A media wall looks simple on a drawing until the quote arrives. The line that reads "feature wall, as per design" can hide half a dozen decisions that change both the price and how the finished wall behaves. If you are specifying Santerson Full Height Media Walls for a villa living room, an apartment renovation or a hotel suite, here is what a complete supplier quotation should state before you sign it off.

1. Dimensions taken from the site, not from the drawing

Full-height systems run floor to ceiling, so a few centimetres of variation in slab height or wall straightness shows up immediately on site. A serious quotation records the overall width and height it is pricing, plus the room for adjustment it has allowed at the top and bottom reveals.

Check three things on the numbers:

  • The dimensions are tied to a named elevation or drawing revision, with the revision number printed in the quote.
  • The split into modules is shown, not just one lump width — this tells you where joints will fall against the TV and shelving.
  • Out-of-square walls, skirting removal and any ceiling bulkheads are called out as separate items rather than assumed.

2. The finish schedule, written out panel by panel

Veneer, lacquer, laminate and wood-effect surfaces can all be specified on these walls, and each one prices differently and ages differently. A quote that says only "finish: oak" is not comparable with a competitor's quote.

Ask for the finish schedule to list the substrate, the surface material, the colour or grain reference, and whether the veneer runs in one direction across the whole wall or reverses at each door. Grain matching between a media wall and adjoining Santerson Integrated TV Panels is worth naming explicitly, because it is exactly where two suppliers with different prices will produce visibly different results.

3. Storage layout and hardware

The same elevation can carry open niches, closed cabinets, drawers or a mix, and the hardware inside those cabinets is where budget versions quietly lose quality. The quotation should show the internal layout of every compartment — shelf spans, drawer counts, and whether doors are hinged, sliding or pocket.

For anything that moves, look for the hinge and runner brand and the closing mechanism in writing. If you want Santerson Sliding Panel TV Systems, where a panel conceals the screen, the quote must also state the track type, the load rating for the panel material you have chosen and how the panel is guided at the floor. A sliding wall priced without those details is an open-ended cost.

4. Television, cable and electrical provision

A media wall is a piece of joinery with services running through it, and the two trades have to agree before production starts. Your quotation should confirm:

  • The TV size and mounting method the recess or panel was designed around, and whether the bracket is included.
  • Where the power outlets, data points and any conduit sit behind the screen, and who supplies that first fix.
  • Whether integrated lighting is part of the wall, which transformer or driver is supplied, and where it is left accessible for service.

Integrated lighting looks cheap to add at quotation stage and expensive to retrofit after the panels are made. If it is in the price, ask what happens if your electrician's cable runs differ from the drawing.

5. What is actually being delivered, and by whom

Configurable wall systems are made to order, so the commercial terms matter as much as the technical ones. Before you compare two numbers, confirm that both quotes cover the same scope:

ItemWhat a complete quote states
Packaging and freightPack type, container or pallet plan, Incoterms, destination, and who handles customs clearance
Site readinessWall and floor levels expected on arrival, and any packing or protection needed before the joinery lands
InstallationWho fixes the units on site, whether an installer or supervisor travels, and what snags are covered afterwards
Change controlThe cut-off date for dimension changes after approval, and how a late change is priced
Trade sequencingWhich comes first — flooring, plaster and paint, or the joinery — and who coordinates it

SANTERSON describes its service as running from design consultation and material selection through production, logistics, installation and after-sales support, so use those stages as your checklist. If a stage is not priced, it is not included — get it in writing either way.

6. Matching the wall to the rest of the fit-out

A media wall rarely sits alone. Where it touches engineered flooring, a fireplace surround or a run of kitchen cabinetry, the junction details should be on the drawing before the quote is finalised. Ordering the Santerson Full Height Storage Walls and the kitchen from one manufacturer reduces the argument over who owns the meeting point, but only if both are drawn to the same levels.

A quick test: hand the quote to someone who has never seen the project. If they cannot tell what is included, what is excluded and where each panel joint falls, it is not a quotation — it is an estimate.

Before you sign

Send your elevation, the room dimensions taken on site and your services drawing, then ask for a line-by-line breakdown. Compare suppliers on identical scope: same modules, same finish references, same hardware, same delivery terms. That is how you find out whether a lower price is a better deal or simply a shorter list of promises.