A lacquered-cabinet quotation is only as reliable as the information behind it. Send your supplier made-to-measure dimensions, door and carcass details, hardware, a colour reference and project context, and the number you receive will match what actually arrives on site.
Buyers who compare high gloss lacquer cabinets across suppliers often find the prices are not comparable at all. One quotation covers a full set with hardware, delivery and installation support. The next covers bare boxes in an export carton, with everything else billed later. The gap is rarely about the lacquer itself; it is about what each supplier was told before they priced.
The checklist below follows the order our estimating and production team works through on made-to-measure kitchen and built-in joinery packages. Send these items with your first enquiry and you will receive a quotation you can compare line by line, with far fewer surprises at the detail-confirmation stage.
1. Room dimensions and the layout drawing
Made-to-measure cabinetry is priced from drawings, not from a room name. A sketch with overall wall lengths, ceiling height and the position of fixed elements is enough to begin. Mark these clearly:
- Wall lengths, corners, alcoves, and any known uneven floors or out-of-plumb walls
- Window sills, radiators, pipework, flues and switch positions that limit cabinet depth or height
- Appliance schedule with model numbers or cut-out dimensions for built-in ovens, hobs, dishwashers, fridges and wine coolers
- Working heights you want for worktops and tall units, plus the worktop material and thickness you plan to use
- Whether the run continues into a pantry, laundry, media wall or wardrobe in the same package
If you have architectural drawings or a designer's elevation set, send them as PDF. If you do not, say so at the start — our interior design service covers space layout planning and 3D visual renderings, so we can develop the elevations with you before anything is cut.
2. Door style, panel construction and edge detail
"High gloss" describes a surface, not a door. Two doors with the same sheen can price very differently depending on what sits under the lacquer. Specify:
- Door style: flat slab, handleless profile, or a routed shaker lacquer cabinet frame with a lacquered centre panel
- Panel substrate and thickness, and whether the reverse side should match the front or take a standard light finish
- Edge treatment on visible edges, including any radius required on slab doors for a softer edge
- Colour reference: a Pantone or RAL code, a sample you can post, or a swatch number from our lacquer kitchen range
- Whether the scheme mixes finishes, for example gloss uppers against matte lacquer cabinets on the base run
3. Carcass, drawer boxes and interior fittings
The doors drive the look; the carcass and interiors drive the price. State your preference for each item, or ask us to quote two options so you can compare:
| Item | What to specify |
|---|---|
| Carcass material and thickness | Board type, thickness, edge colour, and whether the carcass finish matches the doors or stays neutral |
| Doors versus drawers on the base run | Drawer counts per unit, drawer depths, and load expectations for pans and small appliances |
| Hinges and slides | Brand or grade, soft-close requirement, opening angle, and integrated handleless mechanisms where used |
| Interior organisation | Pull-out larder trays, cutlery inserts, corner solutions, bin housings, spice racks, shelf pin spacing |
| Integrated lighting | Cabinet and plinth lighting, sensor or switch control, driver location, and where transformers stay accessible for service |
| Toekick, plinth and scribes | Recessed or flush plinth, scribing to uneven walls, and floor finish build-up height |
Our custom built-in kitchen cabinets are supplied with matching hinges, drawer slide rails, support legs and connecting brackets, so tell us which items you want quoted inside the set rather than sourced locally.
4. Project type, quantities and delivery address
A single villa kitchen and a repeat-unit apartment or hotel fit-out are estimated differently. Include:
- Project type and stage: private residence, villa development, serviced apartment or hospitality fit-out
- Quantity of identical or near-identical sets, and whether units repeat across floors or blocks
- Delivery address, port of entry, and the Incoterms you want quoted (ex works, FOB, CIF or delivered to site)
- Target on-site date and any phasing, so production can run in batches instead of one delivery
- Local requirements you must confirm with your own authority or certifier — building regulations, electrical and gas rules, and any local certification the project demands
Logistics changes the number materially. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Routing and duties still depend on your destination and current rates, so name the delivery point early and landed cost appears in the quotation instead of arriving later as an invoice.
5. Installation and after-sales expectations
Say who is fitting the cabinetry: your own installer, the main contractor, or us. Sets can be supplied flat-packed for a local fitter, or assembled into larger modules with fixing drawings and on-site guidance. For projects we also handle inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance under installation and after-sales support. Ask for the exact warranty terms, response times and exclusions in writing for your project before you confirm the order.
A quick pre-enquiry checklist
- Dimensions or drawings with appliances and obstructions marked
- Door style, panel thickness and edge detail
- Colour reference by code, sample or photographed swatch
- Carcass, drawer and hardware specification, or two options to compare
- Interior fittings and integrated lighting list
- Quantities, project type, phasing and target dates
- Delivery address, Incoterms and who installs
- Related joinery in the same package: wardrobes, media walls, pantries, vanities
What a usable quotation should contain
Before comparing prices, check that each quotation states unit-by-unit pricing with elevations attached; the board and lacquer specification; hardware brand and model; what is included in packaging and freight; lead time from approved samples to shipment; payment terms and milestone stages; and what is excluded. If a supplier cannot attach a drawing set to their price, the comparison is guesswork.
The same discipline protects you on the finishing side. Lacquered doors show handling marks in transit more readily than laminates do, so ask how doors are protected, whether spare panels are included for site adjustments, and how a damaged door is replaced after arrival.
Extend one lacquer scheme across the joinery package
Where gloss lacquer is specified in the kitchen, it usually returns in bedroom storage and media walls. Buying that joinery from the same factory keeps colour batches, edge profiles and hardware consistent, and consolidates freight into one shipment. Our high gloss lacquer wardrobes follow the same made-to-measure sizing and finish approach as the kitchen range, with layouts tailored to each room.
Send your drawings for a comparable quotation
Email your layout, door style and colour reference to santerson@qq.com, or contact us on WhatsApp at +86-13928214007 (PHILLIP). We reply with elevations and a unit-by-unit quotation you can check against any other supplier's.
Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).