door delivery service; panels are packed so edges arrive undamaged.
  • Installation and handover. On-site fitting, snag inspection and the follow-up covered by our installation and after-sales support.

Where a project needs non-standard details — an unusual reveal, a specific surface texture, or components matched to joinery already on site — the custom and OEM service covers bespoke finishes and made-to-order dimensions rather than catalogue substitutions.

Note on scope: the product pages for this collection describe configurable sizing, materials and finishes but do not publish fixed dimensions or technical data sheets. Treat every measurement, hardware selection and finish reference in your specification as something to confirm with us in writing before production is released.

A Short Specification Template You Can Copy

Item tag: DP-01 (Level 02, master ensuite corridor)
Opening: clear width ___ mm x height ___ mm; FFL datum ___
Leaf: size ___ x ___ x ___ mm; swing direction; flush with finished wall face
Frame/lining: supplied by SANTERSON / site-built (delete one)
Panels: substrate ___; surface ___; colour/sample ref ___; grain direction ___
Joint: shadow gap ___ mm at leaf edge; square corners
Hardware: concealed hinges rated ___ kg; push-open detail; no visible handle
Related runs: panel run to left and right of opening, same batch as leaf face
Quantity: ___ off; delivery address and Incoterms: ___

Fill one block per opening and your enquiry becomes directly quotable. It also gives the site team a single reference per door when panels arrive.

Three Problems This Specification Prevents

  • Finish mismatch between leaf and wall. Same board, different batch, visibly different under LED lighting. Fix: one batch reference for the whole wall.
  • Door sits proud of the panel line. The lining was built to a nominal thickness that does not match the panel build-up. Fix: state the wall build-up and who supplies the lining.
  • Panels re-cut on site. An opening changed after production started. Fix: freeze the door schedule before release, and record every tag against its run.

Send us your door schedule

If you have drawings and a room list for integrated doors, wall paneling or partitions, send them over with your finish references. We will return the panel breakdown, hardware selection and quotation for the whole wall package, then handle production, delivery and installation support.