A swim spa on a hotel terrace or in a villa garden has to work two ways at once: it is an amenity guests photograph and use daily, and it is a piece of building equipment that must be delivered, set on a prepared base, wired and commissioned alongside everything else on site. The Outdoor Swim Spa WS-130CⅢ-U sits in the longer end of our configurable outdoor swim and hydrotherapy range, which is exactly where most hospitality and villa buyers get their specification wrong. The steps below follow how we actually quote and deliver these units on project work.
Start with the site envelope, not the water features
Dimensions for this model are listed as 11830 × 3000 × 1430 mm. That length is the decision that drives everything else. A hull approaching twelve metres needs an unobstructed route from the delivery vehicle to its final position, and it needs a base that carries the full footprint rather than four corner pads.
Before you lock the model, ask your civil or structural team for three drawings: the terrace, deck or garden area at 1:50; the access route from the street or loading bay; and the plant room or electrical riser nearest the position. Then check them against the unit length plus a clear working margin at both ends for levelling, pipework and future pump access. Where that margin cannot be found, a shorter hull in the same family is the better answer — the range also covers smaller footprints such as 8000 × 3000 × 1400 mm and 9950 × 3000 × 1430 mm, so the jet package and control layout can stay consistent while the length comes down.
The overall height of 1430 mm governs how the unit reads from a parapet, a deck edge or a pool fence line, and it also affects the freeboard you need if the spa is set into a raised platform. Send your architect the section, not just the plan.
Read the specification as a package, then confirm what is included
The product page lists the following for this model:
Outdoor Swim Spa WS-130CⅢ-U — specifications shown on the site
Model: WS-130CⅢ-U
Dimensions: 11830 × 3000 × 1430 mm
Control system: 1 set
Water pump: 4 pcs
Filter pump: 1 pc
Jet total: 23 pcs
LED lights: 5
Total power: 11.85 kW
Features shown: water jets, LED lighting, ozone
Those figures come from the catalogue specification for this model, and they are also the reason we ask buyers to confirm the included equipment and the electrical requirements for the selected configuration in writing before an order is placed. Two points regularly cause rework on site:
- Electrical load. A total power figure of 11.85 kW on the product page is not the same thing as a supply design. Your electrical contractor needs the confirmed configuration, the cable route and the protection device sized to what will actually be shipped — and if a heat pump or extra pumps are added later, that load moves with them.
- Feature set. Swim training systems, sterilisation options and pump counts differ between models in this family. Specify against the exact model number on the quotation, not against a photograph from the range.
Match the jet and lighting layout to how the amenity will be used
Twenty-three jets distributed along the seating and lounging zones do most of the work, while the swim end stays clear for laps and aqua-based programming. For a hotel or resort this is where you decide whether the spa is primarily a fitness facility with a hydrotherapy corner, or a spa treatment extension that happens to have a swim channel. Villa projects usually make the opposite choice, and it changes which jet positions matter.
The five LED fittings are part of the evening experience as much as the daytime one — poolside bars, night-time garden use and low-light wayfinding all depend on them. Confirm the control system layout so your operations team can run lighting, jets and filtration on schedules rather than by hand.
Ozone is listed among the features shown for this model. Treat water treatment as an operating-cost conversation with your facilities manager: what is included in the unit, what is dosed separately, and who maintains it after handover.
Decide early whether you need a standard hull or a custom shape
Straight-line hulls solve most briefs. Where architecture demands otherwise — a curved terrace edge, an atrium void, a spa court that wraps a column — our customizable shape outdoor spa is specified to square, round, oval and curved layouts on an acrylic shell with structural reinforcement. For a flagship hospitality feature we also supply purpose-built units such as the luxury outdoor swim spa with massage jets, LED and water features, built around an acrylic interior and reinforced cabinet.
Custom geometry lengthens production and coordination time, so it should be a decision taken at concept stage, not in value engineering.
Treat options as part of the procurement, not as extras later
Options listed on the product page for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model.
Insulation and a heat pump are the two items buyers most often leave out and then add on site. On an exposed roof terrace, or wherever the water has to hold its temperature overnight, both belong in the base quotation because they change the power design and the plant space. Steps change the deck level. Add them to the specification while the drawings are still moving.
Pre-order checklist
- Confirmed model number on the quotation, matched line by line to the specification sheet
- Included equipment and options listed explicitly: pumps, jets, lighting, ozone, sterilisation, insulation, steps
- Confirmed electrical load, supply arrangement and protection for the shipped configuration
- Base, drainage and access route signed off by the site team against the confirmed hull dimensions
- Delivery terms, container loading and door-to-door scope agreed in writing
- Commissioning, snag list and after-sales responsibilities named before handover
How a one-stop supplier changes the coordination load
A swim spa rarely arrives alone on a project of this type. In the same package we are usually supplying outdoor furniture for the surrounding terrace, wall and ceiling finishes, lighting and interior fixtures, which means one production schedule, one set of packing lists and one logistics chain rather than five. As a China-based furniture and building materials manufacturer we work this way on villa, hospitality and office projects, covering custom/OEM service, freight forwarding and door-to-door delivery, installation support and after-sales cover under the same team. For buyers comparing packages rather than single products, our turnkey solutions page sets out how those stages connect.
Send us the location drawings and the target configuration for WS-130CⅢ-U, and we will confirm dimensions, included equipment, power requirements and a delivery plan against your programme before you commit to the model.
Talk to us about your project
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Head office and factory: Longjiang, Shunde, Foshan 528318, China
Enquiry page: Contact SANTERSON
Product dimensions, equipment counts and power figures above are transcribed from the catalogue data for this model. Please confirm the included equipment, options and electrical requirements for your selected configuration before ordering.