Modular Shelving Systems · Built-in Furniture · Project Procurement

Floating modular shelves look simple on a drawing. A few wall-mounted boxes, an even rhythm, a clean shadow line. On site they are one of the easiest items to get wrong, because nothing hides: every dimension, finish and fixing is visible the moment the unit is installed. This guide walks through how we plan quantities and coordinate Santerson Floating Modular Shelves with the rest of a wall-system package, so the order that leaves the factory is the order your site can actually install.

What You Are Actually Ordering

Santerson Floating Modular Shelves sit inside our Modular Shelving Systems collection and are made for residential wall system projects. The listing is deliberately open: finish, layout and dimensions are specified per project, with made-to-measure sizing and material and finish options. That flexibility is the point of the product, but it also means the quantity you request has to be defined by you, the buyer or contractor, rather than picked off a standard catalogue line.

For this reason we treat a floating shelf order as three decisions taken in sequence: what goes on the wall (layout and module sizes), what it is made of (material and finish), and what supports it (fixings, substrate and any integrated lighting). Change one late and the other two move with it. A quantity list that only says "floating shelves, supply and install" cannot be priced or produced accurately.

Every dimension, material and hardware selection on a modular shelving order should be confirmed against the approved drawings for your project before production starts. The specification below is our planning framework, not a standard product datasheet.

Step 1: Set Out the Wall Before You Count the Units

Count modules from the wall, not from the elevation drawing alone. For each wall that carries shelving we ask for:

  • Finished wall line. Floor-to-ceiling height and clear width after plaster, paneling and skirting are complete, not the structural dimension.
  • Setout grid. Where modules start relative to a fixed reference such as a door reveal or room corner, and how the last module absorbs any remainder.
  • Service conflicts. Sockets, switches, data points and air grilles that fall inside the shelving zone.
  • Substrate. What sits behind the finish line: masonry, timber stud, steel stud or an existing panel system. Floating units need continuous solid backing or a designed carcass to carry load.

If the wall already carries a panel line from our Wall Panel Systems range, say so at the outset. Shelf fixings then have to pass through or around the panel line, and that decision changes both the bracket detail and the installation sequence.

Step 2: Break the Wall into Countable Modules

Quantities are easiest to control when each line on the schedule is a single module with its own size, finish and fixing note. We suggest this structure for the order list:

Schedule columnWhat to recordWhy it matters
Module codeOne code per unique size, e.g. FS-01, FS-02Repeats share one production drawing; every new size adds a drawing and a setup.
QuantityNumber of each module, by room and wall referenceKeeps packing, delivery sequencing and site installation aligned with rooms rather than with the whole floor.
Width / height / projectionFinished external size in millimetresProjection drives bracket design and load path; it is not a cosmetic number.
Material and finishBoard material, surface, edge treatment, colour referenceCarcass, shelves and edges can differ. Record each separately or the factory will assume one spec.
Open or closedOpen shelf, closed box, mixed unitClosed units need door hardware, hinge type and clearance; open units do not.
LightingNone / integrated lighting provisionAny lighting requires electrical specification and compatibility confirmation before the carcass is cut.
Fixing noteSubstrate type and chosen fixing methodTells the site team what preparation to complete before the shelves arrive.

Two habits save rework. First, keep the number of unique module sizes small: a handful of sizes repeated across a floor is far easier to price, produce and install than one-off units in every position. Second, group by room in the schedule, because installation crews work room by room and will want each room's modules packed together.

Step 3: Coordinate the Rest of the Shelving Family

Floating shelves rarely appear alone on a wall. When they sit next to other Modular Shelving Systems products, mismatched finishes and depths are a common complaint at handover. The collection includes several related configurations that should be specified as one package:

When these items are ordered together, we produce them from one set of approved drawings and match materials, finishes and edge details across the whole wall. Ordered separately, at different times, they can arrive with different surface references even where the colour name looks the same on a sample card.

Adjacent items to check against the same drawings

Shelving interacts with more than shelving. Before we release an order we cross-check the wall against the joinery and fixture packages that share it: Santerson Wall Mounted Shelves in the bookshelf range, Santerson Open Display Niches where shelving is recessed into a storage wall, and Santerson Shelving Accessories for smaller configurable shelving items in bathrooms and utility areas. If any of these sit on the same wall, they belong in the same coordination round.

Step 4: Lock Finishes and Materials Once, Not Three Times

Modular shelving is where finish inconsistency shows up quickly, because open shelves expose both faces of a board. For each module record the carcass material, the shelf material, the surface finish selected for the project, the edge treatment and a physical colour reference. Where a project already uses matching cabinetry, request the same finish specification used on that cabinetry package rather than naming a colour in words.

Our Custom Furniture Design and Prototyping service covers bespoke finishes, textures and materials such as wood, metals, engineered stone and laminates, along with prototyping before full production. For a wall that carries floating shelves plus joinery, one prototype board in the selected finish settles far more questions than a printed sample.

Step 5: Plan Delivery and Installation Around the Schedule

Built-in shelving is a finishing trade item. It should arrive after wet trades, flooring and wall finishes are complete, and after the substrate preparation noted in the schedule has been signed off. We organise this as part of Furniture Logistics and Door-to-door Delivery, covering freight forwarding, packaging and container loading, customs paperwork and delivery to site, and we support Furniture Installation and After-sales Support including on-site installation and inspection with the project team.

Practical points that decide whether installation goes smoothly:

  • Pack by room and wall reference, matching the schedule codes, so installers are not sorting mixed cartons in a finished room.
  • Confirm substrate preparation before units ship. A floating unit cannot be fixed to an unsupported finish line.
  • Confirm electrical first-fix for any lit module before the carcass is produced, and again before installation.
  • Allow a snag window after installation for alignment of open shelves, where uneven lines are visible from any angle.

A Short Example: One Living Room Wall

Take a living room wall in an apartment project, with a floor-to-ceiling storage run on one side and a floating display run opposite. Priced as "shelving, 1 lot" the order is unworkable. Priced as a schedule it becomes: modules of the floor-to-ceiling system at fixed widths to close the left bay; identical floating boxes at one size for the display run; an open shelf module spanning the media position; integrated lighting provision on two display bays only. A short list of unique sizes, one finish specification shared with the kitchen joinery package, and a fixing note recording timber stud with solid backing boards at each bracket line.

That version of the list can be quoted, produced from a small set of production drawings, packed by zone and installed in sequence. It is also the version we can check against your drawings and come back on quickly if something does not resolve.

If you would like a shelving schedule reviewed before an order is placed, send the elevations with room references and we will mark up module sizes, quantities and finish notes for coordination.

Before You Send the Enquiry

As a manufacturer working on villa, hospitality and office projects, we handle SANTERSON furniture and building materials from design and production through to delivery and installation support. For a modular shelving enquiry, sending the following lets us reply with something usable rather than a questionnaire:

  • Room-by-room elevations with finished dimensions and wall references.
  • Your draft module schedule using the columns above, even if unfinished.
  • The finish specification of any joinery package that shares the wall.
  • Substrate information for the walls carrying floating units.
  • Target delivery location and required site sequence.

Talk to us about your modular shelving package

Send drawings and a draft quantity schedule, and our project team will coordinate the shelving schedule with the rest of your built-in furniture package. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the Contact Us page.