A glass walk-in wardrobe looks simple on a rendering and complicated on site. The difference is usually the quality of the brief that went into it. This guide sets out what a buyer, contractor or design consultant should lock down before the first drawing is issued, so the quotation you receive is comparable and the installation lands without a list of snags.

Why glass walk-in wardrobes need a more detailed brief than a standard wardrobe

A closed wardrobe in a laminate or lacquered finish hides most of what is inside it. A glazed one does not. Glass frontage exposes the interior layout, the framing profile, the hardware and every tolerance mistake in the surrounding walls and floor. That is why our Glass Walk in Wardrobes range is quoted per project rather than from a fixed catalogue price: sizing, finish and internal layout are all set to the space.

In procurement terms, three things drive cost and programme:

  • Framing and glass specification — profile material, profile colour, glass type and any tints or textures. These are visible decisions with a visible price difference.
  • Internal fit-out — hanging zones, shelving, drawers, lighting and island units if the room allows them. This is where most change orders appear.
  • Site interface — floor levels, ceiling heights, skirting, cornices, recessed lighting and door openings. A walk-in room rarely has square walls, and glass does not forgive it.

Section 1: Scope and layout definition

Start the brief with the plan, not the finish. State which configuration the project requires and why. Our walk-in collection covers several distinct layouts, and each one changes the quotation.

LayoutWhere it belongs in a projectWhat to state in the brief
L Shaped Walk in WardrobesBedroom suites where storage runs along two walls and the room is entered from a corner or corridor.Both run lengths, the return dimension, clearance for the entry opening and whether the corner bay is to be usable storage or a structural return.
U Shaped Walk in WardrobesDedicated dressing rooms and larger villa master suites with a central walking zone.Three run dimensions, the clear walkway width between opposing runs, and which run carries the tall hanging zone.
Island Walk in WardrobesDressing rooms with enough floor area for a freestanding centre unit.Island footprint, drawer configuration, top surface material and the circulation gap around all four sides.
Open Walk in WardrobesBoutique-style display rooms, show suites and hotels where frontage glazing is not required.Whether the room is fully open or partially glazed, plus dust-protection expectations for textiles on display.
Boutique Style Walk in WardrobesRetail-fit dressing rooms, penthouses and hospitality suites where the wardrobe is a display feature.Display lighting scheme, glass frontage type, and whether accessories and mirrors are part of the supply.

Dimensions in the brief should be given as finished-floor-to-finished-ceiling, with the floor build-up noted if screed or finishes are not yet installed. Where levels are unresolved, ask for a site survey before the order is placed rather than guessing.

Section 2: Glass and framing specification

This is the section most often left blank at tender stage, which produces quotations that cannot be compared. Specify the following explicitly:

  • Glass type — clear, frosted, smoked, bronze or ribbed. Tint and texture change both the price and how much of the interior is legible from the doorway.
  • Frame material — aluminium-framed frontage behaves differently from a board-based door in terms of sightlines, edge detail and how the unit meets an uneven wall.
  • Frame colour and finish — state the reference you want matched, and note whether frames should align with other metalwork in the project such as shower screens or internal glazing.
  • Frontage operation — hinged, sliding or open frontage. Sliding frontage needs track clearance and a level floor run; hinged frontage needs swing clearance checked against the walkway.
  • Handle detail — integrated profile handle, recessed pull or external handle. This is a visible cost item that clients notice late.

Where the brief calls for aluminium-framed glazing on wardrobe doors, note it separately from the walk-in carcass specification. Frame profiles and glass are quoted as their own line items, so bundling them into one line makes substitutions hard to spot when you compare two suppliers.

Section 3: Interior fit-out

Glass frontage only shows what you specified inside it. Give the interior layout as its own schedule in the brief:

  • Hanging zones by length, with long-hang for dresses and coats separated from short-hang.
  • Shelving spans, and whether any shelf needs reinforcement over a wide run.
  • Drawer banks — count, depth and whether soft-close is required throughout or only in the primary bank.
  • Tray and accessory storage for watches, jewellery and folded knitwear.
  • Shoe storage orientation and shelf pitch.
  • Internal lighting — door-triggered, motion-activated or linked to the room circuit, with the switching point stated.

If the project has a mixed requirement — for example glass-fronted zones at the entry and closed panel storage deeper in the room — say so. Combining glazed and solid frontage in one run is common and should be priced as one coordinated unit, not two separate orders.

Section 4: Site conditions and interfaces

This section protects the programme. A walk-in wardrobe is built-in work, and it fails at the interface more often than in the joinery itself. Record:

  • Floor finish type and thickness at the wardrobe line, plus whether the track sits on the finished floor or a recessed channel.
  • Ceiling detail — flush to slab, bulkhead, or with a gap for services. Note any recessed lighting that must be kept clear.
  • Wall construction and whether it can take a fixed carcass, or whether a freestanding arrangement is needed.
  • Skirting, cornice and architrave treatment at the wardrobe boundary.
  • Door opening to the room — swing direction, clear width and threshold detail.
  • Electrical first-fix points for internal lighting and any island power.

A practical rule: if the brief does not state floor levels, ceiling heights and switching points, the supplier is quoting a wardrobe that cannot yet be installed. Ask for those three items before you treat two quotations as comparable.

Section 5: Commercial terms to set in the brief

Because these wardrobes are made to measure, the commercial section of the brief matters as much as the technical one. We suggest stating:

  • Whether you need a design proposal with 3D visual renderings before quotation, or drawings only.
  • The unit count per dwelling and whether the same specification repeats across multiple apartments or villas in the development.
  • Delivery terms — door-to-door to site, or delivery to a port or depot, and who handles customs clearance on your side.
  • Installation scope — supplier-led installation with inspection and snag sign-off, or supply only for a local trades crew.
  • The approval sequence you expect: brief, proposal, quotation and detail confirmation, then production and shipment. Writing it into the brief keeps both parties working to the same gate.

For projects that need matching joinery elsewhere — bedroom wardrobes in a different finish, vanity units, media cabinetry or kitchen fit-out — list them in the same brief. One coordinated production run across several fixture types is easier to schedule and easier to reconcile at handover than separate orders placed with separate suppliers.

A short checklist before you issue the brief

  • Layout type named, with dimensions taken from finished surfaces.
  • Glass type, frame material and frame colour specified per run.
  • Interior fit-out schedule attached, not described in prose.
  • Floor levels, ceiling detail and electrical points recorded.
  • Delivery terms, installation scope and approval sequence written down.
  • Related joinery listed so it can be quoted together.

Send us the brief. SANTERSON manufactures made-to-measure walk-in wardrobes for residential and hospitality projects, with design proposals, 3D renderings, production coordination, door-to-door delivery and installation support. Share your drawings, room dimensions and finish references and we will return a specification you can compare line by line.