A decorative concealed door is one of the easiest items in a joinery package to misquote, because the visible part of the product is only half of what you are buying. The leaf, the frame and the way the panel meets the wall finish all have to be agreed before production starts, or the door arrives as an expensive disagreement on site. If you are specifying Santerson Decorative Concealed Doors for a villa, apartment or hospitality fit-out, the request for quote you send determines how accurate the price is and how many rounds of clarification it takes to get there. The list below covers what a manufacturer needs from you, why each item matters, and what you should expect back.
Start with the opening, not the door
Concealed doors are made to measure, so the quotation is only as good as the dimensions you supply. Send the finished-opening size rather than the structural opening, and say plainly which one you have measured. A concealed leaf sits inside a frame that is built into the wall build-up, so the wall thickness and the make-up of the wall both matter.
- Opening width and height, plus the wall thickness the frame has to pass through.
- Wall construction: masonry, stud partition, plasterboard, or a panelling system the door is being set into.
- Whether the opening is already formed or still to be built to your drawing. If it is still open, state which trade is responsible for forming it.
- Floor finish level at the threshold, and whether you want a door sill, a flush threshold or no sill at all.
- Ceiling height and any reveal or shadow gap you expect above the leaf.
Where a project has several doors of the same type, attach a door schedule instead of describing each one in prose. A schedule with a number for every opening, a mark on the plan, and the size against each line removes most of the back-and-forth.
Say how invisible you want the door to be
"Concealed" covers a range of outcomes, and the price differs across them. In your enquiry, state which result you are after so the manufacturer can quote the right build rather than guessing.
| Outcome you want | What to state in the RFQ |
|---|---|
| Panel and wall read as one surface | The wall finish on both sides, the panel material you expect the leaf to take, and whether the reveal line is acceptable or should be minimised. |
| No visible handle | That a handleless concealed door is required, and how the leaf is to be opened and closed in that room. |
| Door line kept but aligned with the wall face | A flush wall aligned door instead, with the alignment tolerance you will accept on site. |
| Sliding rather than hinged | The operating direction, where the leaf pockets to, and the depth available for the pocket. |
This is also where you confirm which collection you are quoting. A concealed door in the Flush / Concealed Doors range and a hinged or sliding flush interior door are different products with different frame details, and mixing them up on an enquiry produces a quotation you cannot compare against your drawings.
Specify finishes against the surrounding surface
A decorative concealed door succeeds or fails at the joint between leaf and wall. Give the manufacturer something concrete to match, not an adjective.
- Finish system for the leaf: paint colour and sheen, lacquer, laminate, veneer or a wall-panel material that continues across the door.
- Where the same finish is used on panelling, name the panel product so the door and the panels are produced to the same specification. Santerson's integrated door and panelling work is specified this way.
- Which side of the door faces which room, since a corridor side and a bedroom side can take different finishes.
- Sample requirements: whether you need a finish sample before production and where it should be sent.
Material and finish options are configurable on these doors, so treat the finish as an open decision in your enquiry rather than something to settle after order. Ask for the available options to be listed with the quotation, and note any that carry a different price.
Cover hardware and operation explicitly
Hardware is where concealed-door quotations most often come back incomplete. List what you expect to be included, and ask the supplier to state clearly what is not.
- Hinges: quantity, load rating for the leaf size, and whether they should be concealed.
- Closing action: soft close, spring return or free swing.
- Opening method where no handle is used, and any required door bottom or sweep detail.
- Lock case, privacy set or plain latch for each opening, matched to the room.
- Ironmongering you intend to supply yourself, so it is excluded from the price rather than assumed.
If a fire rating, acoustic separation or accessibility requirement applies to an opening, say so in the RFQ and ask for confirmation that the quoted build addresses it. Do not assume a decorative concealed door covers a performance requirement simply because it looks correct on the drawing.
Give the commercial and delivery context
A quotation for one sample door and a quotation for a whole apartment floor are prepared differently, and freight changes the number materially. Include:
- Quantities per opening type, and whether the order is a trial batch or the full package.
- Project location and delivery address, and the Incoterm you want priced, for example FOB, CIF or door-to-door.
- Required site-delivery date and any phasing, such as one floor ahead of the rest.
- Packaging expectations, including protection for finished faces on site storage.
- Who handles customs clearance and import formalities at destination.
Santerson describes logistics support covering freight forwarding by sea, air and rail, packaging and container loading, shipment tracking and door-to-door delivery. Ask for the shipping plan in writing with the quotation, and confirm duties, insurance and transit arrangements for your specific destination rather than relying on general service descriptions.
Attach the documents that make the price firm
The more of the following you attach, the closer the first number will be to the final one:
- Door schedule with sizes, quantities and room marks.
- Wall sections through the opening, showing the finished wall build-up on both faces.
- Interior elevations of the rooms where the doors appear, so the finish continuity is visible.
- Finish schedule or sample references used elsewhere in the project.
- Reference photographs if a similar detail has already been built and you want it repeated.
Where the wall build-up is still being decided, say that in the enquiry. A manufacturer who knows the detail is open will flag the frame implication instead of quoting to a dimension that later changes.
What a good response should contain
Before you compare quotations, check that each one answers the questions below. A quotation missing these items is not comparable with one that includes them.
| Item | Why it matters |
|---|---|
| Price per opening type, with quantities | Lets you compare suppliers line by line instead of on a single total. |
| Frame and wall build-up assumption | Shows what the price was based on when your wall detail changes. |
| Hardware list with makes or specifications | Prevents substitutions after order. |
| Finish specification and sample plan | Fixes the appearance before production starts. |
| Production period and shipping option | Feeds your programme rather than an assumed lead time. |
| Exclusions stated in writing | Reveals who supplies installation, ironmongering and making good. |
| Installation and after-sales terms | Santerson lists on-site installation, inspection and snagging, warranty coverage, spare parts and maintenance support; get the applicable terms for your project confirmed in writing before order. |
Before you send: confirm every dimension against site or drawing, name the wall finish on both faces, state quantities and delivery location, and ask for exclusions to be listed. Those four points settle most of the risk in a concealed-door quotation.
Ordering through a one-stop supplier
Concealed doors rarely stand alone. They sit against panelling, next to wardrobes and under the same paint or veneer schedule as the rest of the joinery. When the door is ordered together with the surrounding panelling and finishes from one manufacturer, the finish specification is written once and applied across the package, which reduces the risk of a door that matches the sample but not the wall.
SANTERSON has operated since 2008 as a China-based manufacturer and supplier of furniture and building materials for villa, hospitality and office projects, with custom and OEM work, logistics support and installation covered under one workflow. Send your door schedule and elevations to the project team, and the quotation will be prepared against the same specification used for the rest of the joinery package.