Interior doors look like a simple line item until the first site visit. A door that reads perfectly on a rendering can fail on site because the opening was framed two centimetres narrow, the floor build-up added height nobody accounted for, or the leaf swings into a switch plate. Standard interior hinged doors are one of the most repeated elements in a villa or apartment package, which makes them one of the fastest places to lose time and money when drawings and site conditions do not agree. The notes below follow the sequence we use on residential and hospitality projects: fix the door schedule from drawings, verify it against what the site actually delivers, then release production.
Start From the Door Schedule, Not the Product Catalogue
Before any product selection, ask for a door schedule that lists every opening in the project. A usable schedule records the opening reference from the floor plan, clear width and height, leaf count, swing direction and hand, frame type, finish, ironmongery set, and whether the leaf is single-action, double-acting or paired. Where a project has no schedule, produce one yourself from the architectural drawings and send it back for written confirmation. That single document prevents most of the arguments that appear later.
Our Standard Interior Hinged Doors are made to measure rather than supplied in fixed sizes, with material and finish options and a layout set for each project. That flexibility is an advantage only when the schedule is complete; if dimensions are still moving, made-to-measure production simply reproduces the confusion at factory scale.
Reading the Drawings Correctly
Three drawing checks catch most coordination errors before they reach the workshop.
1. Confirm which dimension the architect actually sized
Plans often dimension the structural opening, while elevations and details describe the finished leaf size. Those two numbers differ by the frame section and the setting gap. Request one consistent reference for every door, and state on the schedule whether each figure is a structural opening or a finished aperture. Never mix the two conventions in one list.
2. Trace the floor build-up
Screed, adhesive, engineered wood flooring, thresholds and acoustic underlay all consume clearance. A door scheduled with a 10 mm undercut over a bare slab will bind once the finish floor is laid. Cross-check the door threshold levels against the floor construction notes, especially where engineered timber runs through from corridor into room.
3. Check the swing against services and joinery
Overlay the swing arc on the electrical and furniture layouts. Switch plates, radiator positions, wardrobe returns, vanity units and wall-hung cisterns all reduce the usable arc. Where the arc conflicts, resolve it in the drawing stage by changing hand, reversing swing or moving to a sliding or pocket arrangement instead of negotiating it with an installer later.
Site Verification: What to Measure and When
Drawings describe intent; site survey records reality. We schedule the survey for after the openings are formed, services first fix is complete and floor levels are established, but before plasterboard finishes or wet trades close the walls. At that point the openings can still be adjusted cheaply.
| Item to verify on site | Why it matters |
|---|---|
| Opening width and height at three positions each | Openings are rarely square; the smallest measurement governs the frame you can set. |
| Wall build-up and leaf alignment face | Determines frame depth, architrave choice and whether the leaf sits flush on one side or both. |
| Finished floor level at each threshold | Sets leaf height and undercut; wrong clearance means binding or visible gaps. |
| Cornice, skirting and reveal conditions | Architrave profiles must resolve against skirting runs, not be cut to fit on site. |
| Adjacent switch, socket and handle heights | Handle-to-wall clearance and leaf-to-plate gaps are recurring snag items. |
| Structural lintel and fixing substrate | Frame fixings need solid substrate; hollow block or steel studs need specified anchors. |
Return the survey as a marked-up plan plus a measured table, not photographs alone. Photographs support the record but they do not give an installer dimensions.
Rule we hold to: nothing goes into door production until every dimension on the schedule has been confirmed against a site measurement or a signed architectural detail. Confirm dimensions and selected specifications for each project before release.
Finish, Ironmongery and Interface Details
A hinged door is an assembly, and the interface details decide how it reads once installed. Specify these alongside size:
- Leaf construction and core. Match the core to use: a bathroom leaf needs a moisture-resistant core and a suitable undercut; a study or media room benefits from a denser core and perimeter seal.
- Surface finish. Paint-grade, lacquer, melamine, wood veneer and decorative panel designs each behave differently on site. Paint-grade leaves need a protected site store; veneered leaves need the same grain direction called out across a run of doors. Confirm the approved finish against a retained sample before production release.
- Frame and architrave profile. Fix the profile against skirting heights and reveal depths drawn elsewhere in the package.
- Hinges and ironmongery. Hinge count and position depend on leaf weight and height; lever furniture, lockcases, closers and privacy sets must be pre-cut at factory where possible rather than mortised on site.
- Acoustic and privacy intent. Where a room is specified for acoustic separation, seals, thresholds and the detailing around the frame have to be drawn - the leaf alone does not deliver it.
Where a design calls for a door that disappears into the wall plane rather than reading as a framed opening, that is a different assembly with its own frame and fixing detail. Our Flush Wall Aligned Doors sit in the Flush / Concealed Doors collection and are specified on their own details, not substituted onto a standard hinged schedule. Similarly, decorative panelled designs such as Classic Panel Hinged Doors need the panel layout drawn to the actual leaf size, because moulding proportions that look right on a 2040 mm leaf look wrong stretched over a taller one.
Ordering in Batches and Protecting the Programme
Doors rarely suit a single release. On larger villa and apartment packages we have found it practical to split production into batches, which keeps the programme moving while later rooms are still being set out. A typical sequence is:
- Release 1 - wet areas and corridors. These openings are formed early and their levels stabilise first, so they can be produced while later rooms are still being set out.
- Release 2 - bedrooms and studies. Released once fitted joinery and interior fixtures layouts are frozen, since wardrobes and built-in units govern the usable swing.
- Release 3 - feature and altered openings. Anything affected by site revisions goes last, with a written change note against the original schedule line.
Keep the schedule as a live document with a version number and issue date on every page. Every change to a door line should record what changed, why, who authorised it and which site area it affects. That record is what makes a late revision a cost conversation instead of an argument.
A Pre-Production Checklist
- Schedule line for every opening, referenced to the plan numbering.
- All dimensions stated on one agreed basis, structural or finished, with gaps called out.
- Site survey signed off against that schedule, exceptions listed per opening.
- Swing hand and direction confirmed against services and joinery layouts.
- Leaf height and undercut checked against finish floor levels, including thresholds.
- Frame depth matched to measured wall build-up, with tolerance stated.
- Finish type, colour or grain reference approved in writing, with a sample retained.
- Ironmongery set specified per door type, with pre-cut details issued.
- Storage and installation sequence agreed, so early deliveries are not damaged on site.
How Coordination Works When the Supplier Is Overseas
On projects where doors, joinery and finishes come from one manufacturer, coordination becomes simpler because a single team holds the schedule for all of it. As part of our Turnkey Solutions, drawings are reviewed against production capability before release, dimensions are confirmed with the site team, and deliveries arrive in the sequence the programme needs rather than as one container that has to be sorted on arrival. Installation support and snag inspection close out the same scope, so the party who measured the openings is accountable for how they fit. Warranty terms and response times are agreed per project rather than assumed.
The discipline is the same whether the doors come from one factory or five: fix the schedule, verify it against the site, resolve interfaces on paper, then produce. Doors are a low-cost item that can cause disproportionate delay when this order is reversed.
Send us your door schedule and drawings. We review openings, dimensions, finishes and ironmongery against your package and return a coordinated proposal for villa, apartment and hospitality projects.