Open wardrobes with glass detailing sit in an awkward place on a project schedule. They are not off-the-shelf joinery, but they are also not something most site teams want to fabricate on the day. If you are specifying them for a villa bedroom, a serviced apartment or a boutique hotel fit-out, OEM sourcing is usually the route that keeps the glass, the frame and the internal layout under one supplier. Below is how that process actually runs, stage by stage, and what you need to have ready before a factory can quote it.
What OEM sourcing means for this product group
In an OEM arrangement the manufacturer builds to your drawings and your finish schedule rather than selling you a fixed catalogue item. For Glass Open Wardrobes, that matters because the product is defined by three variables at once: made-to-measure sizing, material and finish options, and a layout tailored to each space. A standard wardrobe depth will not suit every bedroom wall, and an open glass system shows its internals, so shelf heights, hanging zones and lighting provision all have to be settled before production starts.
SANTERSON is a China-based furniture and building materials manufacturer that also supplies built-in furniture, alongside loose furniture, wall and ceiling finishes, flooring, doors, lighting and sanitary fixtures. Sourcing the wardrobes inside that same package is where most project buyers see the practical benefit: one specification file, one production queue, one shipment.
The OEM workflow, step by step
- Project brief and space data. Send room dimensions, wall elevations, floor-to-ceiling heights and the drawings you already have. For an open wardrobe the surrounding finishes matter as much as the unit itself, so include the wall build-up and the flooring detail.
- Layout and specification review. The supplier works from your layout intent: hanging lengths, shelf bays, drawer banks, glass type and frame profile. Where a drawing is incomplete, expect queries back rather than assumptions.
- Material and finish selection. Boards, veneers, laminates, glass tints and metal frames are confirmed against samples or your own approved schedule. Open systems show their internals, so review finishes in the same light conditions the room will have.
- Quotation and detail confirmation. Pricing follows the confirmed specification, not a rough concept. Anything left open at this point becomes a variation later.
- Production and quality control. The units enter the factory queue with your drawings as the controlling document. If other joinery is on the same project, it can run in parallel under the same finish schedule.
- Logistics, installation and handover. Packing, container loading and freight coordination are handled by the supplier as part of door-to-door delivery; site installation, snag inspection and after-sales support close out the job.
What to prepare before you request a quote
- Measured wall elevations, including skirting, cornice and any recess the unit must sit inside.
- A layout intent: what hangs, what folds, what sits on display shelves.
- Glass preference and the safety requirement that applies in your market, confirmed with your own consultant.
- Frame finish reference, and whether it must match other metalwork in the project.
- Whether integrated lighting is required, plus the wiring route and switch position.
- Delivery location, access constraints and the installation party responsible on site.
Related configurations in the same collection
If the glass version is not right for every room on the project, the wider open wardrobe range lets you change the enclosure without changing the joinery discipline. Metal Frame Open Wardrobes takes a slimmer, more industrial line, while Open Walk in Wardrobes works where the room gives you a dressing space rather than a wall run. All three are specified the same way, so one set of drawings and one finish schedule can carry across bedroom, dressing room and corridor.
Where OEM sourcing goes wrong, and how to avoid it
The most common failure is not the manufacturing. It is a specification that was frozen before the site conditions were verified. Open wardrobes expose everything: an uneven floor, a ceiling that is out of level, or a hanging rail placed where a door will swing into it all become visible defects once the glass goes in. Two habits prevent most of this. First, take final measurements after wall and floor finishes are complete, not at first fix. Second, confirm the dimensions and selected specifications for each unit individually, rather than assuming two identical bedrooms produce two identical wardrobes.
The second risk is scope drift across trades. Glass, lighting, joinery and the wall behind it are often three different suppliers on one project, and nobody owns the junction. Bringing built-in furniture, lighting and interior fixtures to a single turnkey supplier removes that gap, because the same production team sees the wardrobe carcass and the light fitting it has to house.