A single basin model rarely appears on a project schedule on its own. It arrives as part of a guest room bathroom package, and every line item has to survive the same three tests: does it fit the room, does it survive daily use by strangers, and can the same look be repeated across thirty or two hundred bathrooms without drift. The Freestanding Ceramic Pedestal Basin 1004S is a square, wall-fixed stand basin from our 1004 sanitary series, and it answers those three tests in a narrow, practical way. Below we set out exactly where we specify it on hotel and villa work, where we replace it with another model, and what to check before the order goes into production.
What the 1004S actually is
The 1004S is a freestanding pedestal basin in a clean square form, made from vitreous ceramic with a dense glossy glaze. It is not recessed into a countertop and it does not sit inside a vanity unit: the basin stands on its own pedestal and is secured to the wall through a back panel, which is what gives the installation its stability once fixed. A single tap hole is reserved for a one-hole faucet.
Two details matter more than the shape when a buyer reads this model into a schedule. First, the footprint: at 400 mm square and roughly 850 mm high, it occupies less wall length than most vanity units, which is why it keeps appearing in small guest bathrooms and cloakroom-type rooms rather than in wide master ensuites. Second, the fixing method: because the load path runs through the back panel into the wall, the substrate behind the basin has to be capable of taking that fixing. On a hotel refurbishment with stud partitions or on a villa with cavity masonry, the blocking or backing needs to be drawn before the tiles go on, not decided on site.
| Model | 1004S, part of the 1004 sanitary series |
|---|---|
| Form | Square freestanding pedestal basin, wall-fixed by back panel |
| Overall size | 400 × 400 × 850 mm |
| Material and finish | Vitreous ceramic with glossy glaze |
| Faucet provision | Single tap hole |
| Series partners | 1004A one-piece toilet, 1004B wall-hung basin, 1004F wall-hung bidet |
Sizes and plumbing rough-in on our product pages are working figures. For any project order we confirm them against the current technical data sheet with your services engineer before manufacture, because trap positions and waste centres are exactly where a specification goes wrong if it is copied from a catalogue instead of checked.
Hotel projects: guest room bathrooms, cloakrooms and refurbishments
In hospitality the 1004S earns its place in the small, high-traffic rooms. Guest bathrooms in city hotels, boutique properties and serviced apartment blocks are often too shallow for a vanity run, and a stand basin keeps the washbasin where guests expect it without eating into the circulation space in front of the shower. Because the pedestal stands clear rather than being boxed into joinery, there is no cabinet carcass to swell at the floor line, no moisture trap behind a unit, and the mopping route around the base is straightforward for housekeeping.
Glaze quality is the other reason buyers keep specifying this type of basin rather than replacing it. Housekeeping cleans these basins several times a day with whatever the contract allows, and a dense glazed surface that resists staining, limescale and yellowing is what keeps year three looking like handover. That is also why we push hotel clients to order basins, toilets and wall-hung ware from one series rather than mixing suppliers by product category: the glaze tone, the radius of the corners and the silhouette all read as a set or they read as a compromise.
For refurbishment work specifically, a wall-fixed stand basin is often the least disruptive route. Where the existing waste and supply positions are broadly usable, the 1004S can be fixed to the finished wall through its back panel without rebuilding a vanity wall or fabricating a countertop support frame. That said, we do not claim it drops onto any existing rough-in: drain centres, the depth of the waste connection and whether the wall can take the fixing all get checked against the survey before we quote.
Where we specify it in guest rooms and where we do not
- Guest bathrooms with limited width. The 400 mm square plan leaves room for a shower enclosure and a door swing that a wider vanity would block.
- Cloakrooms and pool-level washrooms. Robust, self-supporting, no joinery to damage around sinks used by people who never booked a room.
- Serviced apartments and short-let stock. A matched set of basin and toilet photographs well, wipes clean, and is easy to replace part for part years later.
- Not for double-sink master ensuites. Two 1004S basins side by side rarely give the counter space guests expect; a double vanity or two wall-hung basins with counter space is the better answer there.
- Not where counter space is non-negotiable. A stand basin gives you a basin, not a work surface. If guests need room for toiletries and a tray, choose a wall-hung basin with a glass or stone shelf, or a vanity from the same series.
Villa projects: guest wings, pool houses and secondary bathrooms
On residential work the pattern inverts. In a villa master ensuite the client usually wants storage and counter space, so vanities and integrated countertop vanities lead the schedule. The 1004S is strongest in the rooms that a villa has many of and nobody specifies carefully: the guest wing bathrooms, the powder room off the entrance hall, the pool house or cabana bathroom, the staff or annexe bathroom, the bathroom on a lower floor that serves a study or gym.
Those rooms share a problem. The architect has given them two or three square metres, and once the toilet and shower are set there is no wall left for a unit. A square stand basin with a strong vertical line solves the layout and, because it is freestanding rather than built in, it also reads as a deliberate object in the room instead of filler joinery. In villas where we supply turnkey interiors, we usually carry the 1004S through the secondary bathrooms and keep vanities in the principal ones, so the house has one consistent ceramic language without every bathroom being asked to do storage duty.
Outdoor-adjacent rooms deserve a note. A pool house or garden cloakroom is a damp environment with frequent rinse-downs, which is one reason a fully glazed ceramic basin on a pedestal is easier to live with there than timber-based joinery. The basin itself handles that setting well; the wall behind it, the sealants and the faucet finish are what need specifying for splash exposure and for whatever local water conditions apply.
Buying it as a set: the 1004 series across a whole project
The commercial argument for a series rather than a mixed order is coordination cost, not price per piece. When basins, toilets and bidets come from one manufacturer in one batch, the glaze batch, the corner radii and the silhouette are consistent, they arrive together, and replacements later in the building's life can be matched to a model number instead of being sourced by eye.
- 1004S — freestanding pedestal basin, 400 × 400 × 850 mm, for compact rooms and refurbishments.
- 1004B — wall-hung basin with a trapezoid profile, which frees the floor plane entirely and suits bathrooms where a cleaner visual line or easier floor cleaning matters more than a self-supporting pedestal.
- 1004A — one-piece washdown toilet with P-trap and S-trap installation options, so the same model can serve rooms with a wall drain and rooms with a floor drain.
- 1004F — wall-hung bidet for markets and villa clients who specify one as standard.
Around that core, the rest of the bathroom usually comes from the same purchase order anyway: shower sets, mirror cabinets, vanity lighting, tall storage cabinets. Consolidating those categories with one one-stop supplier is what removes the arguments between trades at handover — nobody can point at a different supplier for the tap that does not match the basin or the light that does not match the mirror.
What to confirm before you place the order
- Wall construction and fixing. Confirm the substrate behind each basin position can take the back-panel fixing, and have noggins or backing blocks drawn into the partition detail.
- Rough-in geometry. Waste centre, trap type and supply positions measured on site against the technical data sheet, not taken from the previous project.
- Faucet height and reach. A single tap hole means one faucet; check its spout reach against the basin depth so it lands in the bowl and not on the rim.
- Spare parts strategy. Order a percentage of spare basins with the main package. Matching vitreous ceramic and glaze tone years later, after a breakage, is harder and slower than holding stock.
- Local standards and approvals. Compliance requirements for sanitary ware differ by market. Confirm them with your certifying authority or local specifier; we supply to the specification you give us rather than asserting a certification on your behalf.
A note on figures. The dimensions, series pairings and finish descriptions above come from the published product pages for the 1004 series. Treat them as specification starting points: final sizes, rough-in dimensions and any certification or performance claims are confirmed against the current technical data sheet before production, and any figure that matters to your drawings should be signed off in writing with our project team.
How this fits into a wider hotel or villa package
SANTERSON has been manufacturing furniture and building materials in China since 2008, and sanitary ware is one category inside a broader project package that also covers outdoor furniture, lighting, carpets, wall panels, aluminium ceilings and cladding, engineered flooring, kitchen cabinetry and joinery. For a hotel or villa developer the practical benefit is not that one company makes everything — it is that one contract carries the coordination: space planning and specification, custom and OEM work where a standard model does not fit, production and quality control, freight by sea, air or rail with the customs paperwork, then site installation and after-sales support.
If you are pricing a bathroom package for a hotel floor or a villa guest wing, send us the room set, the fixture schedule and the wall construction. We will tell you which rooms take the 1004S, which ones need a wall-hung basin or a vanity instead, and what the whole set costs delivered — rather than quoting one basin in isolation.
Frequently asked questions
Is a freestanding pedestal basin harder to install than a wall-hung one?
Not materially. The 1004S still fixes to the wall through its back panel, so the wall preparation is similar to a wall-hung basin; the difference is that the pedestal carries the front of the unit instead of leaving it cantilevered. What both need is a solid fixing substrate behind the finished surface.
Can the same basin be used in every bathroom on a hotel floor?
Only if every bathroom has the same geometry and the same counter-space requirement. In practice we split the schedule: stand basins in the compact guest bathrooms and cloakrooms, wall-hung basins or vanities where guests need a work surface, and one model number per room type so procurement and future replacements stay simple.
Does the 1004S come with a faucet or waste?
The basin has a single tap hole; faucet, waste and connections are specified separately so you can match the finish and the flow requirements your project already uses. Tell us the faucet model and we will confirm the pairing before production.
Can the size or glaze colour be changed for a project?
Standard catalogue dimensions are what we ship by default. Custom and OEM work — finishes, textures and non-standard configurations — is handled through our custom service, and feasibility depends on quantity and tooling, which we confirm case by case rather than promising in advance.
Send us your room set and fixture schedule and we will price the full bathroom package for your hotel or villa project: contact SANTERSON.