A swim spa of this size is not a catalogue item you simply drop into a drawing. It is a structural, hydraulic and electrical package that has to be coordinated with the surrounding building work long before production starts. The checklist below covers what we need from your side to quote Outdoor Swim Spa WS-130AⅢ-U correctly, and what you should expect us to confirm back.

Start With the Fixed Shell Dimensions

The catalog lists this model at 8000 × 3000 × 1400 mm. Those three numbers drive most of the early decisions, so treat them as the starting point rather than the final answer.

  • Length and width set the footprint. Send us the clear internal dimensions of the room, terrace, rooftop deck or garden area concerned, not just the overall site size, and tell us which sides need to stay accessible for maintenance and for people entering the water.
  • Depth of 1400 mm determines how much of the shell sits below finished floor level if you want a flush installation. Send the finished floor levels around the opening so we can see whether the spa is fully recessed, partially recessed or surface mounted.
  • Access route is often overlooked. A unit of this length has to travel from the delivery vehicle to its final position. Confirm door widths, lift sizes, stair or crane access, and any overhead obstruction along that route.

Confirm the Equipment Package Before Quoting Power

The specifications shown on the site for this configuration are one control system, four water pumps, one filter pump, 23 jets in total and five LED lights, with a total power figure of 11.85 kW. Read that as the published baseline, not as your order. Equipment counts change between configurations, and they change again when options are added, so we confirm the exact package line by line on the quotation.

This matters when you compare models. The closely related Outdoor Swim Spa WS-130AⅢ shares the same catalog dimensions but shows a different equipment set on its product page, including a swim training system. If lap swimming is the priority, say so at the enquiry stage; if hydrotherapy jets and seating are the priority, the specification conversation goes in a different direction.

ItemShown for WS-130AⅢ-U
Catalog dimensions8000 × 3000 × 1400 mm
Control system1 set
Water pump4 pcs
Filter pump1 pc
Jet total23 pcs
LED lights5
Total power11.85 kW
Features shownWater jets, LED lighting, Ozone

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm what can be combined with your configuration before production.

Send Us the Site Conditions

The inputs below are the ones that most often cause rework on site when they are left out of the first enquiry.

  • Installation type: indoor or outdoor, recessed, semi-recessed or above ground, and whether the surrounding finish is tile, stone, timber decking or a prefabricated deck.
  • Structure: slab thickness and reinforcement around the opening, plus the bearing capacity if the spa sits on an upper floor, rooftop or terrace. Involve your structural engineer early; we work to the loads they set.
  • Drainage and waterproofing: location of the drain, overflow route, and who is responsible for tanking the pit. This is usually local contractor scope, and it needs to be agreed in writing.
  • Electrical supply: voltage, phase and frequency at the site, the distance from the distribution board to the plant room, and who provides the dedicated circuit and protection. An 11.85 kW baseline package is not a small appliance connection, so your electrician needs the confirmed figures from our quotation, not the catalogue.
  • Plant room or equipment space: where the pumps, filtration and control system will sit, with enough clearance for servicing.
  • Water heating and heat source: whether you want a heat pump, what the local inlet water temperature is, and whether the spa is used year round or seasonally. Insulation needs follow from that answer.
  • Water supply and treatment: mains connection, whether ozone is sufficient for your usage pattern, and whether UV sterilization is wanted as an addition.

Project Inputs That Shape the Quote

Beyond measurements, these details decide how the unit is packaged, shipped and priced:

  • Quantity and schedule: one villa unit, or a repeated type across hotel villas, resort cabins or apartments. Repeated units let us standardise the specification and the spares list.
  • Delivery terms: destination port or site address, and whether you want door-to-door delivery handled for you. We arrange sea, air and rail freight with the customs paperwork, packaging and container loading planned around the unit.
  • Who installs: our on-site installation support or your local contractor. Either way we provide the setting-out drawings and technical guidance so the opening, services and finishes are built to the right dimensions the first time.
  • After-sales scope: which wear parts and spares you want shipped with the unit, and who carries out routine maintenance after handover.

If the Room Does Not Fit an 8 m Shell

Send us the same measurements for the space you have and we will look at alternatives in the same range. Shorter configurations such as Outdoor Swim Spa WS-125AⅢ-U are listed at 5500 × 2300 × 1350 mm, which suits tighter rooms; check each product page for the equipment counts, as they differ between configurations. Where the space is irregular instead of simply short, our customizable shape outdoor spa covers square, round, oval and curved layouts in an acrylic shell.

Putting It All in One Enquiry

A site plan with clear dimensions and finished floor levels, the access route from the delivery point, the electrical supply details, the equipment options you want, and the project type, quantity and destination. Send those together and we can turn them into a line-by-line quotation instead of another round of questions.

Send your drawings and site data to SANTERSON. We are a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, and we handle swim spa production alongside the rest of the package so you are coordinating one supplier instead of several.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiries about our swimming pool and swim spa range can be sent at any time; the contact page states business hours of Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), and that enquiries receive a response within 24 hours.