A request for quote is where most outdoor furniture deals are won or lost. Send a supplier a vague line such as "one corner sofa set, 3+2+1" and you will get back a price you cannot compare with anyone else's. Send the same supplier a full specification sheet and you get a quotable offer with the options already priced in. Below is the checklist we use when buyers ask us to quote an L-shaped aluminum outdoor corner sofa set with teak-look slat tops, and it applies just as well to the rest of an outdoor furniture package.
1. The configuration, not just the model name
An L-shaped corner lounge suite is a modular system. Two orders described as "the same set" can differ by several modules and therefore by a wide margin in price. State in the RFQ:
- How many seat modules, corner modules, armless modules and ottomans you need, and which end of the L returns to the wall.
- Whether the central coffee table is required, and whether the two side benches are wanted as tables, as extra seating, or both. On this style of set the side benches do double duty: they hold drinks and decor, or they seat people.
- The overall footprint you have to work with - the two leg lengths of the L, plus a clearance allowance for circulation and for doors or planters that cut into the terrace.
- Whether the layout is fixed, or whether you want alternate configurations priced: straight run, U-shape, or split into two smaller groupings.
2. Frame, slat and finish specification
The product title says aluminium frame and teak-look slat tops. In an RFQ, push one level deeper so the quote is not built on assumptions:
| Item | What to state in the RFQ |
|---|---|
| Frame material | Aluminium frame with dark powder coating. Name the colour or send a RAL reference if your facade or joinery has to match. |
| Slat surface | Teak-effect slat tabletops on the coffee table and side benches. Confirm how the slats run, and whether you want the same slat treatment repeated elsewhere in the package. |
| Fixings and feet | Level adjusters for uneven paving or timber decking, especially where a terrace falls to a drain. |
| Exposure | Tell the supplier where the set is going: villa terrace, rooftop, poolside, restaurant forecourt. Coastal and high-salt sites need a different coating spec from an inland courtyard. |
3. Cushions: fabric, colour and cleaning
Cushions are the part of a corner sofa that gets replaced first, so quote them properly the first time. Specify:
- Cushion thickness and firmness you expect for the seat pads versus the back pillows.
- Fabric type and colourway. Deep grey thick cushions are the standard neutral on this set and take coloured throw pillows well; if your scheme calls for a different tone, ask for the fabric options before the quote is finalised.
- Removable covers for cleaning. Confirm that every cover unzips and that spare covers can be ordered later.
- How many spare cushion sets you want. Hospitality buyers usually order one spare set per public-area grouping rather than raising a second purchase order later.
4. Quantities, sites and phasing
Give quantities in real terms: the number of complete sets per location, not one aggregate figure for the whole project. A resort quoting six terrace groupings and two poolside groupings should say so, because the mix of modules can differ by area. Then state:
- How many delivery addresses, and whether goods go to site or to a central store.
- Whether the order is phased against a programme - shell handover dates for villas, or soft opening for a hotel.
- Your target on-site date, and separately your PO-award date. Suppliers quote freight differently when they know which of those two dates is fixed.
5. Customisation and OEM scope
If you need anything changed from the standard product, list it as a line item so the supplier prices it instead of guessing. Module combinations, cushion fabrics and frame colours are all adjustable to suit a project design brief on this set. Also worth raising at RFQ stage:
- Bespoke dimensions where a terrace or balcony falls outside the standard module grid.
- Private labelling, engraving or packaging, if the sets are being resold under your own brand.
- Minimum order quantity per configuration, and whether an MOQ can be pooled across matching frame colours.
The supplier's custom and OEM service covers design and prototyping through to material and finish selection, so the RFQ is the right moment to raise these items rather than after an order is placed.
6. Packaging, freight and delivery terms
Outdoor furniture is bulky and awkward to handle, and freight often decides whether a quote is competitive. Ask the supplier to state in writing:
- Packaging standard and set dimensions: carton size, number of cartons per set, total volume and gross weight.
- Container loading plan - how many sets fit a 20ft or 40ft container, and whether the set can be consolidated with other categories from the same order.
- Incoterms quoted. Ask for both FOB and door-to-door so you are comparing like with like against your own freight forwarder.
- Documents supplied: commercial invoice, packing list and certificate of origin.
A single order that also covers pergolas, loungers and dining sets is usually easier to load and cheaper per set than separate orders. Our logistics and door-to-door delivery service handles freight forwarding, customs paperwork and container loading, which is why buyers often put their whole outdoor package into one RFQ.
7. After-sales terms to fix before the order
Put these in the RFQ so they appear on the quotation itself:
- Warranty scope and duration for frame, coating and cushions - separately, not as one blanket figure.
- Spare-part availability: covers, slats, feet and hardware, and how they are ordered after year one.
- Inspection and snag process on arrival, including photo documentation of any transit damage and who replaces it.
- Installation support if the sets go into a public area where layout and anchoring matter.
8. A one-page RFQ template you can copy
| Section | Fill in |
|---|---|
| Project | Project name, location, venue type (villa / hotel / F&B terrace), contact person. |
| Product | Product title or URL, reference photo, module list and dimensioned layout. |
| Specification | Frame colour (RAL if applicable), slat direction, cushion fabric and colour, spare covers quantity. |
| Quantities | Sets per location, phased delivery dates, total. |
| Customisation | Dimension changes, labelling, packaging requests. |
| Commercial | Incoterms requested (FOB and door-to-door), destination address or port, target on-site date. |
| After-sales | Warranty scope wanted, spare parts required, installation support needed. |
| Response format | Ask for a line-item quotation with unit price, packing data and lead time per line. |
Send the whole package, not one line
Corner sofa sets rarely stand alone on a terrace. Buyers who request a quote for the lounge grouping together with dining sets, loungers and a pergola get a coherent scheme, one freight movement and one point of accountability instead of three. If you are comparing suppliers, keep the module list, fabric spec and Incoterms identical across every enquiry. That is what makes the returned prices genuinely comparable.
Send us your specification
Tell us the layout, the finish and where the set is going. As a furniture and building materials supplier working on villa, hospitality and office projects, we quote L-shaped corner lounge sets with module combinations, cushion fabrics and frame colours adjusted to your design brief, packed for the site they are destined for.