A media wall that mixes open niches with closed cabinets looks simple on a drawing and fails on site for predictable reasons: the screen size was never fixed, the open shelf spans were never checked against the load, or the door fronts arrived in a finish that does not match the rest of the joinery. Our Santerson Open & Closed Combo Units are made to measure for each project, which means every one of those decisions has to be closed out before the panels enter production. The checklist below is the sequence we work through with buyers, designers and contractors so that the unit you approve on paper is the unit that lands in the living room.
1. Fix the media wall's role before you fix its dimensions
Two rooms can hold the same wall length and need completely different units. A family living room usually needs closed storage for games, consoles and clutter, plus a clear sightline to the screen from the seating. A villa guest lounge leans towards display: books, ceramics, lighting in the niches, and fewer doors. A hospitality or serviced-apartment programme often reverses that again, hiding almost everything behind fronts and keeping only one shallow open shelf for a styled object.
Write down what has to be hidden, what should stay visible, and who uses the unit daily. That single sentence drives the open-to-closed ratio far more reliably than a mood board, and it is the first thing we need from you before we draw anything.
2. Confirm the screen, the devices and the cable route
The screen is the hard dimension in the composition. Give us the display size and model, or at least the exact width and height plus the mount type, before we set the niche. Wall-mounted screens need a recess or a solid backing to carry the bracket; a stand-mounted screen needs a shelf depth that actually takes the base. Set-top boxes, soundbars, routers and game consoles each need their own space and their own ventilation, and none of them should sit inside a fully sealed cabinet unless you have accepted how the remote control will behave through a door.
- Screen size, weight and mounting method, with the mount position marked on the site drawing.
- Every device that lives in or behind the unit, with its dimensions.
- Where power, HDMI, network and antenna lines land, and how many sockets are required inside the closed section.
- Whether lighting is part of the design. If it is, we treat it as an electrical detail on the shop drawing — driver location, cable route, switching and any dimming requirement — not as something to sort out after installation. See our Santerson Integrated LED Media Units for that configuration.
3. Set the open-to-closed split, and check what the open shelves must carry
Open sections read as light and generous on a rendering, but each unsupported span has limits once books and stone objects go on it. Tell us what you intend to store in the open niches — a row of hardbacks is not the same load as a decorative vase — and we will set shelf depth, spacing and the need for intermediate supports or a thicker edge accordingly. Long spans that run past the practical limit are one of the most common reasons a design has to be redrawn late.
For the closed sections, decide the interior layout before the fronts: hanging versus stacking, drawers versus shelves, and whether anything tall such as a vacuum or linen has to fit. If the media wall is only part of a wider storage scheme, our Santerson Storage & Display Combo in the Media & TV Walls collection and our Santerson Mixed Open & Closed Storage show how the same logic carries across a full-height wall.
4. Choose fronts, materials and finishes as one decision
Doors and drawer fronts are where a made-to-measure unit either blends into the joinery package or stands out as an expensive mismatch. Confirm the door type — hinged, sliding, handleless push, or a profile pull — and then confirm the finish against the samples you have approved elsewhere in the project, because a wood grain seen on a screen does not translate reliably to a large flat surface. We work to the material families already used across our built-in furniture: melamine, lacquer, acrylic, wood veneer and aluminium-framed glass fronts, so a media unit can be brought into line with the wardrobes and cabinetry around it.
5. Close out site conditions that decide how it installs
A wall unit is only as good as the wall it goes onto. Before we finalise the shop drawing, we ask for the finished floor level, the ceiling level, and the actual — not designed — wall length, because plasterboard thickness and floor finishes move those numbers by more than people expect. Skirting lines, architraves, radiators, switches, air grilles and structural columns all need marking on the survey. Floor-to-ceiling units also need to know whether the ceiling can take a fixing and whether a shadow gap or a scribe is preferred at the top.
| Item to confirm | Why it must be settled before production |
|---|---|
| Overall width, height and depth, taken from a site survey of finished levels | Made-to-measure panels cannot be trimmed on site without exposing the finish |
| Screen model, size and mount position | Sets the niche opening, backing support and cable drop |
| Device list with dimensions and ventilation needs | Determines which sections stay open or get vented |
| Power, data and TV point locations | Holes are cut in the factory, not drilled on site |
| Lighting specification and control method | Drivers, wiring and switching are built into the panels |
| Open shelf spans and intended loads | Sets shelf thickness, depth and intermediate supports |
| Front material, colour reference and hardware | Fixes the match with surrounding joinery and the order for hinges and runners |
| Delivery address, access route and lift or stair dimensions | Panels are packed to size; a narrow stair changes how the unit is broken up |
6. Agree the approval and delivery sequence
Our workflow for these units follows the same steps as the rest of our built-in furniture: brief and layout proposal, then a shop drawing with dimensions, finishes and cut-outs for your sign-off, then production, packing and shipment. Because everything is made to order, the signed drawing is the contract for what gets built — changes after that point are re-work, not adjustments.
On delivery we handle freight and door-to-door logistics, and installation with snag inspection can be arranged as part of the package. Tell us early which parts you want to carry out locally so responsibility is clear before the container is booked rather than after it arrives.