A swim spa of this size rarely fails at the specification stage. It causes trouble later, when a site team discovers that the crane pad was never confirmed, the power supply does not match the installed pump set, or the maintenance access the designer assumed does not exist. The catalogue entry for Outdoor Swim Spa WS-130CⅢ-U is a good example of what a supplier publishes and, more importantly, of what it does not publish. Both matter to a procurement file.
Start With What the Catalogue Actually States
The published record for this model is short and specific: overall dimensions of 11830 × 3000 × 1430 mm, one control system, four water pumps, one filter pump, a total of 23 jets, five LED lights and a total power figure of 11.85 kW. The features listed are water jets, LED lighting and ozone. Notably, the swim training system is not listed in the captured specifications for this model, even though it appears on sibling variants in the same 130C series.
That absence is a documentation item, not a defect. Record it as an open question in your specification sheet and ask the supplier to confirm in writing whether the swim training system is included, optional or excluded for the exact configuration you are buying. Two models that share a shell size can carry different pump counts, jet totals and lighting counts, so never transfer figures from a sibling datasheet into your purchase order.
The Specification Sheet You Should Build
Take the published numbers as a starting point and expand them into columns that force a written answer. The table below shows the structure we recommend for a project file on this model.
| Item | Catalogue value | What procurement must confirm |
|---|---|---|
| Overall dimensions | 11830 × 3000 × 1430 mm | Whether these are shell, plinth or finished-installation dimensions, and the clearance needed for delivery and access routes |
| Water pumps | 4 pcs | Pump duty, voltage, phase and starting method; whether all four are required in the selected option set |
| Filter pump | 1 pc | Filter media type, flow rate and the service access needed for cartridge or media changes |
| Jet total | 23 pcs | Jet layout by zone and whether jet positions conflict with seating or bench lines on the site plan |
| LED lights | 5 | Fixture locations, low-voltage supply and control grouping |
| Total power | 11.85 kW | Whether this figure includes an optional heat pump, and the dedicated circuit, protection and earthing arrangement on site |
| Water treatment | Ozone shown | Whether UV sterilisation is added, and the dosing or maintenance regime handed to the operator |
| Swim training system | Not listed for this model | Included, optional or excluded — obtain a written answer before pricing is fixed |
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that appears in the range literature still needs confirmation against your configuration.
Power, Insulation and Climate Are Separate Line Items
A total power figure on a datasheet is not an electrical design. For an 11.85 kW baseline installation, the site engineer needs to know the supply voltage and phase, whether the figure already accounts for a heat pump, how the pumps start, and where the isolator sits relative to the spa. Insulation is a related decision: it is listed as an option in this range, and it changes both the energy profile and the enclosure detail.
Do not let marketing language about outdoor use stand in for a climate assessment. If the project sits in a cold or coastal environment, ask what insulation build-up, cover arrangement and drainage provision are supplied for that condition, and have the local engineer confirm compliance with local electrical and structural requirements. Those approvals belong to the project, not to the product catalogue.
Site Conditions Decide Whether the Deal Works
- Access and lifting. A unit close to twelve metres long needs a delivery route, a crane or forklift path and a bearing-capable base. Confirm these before the order, not at handover.
- Structure and drainage. Record the slab specification, the waterproofing detail at the perimeter and how overflow and maintenance water leave the area.
- Plant room or technical niche. Pumps, filtration and controls need a location that stays reachable. Mark the access panel sizes on the drawing.
- Operating responsibility. State who commissions the system, who trains the operator and who owns routine water chemistry after handover.
Coordinate the Spa With the Rest of the Package
A swim spa almost never arrives alone. In a villa or resort scope it sits alongside outdoor furniture for villas and resorts, poolside lighting, wall and floor finishes and sometimes pergolas or cabanas. When one supplier carries the whole outdoor package, delivery windows, packaging protection and installation sequence are managed once instead of negotiated between several vendors. That coordination is where a turnkey furniture and building materials company earns its place on a project; the alternative is a procurement team chasing five separate lead times.
For buyers who need something other than a standard rectangular shell, the range also includes customizable shape outdoor spas in square, round, oval and curved configurations. Custom geometry changes the documentation set: expect shop drawings and an approval step before production.
Logistics Terms Belong in the Same File
Record the incoterms, the mode of transport and who handles import clearance. Furniture logistics and door-to-door delivery covers sea, air and rail freight; whether the quoted price lands the unit on your site or at a port changes the landed cost materially, so write it down before comparison shopping begins. Pair it with the installation and after-sales support terms: who commissions the plant, what is covered, and how replacement pumps, jets or lighting are sourced years later.
A Short Close-Out Checklist
- Written confirmation of the swim training system status for this exact model and option set.
- Electrical schedule signed off by the site engineer against the confirmed pump and heat-pump configuration.
- Base, access route and lifting plan documented with dimensions taken from the supplier's shipping drawings.
- Option list — UV, sand filtration, insulation, steps, cover — priced and matched to the purchase order line by line.
- Commissioning, operator training and spare-parts terms recorded with named responsibilities.
Figures quoted here are transcribed from the published catalogue entry for this model. Treat every number as a starting point for confirmation against your configuration, not as a guarantee of what ships.
Close the Gaps Before the Order Is Placed
Most of the cost overruns on a project of this type trace back to questions that were cheap to ask early and expensive to answer late. Whether the swim training system is part of your configuration, whether the power figure already includes heating, and whether the quoted freight price ends at your gate or at a port are all resolved with one written exchange.
Send your site dimensions, supply details and required option list to SANTERSON, and ask for a configuration sheet written against your project rather than the standard catalogue page. If the outdoor area also needs seating, shading and finishes, put them on the same purchase order so that one team owns the delivery window and the installation sequence.