A washer-dryer cabinet arrives on site in three pieces of information, not one: the unit itself, the drawings that define it, and the packing that kept it intact in transit. Most buyers spend their procurement effort on the first two and treat the third as the supplier's problem. That is where damage claims, missing hardware and stalled installation tend to begin.
Because these cabinets are made to measure for each project — our WasherDryer Cabinets are built to project-specific dimensions, layout and finish — there is no standard carton that fits them. Packaging has to be specified the same way the cabinet is. Below is the list we suggest you work through before production starts, rather than after the crates land.
Start With How the Unit Is Broken Down
A made-to-measure laundry cabinet usually ships as loose panels and assembled modules, not as one solid box. Ask the supplier to confirm, in writing and on the drawings, which parts leave the factory pre-assembled and which travel flat. That single decision drives everything downstream: crate size, panel protection, the number of packages per bathroom set, and how much site labour your fitter needs.
- Assembled versus knock-down. Pre-assembled carcasses reduce on-site error but need larger crates and more care against racking in the container. Flat-packed panels save space and freight, and shift assembly time to your installer.
- Countertop and worktop handling. Stone or engineered-stone tops travel separately from cabinets and need edge protection and upright loading. Confirm whether the top is packed with the unit or as its own package.
- Appliance recesses. The cabinet opening is sized to the machine you specify. Packaging cannot protect an opening that was dimensioned against a machine model never confirmed, so match the appliance datasheet dimensions before packing begins.
Confirm the Packing Specification Itself
Ask for the packing method in words you can check against your receiving documents, not a phrase such as "export standard". The details that matter for cabinetry on international freight:
| Item to confirm | Why it matters on site |
|---|---|
| Crate type and construction | Plywood or OSB crates with internal bracing survive container transit far better than cardboard alone; know what you are expecting at the port. |
| Panel edge and corner protection | Finished edges and corners are where damage shows first and is hardest to repair on site. |
| Surface interleaving | Protective film or interleaving between finished faces prevents abrasion and moisture marking between stacked panels. |
| Moisture barrier | Sea freight moves through condensation cycles. Ask what wrapping isolates boards from humidity. |
| Hardware packing | Hinges, runners, handles and fixings should be bagged, tagged and matched to the panel they belong to — ideally in labelled sub-boxes inside the crate. |
| Marking and labelling | Crate numbers must match the packing list and the room or unit number on your drawings, or unloading becomes guesswork. |
| Loading plan | Ask how crates will be positioned in the container; heavy tops flat on the floor, tall carcasses upright and strapped. |
Our logistics service covers packaging and container loading within door-to-door delivery, along with freight forwarding by sea, air and rail, customs paperwork and shipment tracking. What we cannot do is guess your receiving conditions for you — tell us the port, the storage conditions between delivery and installation, and who signs the goods in.
Match the Packing List to the Room Schedule
On a multi-unit project, the packing list is the document your site team actually works from. Request that each crate be labelled with the same unit and room reference used in your drawings and schedule of finishes. A list that reads "10 crates, 42 packages" tells you nothing at the eighth apartment; one that reads "Unit 12 – Laundry: crate 3 of 4" tells the fitter exactly where to stop unpacking.
Also confirm what is included in the paperwork package with the shipment — commercial invoice, packing list and any certificates your customs broker needs. Import requirements differ by country, and a missing document holds a container at the port regardless of how well the goods were packed.
Set the Inspection Point Before Unloading
Decide in advance who opens the crates, where, and what happens if something is damaged. Photograph intact crate exteriors before opening, then inspect contents against the packing list while the packaging is still available — carriers and insurers need the original packing to assess a claim. If damage is found, note it on the delivery receipt at that moment; a clean signature afterwards weakens the case.
Practical rule: state your acceptance criteria in the order confirmation. What counts as acceptable packaging, who inspects, within what window damage must be reported, and how replacements ship. Two paragraphs agreed before production save weeks of argument after arrival.
Coordinate Packaging With the Rest of the Laundry Fit-Out
Laundry joinery rarely arrives alone. Where a project also takes Stacked Laundry Units, hampers, tall storage or a combined laundry and storage run, the crates for those items should be planned together so one container holds a coherent set per unit rather than three partial deliveries. Consolidating related items also reduces the number of times a finished space is exposed to handling.
If your project uses Compact Laundry Solutions for smaller bathrooms, expect a different crate profile again — smaller footprint, but more individual packages per floor. Ask for the package count per unit type before you book storage space or labour.
Questions Worth Putting in Writing
Can I see a packing method and a sample crate photo before production?
Yes, and you should. A photograph of the packing arrangement for a comparable unit tells you more than a paragraph of specification.
Who is responsible if goods arrive damaged?
Responsibility depends on the agreed delivery terms and whether cargo insurance was taken. Confirm both, in writing, before shipment — do not assume door-to-door includes cover for the goods themselves.
Will the crates fit through my site access?
Check crate dimensions against lifts, stairwells and door widths on upper floors. Oversized crates that cannot reach the apartment are a site problem you pay for twice.
What about storage before installation?
Tell us how long goods will sit and in what conditions. Cabinets stored damp or unpacked on a construction floor arrive damaged even if the packing was correct at the port.
Send us your laundry layout, appliance models and delivery location, and we will confirm the cabinet specification together with the packing method, package count and crate markings for your project. Contact SANTERSON — PHILLIP, +86-13928214007, santerson@qq.com.