A mirrored hinged wardrobe looks simple on a quotation: doors, mirrors, carcass. The differences between two similar-looking proposals usually sit in the hardware, the mirror fixing method and the way dimensions were confirmed. This guide sets out what procurement teams should actually compare when they source mirrored hinged wardrobes for villa, apartment and hospitality projects.

Start With the Opening, Not the Wardrobe

Hinged-door wardrobes swing into the room, so the clearance in front of the doors matters as much as the internal layout. Before you request a price, confirm three measurements on site: the finished floor level, the true ceiling height at several points along the wall, and the distance to the nearest fixed obstruction such as a bed frame, door opening or radiator. On older villas and renovation work in Sydney and Melbourne, walls are rarely square and floor levels can vary across a single run, which is exactly where made-to-measure joinery earns its cost.

Ask the supplier what they do when site dimensions and drawing dimensions disagree. A manufacturer that produces to confirmed site measurements will re-confirm openings before cutting; one that works only from architectural drawings may ship a carcass that no longer fits after the plaster and flooring are finished.

Compare the Mirror Specification Line by Line

Mirror quality is where two quotations at similar prices diverge most. In your specification, ask for the following to be stated explicitly rather than left as "mirrored door".

Specification pointWhat to ask forWhy it matters
Mirror thickness and backingThickness, backing coat type, whether safety film is appliedThin, poorly backed mirror dulls quickly and is more prone to edge damage in transit
Edge treatmentPolished, ground or bevelled edges; whether edges are protected on installationBurnished edges resist chipping better than raw cut edges on a door that opens daily
Fixing methodBonded to the panel, mechanically fixed, or recessed into a frameAffects how the mirror sits in the reveal and how a damaged panel is replaced later
Panel construction behind the mirrorSubstrate type and thickness, moisture resistance where the wardrobe backs onto a bathroom wallCarcass movement transmits straight to the mirror; an unstable substrate shows as distortion at the edges
Finish range for the frameLacquer, veneer, melamine or solid timber options in the colour you specifiedThe frame finish has to match other joinery in the same project, so confirm it comes from the same production line

If your project needs a mirror that reads as part of a wider joinery package rather than an accessory bolted on, look for a supplier whose wardrobe range covers several door families in one collection. Flat Panel Hinged Wardrobes and the shaker panel wardrobe, for example, let a project keep the same door language in rooms where a full-length mirror is not wanted.

Check What the Internal Layout Actually Includes

Standard quotation traps appear inside the carcass. Compare each proposal on these items:

  • Hanging rail heights and whether a second rail or pull-down rail is quoted
  • Drawer count, drawer runner type and whether soft close is included or an extra line item
  • Shelf spans: long unsupported shelves sag, so confirm shelf thickness and support spacing
  • Lighting provisions: whether wiring, transformer and switch points are pre-cut or left to the site electrician
  • End panels and plinths: these are often excluded from an introductory price and added later
  • Corner returns and angled ends, which need a separate detail drawing before production

A practical test: ask for the internal layout as a dimensioned elevation for each wardrobe, with every component itemised. If a supplier cannot produce one quickly, they are likely pricing from a generic module rather than your room.

Hinges and Hardware Are a Specification, Not an Accessory

On a mirrored door the hinge carries both the panel weight and the mirror weight, so it is worth naming the hardware in the order rather than accepting "quality hinges". Confirm hinge type and load rating, whether soft close is fitted on every door, the number of hinges per door height, and how the handle or push mechanism interacts with the mirror edge. Also ask what happens if a hinge fails out of warranty years later: standard, replaceable hardware keeps a project serviceable; proprietary hardware can leave you searching for a supplier.

Ask How One Supplier Handles the Rest of the Fit-Out

Wardrobes rarely sit alone in a project. Skirting, interior doors, vanities, lighting and engineered wood flooring all meet the joinery line, and each interface is a coordination risk when different vendors supply each element. That is why many buyers group these items with one furniture and building materials supplier who can hold consistent material references across the package.

SANTERSON describes itself as a China-based manufacturer and one-stop supplier covering design coordination, custom and OEM production, door-to-door logistics, installation support and after-sales service. Its wardrobe range spans hinged, sliding, corner, walk-in, modular and open configurations, alongside interior doors, bathroom fixtures, lighting and flooring that meet the same joinery. For buyers comparing proposals, ask which of those services are included in your quotation and which are optional.

Documentation to request before you place the order

  • Confirmed site measurements, signed off by the person who took them
  • Dimensioned elevations for every wardrobe, with component list
  • Written mirror and hardware specification, including brand or grade where named
  • Finish samples matched to your colour schedule, referenced by code
  • Packing and container loading plan, with the method used to protect mirrored panels in transit
  • A clear statement of what is excluded: end panels, plinths, lighting, installation labour, spare hardware

Packaging and Transit Deserve the Same Scrutiny as the Product

Mirrored panels are the most fragile item in a joinery shipment. Ask how mirrors are crated, whether they travel edge-up or flat, what corner protection is used, and how breakages are documented on arrival. Then confirm in writing who bears replacement cost for transit damage and how quickly replacement panels are produced. Getting this settled before shipment avoids an argument with the freight forwarder after the container is already on site.

A Short Comparison Scorecard

Score each supplier from one to five on: accuracy of site-measured dimensions; transparency of the mirror and hardware specification; completeness of the internal layout quotation; consistency of finishes with the rest of your joinery package; clarity of packing, transit and replacement terms. Two proposals at the same price usually differ by two or three points on this list, and those points are what determine whether installation goes smoothly.

Send us your wardrobe schedule

Share your room dimensions, door style preference and finish schedule, and our team will confirm the mirror specification, hardware and internal layout for your project before quoting. Enquiries are answered within 24 hours during business hours, Monday to Saturday (GMT+8).

Contact: PHILLIP · Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com

View Mirrored Hinged Wardrobes  |  Products

Specifications, finishes and dimensions are confirmed per project. Confirm the final mirror grade, hardware model and measurements with our team before production.