A single wardrobe wall rarely arrives as one item. It arrives as carcasses, doors, drawers, shelving inserts, lighting channels and trim, each with its own specification, finish and delivery slot. That is why buyers who move from catalogue wardrobes to Combination Modular Wardrobes usually end up sourcing them as an OEM package rather than ordering a standard size off the shelf. The process below is the one to expect, stage by stage, along with what you are responsible for supplying at each point.
What OEM changes about wardrobe procurement
With stock wardrobes you choose from what a factory already produced: fixed heights and widths, a shortlist of door panels, and an interior layout designed to suit most rooms. With OEM production the direction reverses. Your dimensions, your finish schedule and your interior split become the manufacturing brief, and the factory builds to that brief.
For combination modular wardrobes the difference matters more than it does for a single hinged unit. A combination run mixes module types — closed cabinets, open display sections, drawer-focused units, hanging rails, glass-fronted segments — inside one continuous elevation. Every module has to share the same carcass depth, the same door reveal, the same handle detail and the same batch of finish material, or the finished wall reads as assembled rather than designed.
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008. Its custom and OEM service covers furniture design and prototyping, bespoke finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation such as engraving, embossing and logos. Wardrobe work sits inside that service line alongside the rest of the interior package.
Stage 1: The brief you send before anyone can quote
The usefulness of a quotation depends on how much usable information arrives with the enquiry. Before contacting a supplier, collect:
- Elevations or measured drawings for each room, including ceiling height, skirting, cornices, out-of-plumb walls and any services doors must clear.
- The module mix per wall — how much hanging space, how many drawers, how much open display, and whether any section is glass-fronted.
- Door operation for each run: hinged, sliding, pocket or open. Sliding runs need track and clearance allowances that hinged runs do not.
- A finish schedule naming the surfaces to compare, such as lacquer, acrylic, melamine, veneer or a glass-fronted aluminium frame.
- Quantity by room type, plus whether the same specification repeats across units, floors or buildings.
If the project also needs kitchen cabinetry, vanities, interior doors or wall panelling from the same supplier, say so at this stage. Coordinating one set of drawings against one production schedule is a different exercise from coordinating four separate orders that must match each other on site.
Stage 2: Design and prototyping
This is where an OEM wardrobe supplier earns the order or loses it. The supplier's design team converts your elevations into production drawings: carcass construction, module widths, door sizes, edge treatment, hardware positions and integrated lighting routes. What you should get back are drawings you can check against the site, not a rendering.
Three items are worth settling during this stage rather than leaving for later:
- Module proportions across the whole elevation. A run that mixes closed and open modules needs a consistent vertical rhythm, or the joints read as errors.
- Finish continuity between module types. The veneer on a door, the laminate inside a carcass and the edge detail are separate materials. Approve them together, under the lighting conditions of the rooms where they will be installed.
- Interior fittings per module. Soft-close drawer boxes, trouser slides, jewellery trays, shoe shelves and rail heights are specified now, or they become site modifications later.
Request a prototype when a finish, door profile or hardware detail has not been produced before. A sample door or a short sample section tells you more about colour, sheen and edge quality than any specification sheet.
Stage 3: Quotation, and the details that belong in writing
Compare quotations on scope, not on headline price. Two quotes for the same elevation can differ widely simply because one includes integrated lighting, drawer boxes, glass panels and spare doors while the other lists them as extras. Before confirming an order, make sure the paperwork records:
- Confirmed dimensions per module, with tolerances for on-site walls.
- The exact material and finish reference for every visible surface.
- Hardware specification, plus load ratings where drawers and rails carry weight.
- Packaging method and the structure of the packing list, so crates can be matched to rooms on delivery day.
- Which items are spares, which are site-cut trims, and who supplies each.
The product page for these wardrobes lists made-to-measure sizing, material and finish options and a layout tailored to the project, and asks that dimensions and selected specifications be confirmed for each project. Treat that confirmation as a formal sign-off in your own programme: once panels are cut, an OEM run cannot be redirected cheaply.
On minimum order quantities
Flexible minimum order quantities mean a single villa's wardrobe wall can be produced as an OEM package. On multi-unit residential or hospitality work, grouping identical room types into one production batch is the practical way to hold cost and finish consistency together.
Stage 4: Production and quality control
Once drawings and the finish schedule are signed off, the order enters manufacturing with checks at panel, assembly and packing stages. On a combination run the checks that matter most are rarely reported unless you ask for them: batch matching of panels across modules, squareness of carcasses that will sit side by side, door alignment allowances, and whether hardware arrives pre-fitted or loose for site fitting.
Ask for photographs of finished sections before packing, and confirm which items are inspected against the approved sample. That request costs nothing in the factory and a great deal once containers have shipped.
Stage 5: Logistics, delivery and handover
SANTERSON arranges freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery through its logistics service. Wardrobe components are heavy, awkward and easily damaged at the corners, so the packing specification agreed in stage 3 is what protects the finish approved in stage 2.
On arrival, check crates against the room-based packing list before the installation crew starts. Then work through the fitting sequence with the supplier's on-site team: installation, inspection and snag lists, followed by warranty coverage, spare parts and maintenance cover. Response times, warranty terms and installer availability vary by destination, so confirm those specifics for your own country in writing instead of assuming a published service description applies unchanged.
A checklist to take into supplier conversations
- Send measured elevations and a module mix with the first enquiry, not after the quotation arrives.
- Approve finishes as physical samples under real room lighting before sign-off.
- Ask for production drawings you can check against site conditions, then confirm dimensions formally.
- Compare quotes on included scope: lighting, drawer boxes, glass, spares and trims.
- Inspect finished sections in the factory before packing.
- Match crates to rooms using a room-based packing list at delivery.
If your project needs wardrobes built to your dimensions and finish schedule, send your elevations and module requirements to the SANTERSON team. Wardrobe production can be handled alongside the surrounding fit-out — interior fixtures, flooring, wall panelling, lighting and interior doors — so one supplier carries the coordination for the whole interior rather than four.