A request for quote either speeds up a freestanding cabinet project or stalls it. Because these cabinets are made to order, an enquiry that only names a style and a quantity usually comes back as a question rather than a price. The checklist below covers what a buyer should send so that the quotation is accurate the first time.
Why Freestanding Cabinets Need a Different Brief Than Built-In Joinery
A freestanding cabinet arrives as a finished unit and sits on the floor against a wall, so it does not depend on site-built carcasses, scribes or reveals. That makes delivery simpler, but it also changes what has to be agreed before production starts: overall height, width and depth have to work in the room as they are, and the finish and internal layout have to be chosen from the outset.
Santerson's freestanding ranges are configurable rather than fixed. The Santerson Freestanding Cabinets in the Storage Units collection are listed with made-to-measure sizing and a choice of material and finish, for residential bathroom projects. The Santerson Freestanding Cabinet in the Display Cabinets collection follows the same approach for living spaces, with finish, layout and dimensions specified per project. Because both are configured to order, the details you supply in the enquiry become the production specification.
1. Room, Project Type and Quantity
State whether the cabinets are for a single villa, an apartment building, a hotel floor or an office fit-out, and give the quantity per room type. A buyer ordering twelve bathroom storage units for one villa and a buyer ordering forty identical display cabinets for a serviced-apartment project need different pricing, packing and shipping arrangements, even when the design is the same.
2. Dimensions, and Which Ones Are Fixed
Send the maximum height, width and depth the unit may occupy, plus the clearances that matter on site: door swings, radiator or pipework projections, skirting boards, and any recess the cabinet must sit inside. Say plainly which dimension cannot be exceeded and which can flex. If a vanity, basin, appliance or television has to fit into or on top of the unit, give that item's model and dimensions in the same message, because it affects internal framing and worktop preparation.
3. Materials and Finish
Name the substrate, the surface and the colour reference you want. Santerson's Custom & OEM service covers bespoke finishes and textures alongside material choices such as wood, metals, engineered stone and laminates, so an enquiry can specify a board type and a surface treatment rather than accepting whatever is standard. If you are matching existing joinery, attach a photograph of the reference and the manufacturer's colour code; if you need a physical sample before ordering, say so in the first message.
4. Internal Layout and Hardware
Describe how the cabinet will be used, then translate that into compartments: hanging rail or shelves, drawers versus open storage, deep or shallow shelf depths, adjustable versus fixed shelving, and whether any section needs to hold heavy items. Glass-fronted doors, soft-close hinges, drawer runners, integrated lighting and a lock all change the price, so list them as options you want quoted rather than assuming they are included. For an illuminated display unit, the lighting type, transformer position and switching arrangement should be stated in the enquiry.
5. Drawings, Photos or Nothing at All
A dimensioned sketch, a floor plan or a site photograph each help, in that order of usefulness. If you have no drawing, say so and state the room dimensions instead; Santerson's interior design service covers space layout planning, furniture layouts and 3D visual renderings, so an enquiry with only a rough idea can still move forward rather than being returned unanswered.
6. Delivery Terms and Destination
Give the delivery city, whether the site is a private residence or a restricted commercial address, and the Incoterms you want priced. Freight by sea, air or rail, customs paperwork, packaging and container loading are handled as part of the supplier's logistics service, but the quotation cannot be finalised without the destination and the terms you expect. For Australian projects, note this explicitly so that the freight method and the packing specification are quoted for that route.
7. Timeline and Site Sequence
State when the cabinets must arrive, not when you would like them. Note what other trades the delivery has to follow or precede, since a freestanding unit should normally land after wet trades and floor finishes are complete but before final handover. If part of the order is needed earlier than the rest, list those items separately.
8. What to Ask the Supplier to Confirm Back
A useful quotation does more than give a number. Ask for confirmation of the final dimensions, material and finish references, hardware schedule, packaging and crate count, delivery terms, and what is covered by warranty and after-sales support. Installation and snagging can be arranged as part of the project scope, so ask whether installation at the destination is included or quoted separately.
| Item in the enquiry | Why it changes the quote |
|---|---|
| Project type and quantity per room type | Sets pricing tier, packing plan and whether items ship together |
| Maximum external dimensions and fixed clearances | Determines carcass size, crate size and freight volume |
| Basin, appliance or television to be fitted | Affects internal framing, cut-outs and worktop preparation |
| Substrate, surface and colour reference | Bespoke finishes are priced differently from standard stock finishes |
| Shelves, drawers, glass, lighting, locks | Each is an option that moves the price; rarely included by default |
| Delivery city and Incoterms | Freight method and packaging specification depend on the route |
| Required arrival date and site sequence | Affects production slot and whether part-shipment is needed |
Related Ranges Worth Quoting Together
Where a project needs more than storage, the same configuration approach applies across related ranges. Santerson Freestanding TV Cabinets are specified with made-to-measure sizing and project-tailored layouts for living spaces, and an illuminated display cabinet in the same Display Cabinets collection adds a lighting specification to the enquiry. Listing these items in one request lets them be quoted with matching finishes and shipped together.
A Common Cause of Price Changes After the Quote
Most revisions on freestanding cabinet orders come from three omissions: an assumed internal layout that was never written down, a finish described in words rather than by reference, and a delivery address supplied only after production. Sending those three items at the start is the fastest way to hold a price.
Next Step
Send the room details, dimension limits, finish reference and delivery destination in one message, and ask for the quotation to restate each of them. That single step turns an enquiry about freestanding cabinets into a production-ready specification.
Santerson manufactures custom furniture and building materials and supports projects from design and production through door-to-door delivery, installation and after-sales support.
Send your room dimensions, finish reference and delivery destination to receive a project quotation: Contact Us.