Flat panel European cabinets look simple, and that is exactly where the risk lies. With no moulding, no raised profile and often no visible handle to hide behind, every dimension, edge and finish decision shows up in the finished kitchen. For builders, renovators and project buyers ordering cabinetry from overseas, the questions worth asking before production starts are far more specific than "what colour do you want?" Below is the sequence we work through with clients on Flat Panel European Cabinets and the rest of our Modern European Kitchen Cabinet collection, and the list you should be able to tick off before your order goes into manufacturing.
1. Confirm the site dimensions twice, and confirm what is finished
Made-to-measure sizing only helps if the measurements are right and taken at the correct stage. Before we draw anything, we need the following settled:
- Floor, wall and ceiling finishes in the kitchen area are complete to their final levels, so cabinet heights and clearances are measured off real surfaces rather than a screed.
- Locations of waste, water supply, gas and electrical outlets are marked on site and reflected in the drawings, because tall units and appliance housings are cut around them.
- Squareness and level are recorded. Where walls are out of true, the drawing should show scribing and filler panels rather than assume the unit will absorb the deviation.
- Appliance models are fixed before carcass sizes are locked, including oven, cooktop, dishwasher, fridge and any integrated units, so ventilation gaps and door swings match the actual products.
Our product pages state made-to-measure sizing, material and finish options and a layout tailored to the project, and they also say plainly that dimensions and selected specifications must be confirmed for each project. That confirmation step is not paperwork for its own sake; it is the point at which an expensive rework becomes a drawing correction.
2. Fix the door style, and then fix it properly
"Flat panel" covers several different details, and two drawings that both say flat panel can look different once installed. Decide on:
- Panel construction and edge detail. Whether the door is a single slab or a panel on a frame, and how the edge is finished, matters most on pale and mid-tone colours where a line of light along an imperfect edge is obvious.
- Opening method. Our minimalist kitchen cabinet range uses flat panels with hidden handles or touch-to-open systems. A handleless run needs a different clearance plan at worktops, tall units and corners than a run with profiled pulls, so this choice has to be made before the layout is finalised.
- Grain direction. Where a wood-effect or veneer door is specified, the direction of the grain on doors, drawer fronts and panels should be marked on the elevation drawing. Mismatched grain direction across a run is one of the most common sources of dispute on flat front kitchens.
3. Specify the finish by name, not by photograph
A reference image is a starting point, not a specification. Before production we ask clients to confirm:
- The surface sheen they expect. A matte European door and a high gloss lacquer door in the same colour read completely differently under kitchen lighting, and samples look different again under warm and cool light.
- Whether the doors, panels and any matching tall units are ordered from the same batch of material, so colour and texture match across the whole run.
- The finish's behaviour in the actual room. Gloss surfaces show fingerprints and reflections; deep matte colours show dust and grease marks along a cooking wall. This is a maintenance decision as much as an aesthetic one.
Ask for a sample door, not a colour chip
A small chip cannot show you an edge detail, a grain direction or how a large flat surface behaves under your lighting. A sample in the specified construction lets you check all three before the order is placed.
4. Lock the internal layout and the hardware schedule
The interior is where a kitchen either works or does not, and it is invisible in the renders everyone signs off. Confirm:
- Cabinet widths and drawer positions against how you actually cook, including a tall larder or pantry unit, deep base drawers rather than shelves where reach is poor, and dedicated housing for the appliances already chosen.
- The hardware set: hinges, drawer slide rails, support legs and connecting brackets. Our built-in kitchen cabinet work is supplied with matching hardware, so the schedule should be agreed at order stage rather than sourced locally later, when a substitute may not match the loading rating or the soft-close behaviour you specified.
- Soft-close fittings on doors and drawers, and where they are needed most: tall units, deep pantries and any door that stays open while hands are full.
For apartment and hotel work, this is also the stage at which you decide how much variation to allow. Repeat layouts across units keep pricing and installation predictable; where a design calls for more character, projects such as our Arched Niche & Full House Custom Wall Cabinet Project show how cabinetry can carry the architecture of a room instead of sitting inside it.
5. Agree the delivery, storage and installation sequence
Custom cabinetry arriving on site is not the end of the process; it is where most avoidable damage begins. Before shipping we confirm:
- Packaging and container loading suited to large flat fronts, which are the parts most likely to be chipped in transit.
- A dry, level storage area at the destination, with doors and panels kept flat and unopened until fitting begins.
- Which trades are on site before installation, since cabinetry should follow final floor, wall and electrical completion and precede worktops and splashbacks.
- How the run will be inspected and signed off, including door alignment and drawer operation, so any adjustment is caught while the fitter is still present.
Our project services cover custom and OEM work, logistics with door-to-door delivery, and installation and after-sales support, which means the same supplier carries the order from drawing through to fitting rather than handing it over at the port.
Pre-production checklist
- Site re-measured after finishes, with outlets and services marked
- Appliance models fixed; ventilation gaps shown on drawings
- Door construction, edge detail and opening method specified
- Grain direction marked on elevations where applicable
- Finish confirmed by name and sheen, with a sample door approved
- Internal layout and full hardware schedule agreed at order stage
- Storage conditions and installation sequence planned for the site
- Sign-off criteria agreed before fitting begins
Questions to settle with your supplier
Can a flat panel door be made in any colour?
Colour options vary by panel material and surface process, so treat the finish list as part of the specification rather than an assumption. Send the colour reference early and ask which substrate and surface it is available on.
What happens if my walls are not straight?
The drawing should account for it. Scribing and filler panels in the matching door material give a clean line; leaving the unit to bridge the gap leaves a visible shadow line that no amount of silicone fixes.
Should tall units be ordered as one piece or built up on site?
It depends on access at the property and on how the run is joined. Confirm stair, lift and doorway dimensions before ordering full-height units, and ask for a joint detail where two sections meet.
SANTERSON is a China-based furniture and building materials manufacturer supplying custom cabinetry and interior fixtures for villa, hotel and apartment projects. Send us your elevations, appliance list and finish references and we will return a specification with the details above confirmed before production begins — contact our team to start.